Wellbore tripping advisor
Abstract
A method for determining a maximum tripping velocity for tripping a downhole tool string in a wellbore includes obtaining contextual data including wellbore data, tool string data, and drilling fluid data; computing downhole drilling fluid pressures at multiple tool string velocities and accelerations using the obtained contextual data and a wellbore hydraulics model; generating an equivalent circulation density (ECD) contour along a two-dimensional acceleration and velocity parameter space from the computed downhole drilling fluid pressures; and evaluating the ECD contour with at least one of a formation pore pressure or a formation fracture pressure to generate the maximum tripping velocity.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 0.
Claims (15 — 3 Independent, 12 Dependent)
- Claim 1Independent Claim
A method for determining a maximum tripping velocity for tripping a downhole tool string in a wellbore, the method comprising: obtaining contextual data including wellbore data, tool string data, and drilling fluid data; computing downhole drilling fluid pressures at multiple tool string velocities and accelerations using the obtained contextual data and a wellbore hydraulics model; generating an equivalent circulation density (ECD) contour along a two-dimensional acceleration and velocity parameter space from the computed downhole drilling fluid pressures; and evaluating the ECD contour with a formation fracture pressure to generate the maximum tripping velocity, wherein the evaluating the ECD contour further comprises: obtaining the formation fracture pressure; applying a safety buffer to the obtained formation fracture pressure to obtain upper and lower fracture pressures; determining upper and lower fracture pressure contours; determining a maximum tripping in velocity and a minimum tripping in velocity from the upper and lower fracture pressure contours; and tripping the tool string in the wellbore at a velocity based on the determined maximum tripping in velocity.
- Claim 2Depends on #1
The method of claim 1, wherein the wellbore data comprises a wellbore diameter; the tool string data comprises a tool string diameter and a tool string depth; the drilling fluid data includes a drilling fluid viscosity, a drilling fluid density, and a drilling fluid gel strength.
- Claim 3Depends on #1
The method of claim 1, wherein the ECD contour comprises a surge contour and a swab contour.
- Claim 4Depends on #1
The method of claim 1, wherein the two-dimensional acceleration and velocity parameter space comprises a two dimensional parameterized acceleration length and steady state tripping velocity that are based on a trip acceleration profile including an initial acceleration interval, a steady state velocity interval, and a deceleration interval.
- Claim 5Depends on #1
The method of claim 1, wherein the evaluating the ECD contour further comprises generating a maximum tripping acceleration.
- Claim 6Depends on #1
The method of claim 1, wherein the evaluating the ECD contour further comprises: obtaining a formation pore pressure; applying an additional safety buffer to the obtained formation pore pressure to obtain upper and lower pore pressures; determining upper and lower pore pressure contours; and determining a minimum tripping out velocity and a maximum tripping out velocity from the upper and lower pore pressure contours.
- Claim 7Depends on #1
The method of claim 1, further comprising displaying the maximum tripping velocity on a trip advisor board.
- Claim 8Independent Claim
A system for tripping a tool string in a wellbore; the system comprising: a tool string deployed in a wellbore; a processor configured to: receive contextual data including wellbore data, tool string data, and drilling fluid data; compute downhole drilling fluid pressures at multiple tool string velocities and accelerations using the received contextual data and a wellbore hydraulics model; generate an equivalent circulation density (ECD) contour along a two-dimensional acceleration and velocity parameter space from the computed downhole drilling fluid pressures; and evaluate the ECD contour with a formation fracture pressure to generate a maximum velocity for tripping the tool string, wherein the evaluate the ECD contour further comprises: obtain the formation fracture pressure; apply a safety buffer to the obtained formation fracture pressure to obtain upper and lower fracture pressures; determine upper and lower fracture pressure contours; and determine a maximum tripping in velocity and a minimum tripping in velocity from the upper and lower fracture pressure contours; and a trip advisor board display configured to display the maximum tripping velocity; wherein the system trips the tool string in the wellbore at a velocity based on the determined maximum tripping in velocity.
- Claim 9Depends on #8
The system of claim 8, wherein the two-dimensional acceleration and velocity parameter space comprises a two dimensional parameterized acceleration length and steady state tripping velocity that are based on a trip acceleration profile including an initial acceleration interval, a steady state velocity interval, and deceleration interval.
