Electric vehicle charger energy management equipment for use with generator back-up
Abstract
Systems and methods are provided for managing Electric Vehicle Supply Equipment (EVSE) for use with a generator back-up. The EVSE can receive electrical power to generate an electrical load while monitoring a frequency of electrical power. The EVSE and/or another system may determine the generator back-up is supplying power based on the frequency. In response to determining the generator back-up is supplying power, the EVSE can operate at percentage of full power. The EVSE may attempt to reconnect and/or increase the percentage of full power in multiple ways based on a mode the EVSE is operating in. In a lock-out disabled priority mode, the EVSE can attempt to reconnect and begin operating at full power. In a lock-out mode, the EVSE can attempt to reconnect at a percentage of full power and incrementally increase the percentage of full power until full power has been reached.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 0.
Claims (8)
- Claim 1Independent Claim
A method of managing an Electric Vehicle (EV) Supply Equipment (EVSE) for use with a generator system, the method comprising: receiving electrical power to operate at full power; monitoring a frequency of electrical power; determining that the generator system is supplying power based on the frequency; in response to determining the generator system is supplying power, shedding a portion of an electrical load of the EVSE to operate at a percentage of full power; determining to increase the percentage of full power based on the frequency; and in response to determining to increase the percentage of full power, increasing the percentage of full power.
- Claim 2Depends on #1
The method of claim 1, wherein the electrical load is used to charge an EV.
- Claim 3Depends on #1
The method of claim 1, wherein determining the generator system is supplying power based on the frequency comprises: determining the frequency is any one of (i) below a minimum threshold frequency for a first period, or (ii) below an extreme threshold frequency for a second period.
- Claim 4Depends on #1
The method of claim 1, wherein determining to increase the percentage of full power based on the frequency comprises: sampling the frequency, wherein sampling the frequency comprises sampling a sample amount; determining all of the samples of the frequency have a magnitude of frequency dither at or below a first frequency dither threshold; and determining a second portion of the samples of the frequency have the magnitude of frequency dither at or below a second frequency dither threshold.
- Claim 5Depends on #1
The method of claim 1, wherein determining the generator system is supplying power based on the frequency comprises: determining a subperiod of a plurality of subperiods is below a minimum threshold amount of zero-crossings; evaluating one or more previous subperiods of the subperiod to determine whether any of the previous subperiods are below an extreme frequency threshold; and evaluating subsequent subperiods of the subperiod to determine whether the subsequent periods are below the minimum threshold.
- Claim 6Depends on #1
The method of claim 1, wherein the portion of the electrical load is the full electrical load, and the percentage of full power is zero percent.
- Claim 7Depends on #1
The method of claim 1, wherein determining to increase the percentage of full power based on the frequency comprises determining the generator system is no longer supplying power based on the frequency.
- Claim 8Independent Claim
A method of managing Electric Vehicle (EV) Supply Equipment (EVSE) power supply from a generator system, the method comprising: receiving electrical power to operate at full power; monitoring a frequency of electrical power; determining that the generator system is supplying power based on the frequency; in response to determining the generator system is supplying power, shedding a portion of an electrical load of the EVSE to operate at a percentage of full power; delaying increasing the percentage of full power for a period; and after the period, increasing the percentage of full power.
Technical Overview & Description
CROSS-REFERENCE TO RELATED APPLICATION(S) This application claims priority to U.S. Application No. 63/501,039, filed on May 9, 2023, entitled ELECTRIC VEHICLE CHARGER ENERGY MANAGEMENT EQUIPMENT FOR USE WITH GENERATOR BACK-UP, the disclosure of which is hereby incorporated by reference in its entirety. BACKGROUND Most residential buildings and commercial buildings utilize electrical power received from a utility company. Ideally, utility companies will provide uninterrupted or infrequently interrupted power to their customers at proper voltage levels and line frequency. However, power outages can occur because the utility cannot meet demand and utility equipment can malfunction or break, because of inclement weather including high wind, rain, snow, ice, fires, and lightning for example. The duration of power outages can vary based on the cause and the severity of the problem, and appliances of buildings may not operate during the power outage. Electrical generators can be used as back-up sources of energy, such as during a power outage from a utility. The electrical generators can operate in a stand-by mode, where electrical power provided by a primary source, such as from a utility, may be monitored. If the power provided by the primary source utility fails, the electrical generator back-up can automatically start operating to generate electrical power. An electrical generator operates using fuel, such as fossil fuel (e.g., natural gas, propane, gasoline, diesel fuel), and the electrical generator can only operate as long as fuel can be supplied to the electrical generator. Additionally, the electrical generator may have a generation capacity less than the power demands the generator is responsible for. Sizing the electrical generator to have a capacity to meet power demands can be prohibitively expensive. Therefore, electrical generators may be managed to allocate the power the electrical generator can generate to supply power to certain devices and not supply pow
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (15)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (2)
- PSP Products, Inc., SAK-60MS, Capture from The Wayback Machine dated Dec. 9, 2022, 2 pages.
- Patent Cooperation Treaty International Searching Authority, PCT International Search Report and Written Opinion for Application No. PCT/US2024/028590 mailed Sep. 10, 2024, 26 pages.