Systems and methods for independent control and operations of tubing and annulus at the wellhead for steam injection
Abstract
A method for utilizing steam for enhanced subterranean production may include operating multiple flow control valves of a wellhead assembly at a wellbore into a configuration so that a flow path is opened, where a first end of the flow path is configured to be coupled to a steam injection system, and where a second end of the flow path is configured to be coupled to the wellbore that extends into a subterranean formation. The method may also include maintaining the configuration of the flow control valves for a time period, where the flow control valves and associated piping are configured to operate under a pressure, a temperature, and a flow rate present with injecting the steam for the time period, and where the flow control valves and associated piping are further configured to operate under a pressure, a temperature, and a flow rate present with producing a production fluid.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 0.
Claims (8 — 1 Independent, 7 Dependent)
- Claim 1Independent Claim
A method for utilizing steam for enhanced subterranean production, the method comprising: operating a plurality of flow control valves of a wellhead assembly at a wellbore into a first configuration so that a first flow path of a plurality of flow paths is opened, wherein the first flow path comprises a first end and a second end, wherein the first end of the first flow path is configured to be coupled to a steam injection system, and wherein the second end of the first flow path is configured to be coupled to the wellbore that extends into a subterranean formation; maintaining the first configuration of the plurality of flow control valves for a first time period, wherein the plurality of flow control valves and associated piping are configured to operate under a steam pressure, a steam temperature, and a steam flow rate present with injecting the steam for the first time period, and wherein the plurality of flow control valves and associated piping are further configured to operate u
- Claim 2Depends on #1
The method of claim 1, wherein the first flow path is through an annulus between a tubing string and production casing.
- Claim 3Depends on #1
The method of claim 1, wherein the first flow path is through a cavity within a tubing string.
- Claim 4Depends on #1
The method of claim 1, wherein the first flow path is through a cavity within a tubing string and through an annulus between the tubing string and production casing.
- Claim 5Depends on #1
The method of claim 1, further comprising: operating, after the second time period, the plurality of flow control valves of the wellhead assembly at the wellbore into the first configuration so that the first flow path is reopened; and maintaining the first configuration of the plurality of flow control valves for a third time period.
- Claim 6Depends on #1
The method of claim 1, wherein the second flow path is through an annulus between a tubing string and production casing.
- Claim 7Depends on #1
The method of claim 1, wherein the second flow path is through a cavity within a tubing string.
- Claim 8Depends on #1
The method of claim 1, wherein the second flow path is through a cavity within a tubing string and through an annulus between the tubing string and production casing.
Technical Overview & Description
TECHNICAL FIELD The present application is related to wellheads and, more particularly, to independent control and operations of the tubing and annulus at the wellhead for steam injection. BACKGROUND In order to inject steam into and/or produce the tubing and/or the annulus between the tubing and casing, significant time and expense must be expended to transition between such operations. When a subterranean resource being produced from a wellbore includes heavy oils, steam is injected down the wellbore to stimulate production. In such cases, steam is injected down the tubing or the annulus, which limits the cross-sectional flow area available for steam injection, which restricts the rate (e.g., in barrels of steam per day) of steam injection. The reduced rate of steam injection results in more time (e.g., in days) for the same amount of heat to be transferred to the reservoir. More days of steam injection proportionately reduces the number of days that the well can be put on production. A delay in production results in lost revenue due to more days for the well to produce the same amount of hydrocarbons. Also, switching between injection through the tubing and injection through the annulus requires switching piping, connections, and special equipment, all of which costs time and money. SUMMARY In general, in one aspect, the disclosure relates to a method for utilizing steam for enhanced subterranean production. The method may include operating a plurality of flow control valves of a wellhead assembly at a wellbore into a first configuration so that a first flow path of a plurality of flow paths is opened, where the first flow path includes a first end and a second end, where the first end of the first flow path is configured to be coupled to a steam injection system, and where the second end of the first flow path is configured to be coupled to the wellbore that extends into a subterranean formation. The method may also include maintaining the first configuration of
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (10)
| Patent | Title | Year | Citations |
|---|