- Claim 10Depends on #8
The system of claim 8, wherein the evaluate the ECD contour further comprises generate a maximum tripping acceleration.
- Claim 11Depends on #8
The system of claim 8, wherein the evaluate the ECD contour further comprises: obtain a formation pore pressure; apply an additional safety buffer to the obtained formation pore pressure to obtain upper and lower pore pressures; determine upper and lower pore pressure contours; and determine a minimum tripping out velocity and a maximum tripping out velocity from the upper and lower pore pressure contours.
- Claim 12Independent Claim
A method for tripping a tool string in a wellbore, the method comprising: obtaining contextual data including wellbore data, tool string data, and drilling fluid data; computing downhole drilling fluid pressures at multiple tool string velocities and accelerations using the obtained contextual data and a wellbore hydraulics model; generating an equivalent circulation density (ECD) contour along a two-dimensional acceleration and velocity parameter space from the computed downhole drilling fluid pressures; evaluating the ECD contour with a formation fracture pressure to generate a maximum tripping velocity and a minimum tripping velocity, wherein the evaluating the ECD contour further comprises: obtaining the formation fracture pressure; applying a safety buffer to the obtained formation fracture pressure to obtain upper and lower fracture pressures; determining upper and lower fracture pressure contours; and determining a maximum tripping in velocity and a minimum tripping in velocity from the upper and lower fracture pressure contours; and tripping the tool string in the wellbore at a velocity between the determined minimum tripping in velocity and the determined maximum tripping in velocity.
- Claim 13Depends on #12
The method of claim 12, wherein the two-dimensional acceleration and velocity parameter space comprises a two dimensional parameterized acceleration length and steady state tripping velocity that are based on a trip acceleration profile including an initial acceleration interval, a steady state velocity interval, and deceleration interval.
- Claim 14Depends on #12
The method of claim 12, wherein: the evaluating the ECD contour further comprises generating a maximum tripping acceleration; and the tripping further comprises tripping the tool string in the wellbore at an acceleration that is less than the maximum tripping acceleration.
- Claim 15Depends on #12
The method of claim 12, wherein the evaluating the ECD contour further comprises: obtaining a formation pore pressure; applying an additional safety buffer to the obtained formation pore pressure to obtain upper and lower pore pressures; determining upper and lower pore pressure contours; and determining a minimum tripping out velocity and a maximum tripping out velocity from the upper and lower pore pressure contours.
Technical Overview & Description
CROSS REFERENCE TO RELATED APPLICATIONS None BACKGROUND Tripping is an essential activity when operating (e.g., drilling) in a wellbore. Tripping (also referred to as tripping pipe) is commonly defined as the act of pulling a tool string (such as a drill string) out of a wellbore and/or running the tool string back into the wellbore. Common reasons for tripping include starting and/or finishing a section of a wellbore, replacing a worn drill bit, and replacing damaged or malfunctioning tools in the string. During a tripping operation, the moving tool string acts like a piston and causes fluid pressure changes in the wellbore. While tripping in, the downward movement of the tool string increases the fluid pressure below the string (referred to in the industry as a surge). While tripping out, the upward movement of the tool string decreases fluid pressure below the string (referred to in the industry as a swab). These surge and swab pressures can negatively affect well integrity if the pressure falls below the pore pressure of the formation or rises above the fracture pressure of the formation. For example, wellbore kicks may be more like to occur while tripping out. Surge and swab effects are generally influenced by multiple variables, including the tripping speed, the geometries of the wellbore and tool string, and various properties of the drilling fluid such as fluid density and fluid viscosity. Surge and swab effects can also be influenced by whether or not the drilling fluid is circulating while tripping. Tripping is commonly performed without drilling fluid circulation, although circulation can sometimes be required. While hydraulic manuals and software can be used to predict surge and swab pressures, there is room for further improvement, for example, to advise safe and timely tripping velocities and accelerations. BRIEF DESCRIPTION OF THE DRAWINGS For a more complete understanding of the disclosed subject matter, and advantages thereof, reference is now made
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (6)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (1)
- Lee et al., Development of a trip time for bit exchange simulator for drilling time estimation, Geothermics 71, 2018, pp. 24-33.