hottub.patents
US 12,604,338 B2#3267835 Most CitedActiveUnited States (USPTO)Utility

Handling downlink and uplink collisions in half duplex frequency division duplex user equipment

0Forward Citations (#3267835 Global)
0.0/yrCitation Velocity (#3267835 Global)
0.00Citation PageRank (#3267835 Global)
6Prior Art Cited
8Claims (1 Indep. · 7 Dep.)
0Drawings / Sheets

Abstract

A method performed by user equipment, UE, includes receiving a DL reception and transmitting an UL transmission, wherein there is a collision between the DL reception and the UL transmission. The method also includes prioritizing for processing the DL reception or the UL transmission by applying a particular prioritization rule of a plurality of prioritization rules depending upon a type of the DL reception and/or the UL transmission. The method further includes processing the DL reception or the UL transmission in response to applying the particular prioritization rule.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 0.

Claims (8 — 1 Independent, 7 Dependent)

  1. Claim 1Independent Claim

    A method performed by user equipment (UE) comprising: receiving a downlink (DL) reception and transmitting an uplink (UL) transmission, wherein there is a collision between the DL reception and the UL transmission; prioritizing for processing the DL reception or the UL transmission by applying a particular prioritization rule of a plurality of prioritization rules depending upon a type of the DL reception and/or the UL transmission; processing the DL reception or the UL transmission in response to applying the particular prioritization rule, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing a dynamically scheduled DL reception by the UE in response to the UE being dynamically scheduled with the DL reception and semi-statically configured with a UL transmission occasion which overlap in time; and canceling the UL transmission if the UL transmission occasion starts later than Tproc, 2 after an end of a downlink control information (DCI) schedu

  2. Claim 2Depends on #1

    The method of claim 1, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing an earlier of the DL reception or the UL transmission; and wherein the method further comprises: processing the earlier of the DL reception or the UL transmission until the processing is complete; and processing another DL reception or UL transmission after completing the processing of the earlier of the DL reception or the UL transmission plus a predetermined switching time.

  3. Claim 3Depends on #1

    The method of claim 1, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing the DL reception or the UL transmission which is scheduled later in time in response to the UE being dynamically scheduled with the DL reception and the UL transmission which overlap in time domain, the method further comprising: canceling processing of the DL reception or the UL transmission scheduled earlier in time.

  4. Claim 4Depends on #3

    The method of claim 3, wherein the DCI of the DL reception or the UL transmission which is scheduled later in time comprises an explicit cancellation indication to indicate to the UE to cancel an earlier scheduled one of the UL transmission or the DL reception.

  5. Claim 5Depends on #1

    The method of claim 1, wherein the UE prioritizes processing an earlier of the UL transmission or the DL reception in response to the UL transmission occasion not starting later than Tproc, 2 after the end of the DCI scheduling the DL reception or the UE does not expect to receive the dynamically scheduled DL reception.

  6. Claim 6Depends on #1

    The method of claim 1, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing a dynamically scheduled DL reception in response to the UE being dynamically scheduled with the DL reception and semi-statically configured with a UL transmission occasion which overlap in time, the method further comprising: canceling processing of the UL transmission, if any, in symbols occurring after a number of symbols that is larger than or equal to Tproc, 2 after an end of DCI scheduling the DL reception.

  7. Claim 7Depends on #1

    The method of claim 1, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing by the UE a dynamically scheduled UL transmission in response to the UE being dynamically scheduled with the UL transmission and semi-statically configured with the DL reception occasion which overlap in time, the method further comprising: ignoring or canceling processing of the DL reception occasion if the DL reception starts later than Tproc, 2 after the end of the DCI, otherwise, the UE prioritizes processing an earlier transmission or reception, or alternatively, the UE does not expect to transmit the dynamically scheduled UL transmission.

  8. Claim 8Depends on #1

    The method of claim 1, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing by the UE dynamically scheduled UL transmission in response to the UE being dynamically scheduled with the UL transmission and semi-statically configured with a DL reception occasion which overlap in time, the method further comprising: canceling or ignoring processing of the DL reception occasion in symbols that occur after a number of symbols larger than or equal to Tproc, 2.

Technical Overview & Description

CROSS REFERENCE TO RELATED APPLICATIONS This application is a 35 U.S.C. § 371 national stage application of PCT International Application No. PCT/EP2022/050926 filed on Jan. 17, 2022, which in turn claims domestic priority to U.S. Provisional Patent Application No. 63/138,784, filed on Jan. 18, 2021, the disclosures and content of which are incorporated by reference herein in their entirety. TECHNICAL FIELD The present disclosure relates generally to communications, and more particularly to communication methods and related devices and nodes supporting wireless communications. BACKGROUND Existing user equipment (UE) behavior in handling downlink and uplink (DL/UL) collision for a non-full-duplex UE is to always prioritize the earlier transmission/reception. In some scenarios, this behavior is not desirable, and a new UE behavior is preferred instead. For example, when there is a collision between a dynamically scheduled DL reception and an UL configured grant (CG) occasion, the current UE behavior cannot ensure that the dynamically scheduled DL reception is prioritized. SUMMARY The embodiments described herein provide solutions for different UE behaviors, e.g., half-duplex frequency-division duplex (HD-FDD) UE behaviors, in handling DL/UL collision where the UE does not always prioritize the earlier transmission/reception. Depending on types of UL transmission/DL reception, e.g., dynamically scheduled or semi-statically configured, different prioritization rules can apply. The invention also includes solutions where a timeline for prioritization is considered. The solutions described herein enable the UE to handle a DL/UL collision scenario in HD-FDD operation in a more flexible manner. The UE behavior may differ in different collision scenarios so that the outcome is appropriate, e.g., as intended by a scheduler. Some embodiments provide a method performed by user equipment, UE, for handling downlink (DL) and uplink (UL) collisions. The method includes receiving a

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (6)

PatentTitleYearCitations

Non-Patent Literature (10)

  • International Search Report and Written Opinion of the International Searching Authority, PCT/EP2022/050926, mailed May 16, 2022, 10 pages.
  • Asia Pacific Telecom, Discussion on potential UE complexity reduction features, 3GPP TSG-RAN WG1 Meeting #101, R1-2004536, e-Meeting, May 25-Jun. 5, 2020, 3 pages.
  • Ericsson,
  • “
  • PUR
  • —
  • Remaining open issues,
  • ”
  • 3GPP TSG-RAN WG2 #108, Tdoc R2-1915407, Reno, Nevada, United States, Nov. 18-22, 2019, 7 pages.
  • LG Electronics,