Well fracture systems and methods

0Forward Citations (#3329434 Global)
0.0/yrCitation Velocity (#3329434 Global)
0.00Citation PageRank (#3329434 Global)
4Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

A method for performing simultaneous operations at a wellsite comprising two or more adjacent wellheads, each respectively connected to a well, may include the following steps: providing a fluid supply via upstream equipment to an intermediate supply point; fluidly connecting the intermediate supply point to a single wellhead, the fluidly connecting comprising connecting a first end of a flexible pipe to the intermediate supply point and a second end of the flexible pipe to a first wellhead; performing a wellbore operation on a first well using the fluid supply from the upstream equipment supplied to the first wellhead; disconnecting the second end of the flexible pipe from the first wellhead; and connecting the second end of the flexible pipe to a second wellhead.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A method for performing simultaneous operations at a wellsite comprising two or more adjacent wellheads, each respectively connected to a well, the method comprising: providing a fluid supply via upstream equipment to an intermediate supply point; fluidly connecting the intermediate supply point to a single wellhead, the fluidly connecting comprising connecting a first end of a flexible pipe to the intermediate supply point and a second end of the flexible pipe to a first wellhead; performing a wellbore operation on a first well using the fluid supply from the upstream equipment supplied to the first wellhead; disconnecting the second end of the flexible pipe from the first wellhead; and connecting the second end of the flexible pipe to a second wellhead.

  2. Claim 2Depends on #1

    The method of claim 1, wherein the flexible pipe is capable of retaining a fluid supply having a pressure in the range of 5000 psia to 15000 psia.

  3. Claim 3Depends on #1

    The method of claim 1, further comprising concurrently performing (i) the wellbore operation on the first well and (ii) a wellbore operation on a second of the two or more wells, wherein the fluid supply is incapable of being provided to the second wellhead.

  4. Claim 4Depends on #3

    The method of claim 3, wherein the wellbore operation on the first well comprises a fracturing operation and the fluid supply comprises a fracturing fluid.

  5. Claim 5Depends on #4

    The method of claim 4, wherein the wellbore operation on the second of the two or more wells comprises a wireline operation.

  6. Claim 6Depends on #1

    The method of claim 1, further comprising performing a wellbore operation on the second well using the fluid supply from the upstream equipment supplied to the second wellhead.

  7. Claim 7Depends on #6

    The method of claim 6, further comprising concurrently performing (iii) the wellbore operation on the second well and (iv) a wellbore operation on another of the two or more wells, wherein the fluid supply is incapable of being provided to the another of the two or more wells.

  8. Claim 8Depends on #7

    The method of claim 7, wherein the wellbore operation on the second well comprises a fracturing operation and the fluid supply comprises a fracturing fluid.

Technical Overview & Description

BACKGROUND In a well fracture system, high pressure fluid may be pumped from one or more pump trucks to one or more wellheads, via a pump manifold, a tree manifold, and/or other wellsite equipment. The well site equipment may be connected via rigid pipes, which may present several disadvantages. The rigid pipes may not be connected between pieces of equipment along direct paths, but rather may be connected along redundant, angular paths, as shown in FIGS. 1 - 2 . Swivel joints may be used to connect the rigid pipes in these paths. The redundant, angular paths may be necessary to compensate for misalignment between an inlet of a first piece of equipment and an outlet of a second piece of equipment. For example, the inlet and outlet may be horizontally and/or vertically offset from each other, or may be oriented at different angles. Such misalignment is common in wellsite equipment and will be discussed in more detail below. Redundant, angular connection paths may be required for rigid pipes to connect between a misaligned inlet and outlet. The redundant, angular paths may also be necessary for the rigid pipes to withstand vibration caused by wellsite equipment, especially the pump trucks. Rigid pipes connected along direct paths may be at risk of breaking, especially at their junction points, due to the significant movement caused by the vibrations of the pump trucks. In contrast, the redundant, angular paths may allow the rigid pipes to better withstand the vibrations of the pump trucks. Rigid pipes connected in redundant, angular paths may take up significant space at a wellsite and require significant time and personnel to assemble and disassemble. They may also include numerous points at which leaks or failure are likely because multiple pieces of rigid pipe may be joined together to connect the equipment. Each joint may be a weak point where leaks and/or failure may be more likely. These issues may be exacerbated if small diameter rigid pipes are used because mu

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (4)

PatentTitleYearCitations