hottub.patents
US 12,608,665 B2#3263608 Most CitedActiveUnited States (USPTO)Utility

Contact center workload forecasts covering varying timeseries granularities and operating horizons

0Forward Citations (#3263608 Global)
0.0/yrCitation Velocity (#3263608 Global)
0.00Citation PageRank (#3263608 Global)
9Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

A method for selecting forecasting models for generating timeseries workload forecasts for a contact center covering varying timeseries granularities and operating horizons. The method includes selecting, via a first selection process, a first select forecasting model from first candidate forecasting models for forecasting a workload level in accordance with a lower-granularity timeseries. The first selection process may include the steps of: receiving a first timeseries dataset; defining different timeseries datasets within the first timeseries dataset, including a first shorterm dataset and first longterm dataset; testing, using the first longterm dataset, each first candidate forecasting model in accordance with a first longterm cross-validation process; testing, using the first shorterm dataset, each first candidate forecasting model in accordance with a first shorterm cross-validation process; and calculating, for each of the first candidate forecasting models, an combined accuracy score based on the testing.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A system for selecting a forecasting model for generating improved timeseries workload forecasts for a contact center covering varying timeseries granularities and operating horizons, the system comprising: a processor; and a memory storing instructions which, when executed by the processor, cause the processor to perform actions including: selecting, via a first selection process, a first select forecasting model from first candidate forecasting models for forecasting a workload level in accordance with a lower-granularity timeseries, wherein the first selection process comprises the steps of: receiving a first timeseries dataset, the first timeseries dataset comprising workload data recorded during a past operating period of the contact center; defining different timeseries datasets within the first timeseries dataset, the different timeseries datasets including at least a first shorterm dataset and a first longterm dataset; testing, via a machine-learning model validation, using the

  2. Claim 2Depends on #1

    The system of claim 1, wherein the memory further stores instructions which, when executed by the processor, cause the processor to perform further actions including: combining the forecasted workload level forecasted by the first select forecasting model and the distribution forecasted by the second select forecasting model to produce the continuous timeseries workload forecasts for the contact center applicable to the varying timeseries granularities.

  3. Claim 3Depends on #1

    The system of claim 1, wherein, in the first selection process, the first candidate forecasting models comprise at least 3 of the following types of forecasting models: an Autoregressive Integrated Moving Average (ARIMA) model; Holt-Winter's statistical model; Theta model; Long Shorterm Memory (LSTM) Network model; Dynamic Harmonic Regression model; Moving Average model; and Multiple Linear Regression model.

  4. Claim 4Depends on #1

    The system of claim 1, wherein, in the second selection process, the second candidate forecasting models comprise at least 3 of the following types of forecasting models: an Average of Distribution model; Median Distribution model; Weighted Weekly Distribution model; Week-N Distribution model; Bootstrap Population Mean and Median Distribution model; and Hybrid/Ensemble Distribution model.

  5. Claim 5Depends on #1

    The system of claim 1, wherein the memory further stores instructions which, when executed by the processor, cause the processor to perform further actions including: providing the forecasted workload level and forecasted distribution for the future operating period as an input to a staffing forecasting model, wherein the staffing forecasting model is configured to convert the input of the forecasted workload level into a corresponding forecasted staffing level; and executing the staffing forecasting model with the provided input to generate a forecasted staffing level for the contact center for the future operating period, the forecasted staffing level being comparable across the same varying timeseries granularities as the input workload forecasts.

  6. Claim 6Depends on #1

    The system of claim 1, wherein the lower-granularity timeseries comprises a repeating period granularity of a week or more; and wherein the higher-granularity timeseries comprises a repeating period granularity of a day or less.

  7. Claim 7Depends on #1

    The system of claim 1, wherein the memory further stores instructions which, when executed by the processor, cause the processor to perform further actions including: receiving update timeseries datasets and updating therewith each of the first and second timeseries datasets, wherein the update timeseries datasets comprises data gathered more recently than the data included each of the first and second timeseries datasets; and repeating the first selection process and the second selection process using the updated first and second timeseries datasets and, thereby, reselecting the first select forecasting model from the first candidate forecasting models and the second select forecasting model from the second candidate forecasting models.

  8. Claim 8Depends on #1

    The system of claim 1, wherein the instructions, when executed by the processor, additionally cause the processor to generate an ensemble model by combining a plurality of the first candidate forecasting models.

Technical Overview & Description

BACKGROUND The present invention generally relates to analytics and forecasting in the field of customer service and customer relations management via contact centers and associated cloud-based systems. More particularly, but not by way of limitation, the present invention pertains to systems and methods for time series forecasting, including model selection and validation, for generating workload forecasts and staffing plans for contact centers. As will be appreciated, timeseries data is a sequence of data points representing observations collected at discrete and equally spaced intervals. Timeseries forecasting models may be used to predict or estimate future data points for time-varying phenomena. Timeseries can be chaotic and complex, particularly in the context of contact center metrics, and development of forecasting in this area remains underutilized. Many conventional timeseries forecasting solutions have been shown to be inadequate for predicting such complex phenomena. Nevertheless, modern compute devices are delivering massive amounts of contact center timeseries data that could yield greater efficiencies and effective resource management. Thus, there is a need for improved forecasting techniques in this area. BRIEF DESCRIPTION OF THE INVENTION The present invention includes a method for selecting forecasting models for generating improved timeseries workload forecasts for a contact center applicable to varying timeseries granularities and operating horizons. The method including selecting, via a first selection process, a first select forecasting model from first candidate forecasting models for forecasting a workload level in accordance with a lower-granularity timeseries. The first selection process may include the steps of: receiving a first timeseries dataset, the first timeseries dataset including workload data recorded during a past operating period of the contact center; defining different timeseries datasets within the first timeseries dataset, t

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (9)

PatentTitleYearCitations

Non-Patent Literature (10)

  • JM Boulin (Call center demand forecasting: improving sales calls prediction accuracy through the combination of statistical methods and judgmental forecast)
  • —
  • 2010
  • —
  • dspace.mit.edu (hereinafter Boulin et al.). (Year: 2010).
  • Ruan, L., Bai, Y., Li, S. et al. Workload time series prediction in storage systems: a deep learning based approach. Cluster Comput (Jan. 13, 2021). https://doi.org/10.1007/s10586-020-03214-y (Year: 2021). (Year: 2021).
  • N Baldon (Time series forecast of call volume in call center using statistical and machine learning methods)
  • —
  • 2019
  • —