An efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system, comprising a cooler, a fan, an absorption tower, a CO 2 -rich solution pump, a plurality of hollow fiber membrane contactors, and a CO 2 -lean solution pump, which are connected one by one to form a queue. The beginning of the queue is connected to a marine diesel engine, and the end of the queue is connected to the absorption power again. The hollow fiber membrane contactors are arranged in parallel. The present invention uses a CO 2 mineralization fixation by seawater as the driving force for the regeneration of CO 2 from the CO 2 -rich solution. This system and method can solve the problems existing in the existing ship CCUS technology with zero CO 2 regeneration energy consumption, and easier and safer CO 2 storage in the ocean.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 0.

Claims (10 — 1 Independent, 9 Dependent)

  1. Claim 1Independent Claim

    An efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system, comprising a cooler, a fan, an absorption tower, a CO 2 -rich solution pump and a plurality of hollow fiber membrane contactors, wherein the cooler, the fan, the absorption tower, the CO 2 -rich solution pump and the plurality of hollow fiber membrane contactors are connected to a marine diesel engine, the plurality of hollow fiber membrane contactors are set in parallel, the plurality of hollow fiber membrane contactors are connected to a CO 2 -lean solution pump, an outlet end of the CO 2 -lean solution pump is connected to an inlet end of the absorption tower, and an outlet end of the absorption tower is connected to an inlet end of the CO 2 -rich solution pump, an outlet end of the CO 2 -rich solution pump is connected to inlet ends of the plurality of hollow fiber membrane contactors, an outlet end of the cooler is connected to an inlet end of the fan, and an outlet end of the fan is connected to the inlet end of the absorption tower; a total CO 2 -rich solution valve is arranged between the CO 2 -rich solution pump and the plurality of hollow fiber membrane contactors, a total CO 2 -lean solution valve is arranged between the plurality of hollow fiber membrane contactors and the CO 2 -lean solution pump, a CO 2 -rich solution flows into tube sides of the plurality of hollow fiber membrane contactors at a same time through the total CO 2 -rich solution valve, and a CO 2 -lean solution from the tube sides flows through the total CO 2 -lean solution valve; each of the plurality of hollow fiber membrane contactors comprises membrane elements and shell heads, wherein the shell heads are arranged at both ends of the membrane elements, and both ends of the membrane elements are open structures; and the membrane elements are immersed in seawater, and the shell heads are arranged above the seawater level.

  2. Claim 2Depends on #1

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system according to claim 1, wherein an inlet is set on a top of the absorption tower, an exhaust port is set on a top side of the absorption tower, and a liquid outlet is set on a bottom of the absorption tower, wherein the liquid outlet is connected to the CO 2 -rich solution pump.

  3. Claim 3Depends on #1

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system according to claim 1, wherein a gas inlet is set on a bottom side of the absorption tower, wherein the gas inlet is connected to the fan.

  4. Claim 4Depends on #1

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system according to claim 1, wherein a membrane material of each of the membrane elements is hydrophobic material, and each of the membrane elements has an inner diameter of 320-350 μ m, an outer diameter of 0.4-2 mm and a wall thickness of 0.02-0.08 mm; and a size of a pore of each of the membranes is 0.02-0.2 μ m, and a porosity is > 40%.

  5. Claim 5Depends on #1

    An efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation method, using the efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system according to claim 1, comprising the following steps: S1: collecting an exhaust gas in an exhaust pipe of the marine diesel engine and cooling the exhaust gas to obtain a cooled exhaust gas; S2: introducing the cooled exhaust gas into the absorption tower, and using an efficient CO 2 absorbent to capture a ship CO 2 in the absorption tower with countercurrent contact, wherein a treated exhaust gas is discharged from a top of the absorption tower, and a solution obtained on a bottom of the absorption tower is the CO 2 -rich solution after CO 2 absorption process; S3: pumping the CO 2 -rich solution into the tube sides of the membrane elements of the plurality of hollow fiber membrane contactors with fixed liquid flow rate, wherein the CO 2 -rich solution flowing through the membrane tubes becomes the CO 2 -lean solution, wherein the CO 2 -lean solution is pumped into the absorption tower through the CO 2 -lean solution pump for secondary absorption; and S4: during a flow process of the CO 2 -rich solution in the tube sides of the membrane elements, allowing the dissolved CO 2 in the CO 2 -rich solution to diffuse into seawater through the membrane elements, wherein regeneration of CO 2 from the CO 2 -rich solution in the tube sides and mineralization of the regenerated CO 2 in the seawater are completed simultaneously.

  6. Claim 6Depends on #5

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation method according to claim 5, wherein a liquid flow rate in step S3 is fixed ranging from 0.2 m/s-0.5 m/s.

  7. Claim 7Depends on #5

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation method according to claim 5, wherein a rate of CO 2 diffusion from the CO 2 -rich solution to the seawater through the membrane elements in step S4 is determined by a CO 2 concentration difference between the CO 2 -rich solution and the seawater, and a driving force of a diffusion process is provided by a process of CO 2 mineralization fixation by the seawater.

  8. Claim 8Depends on #5

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation method according to claim 5, wherein in the efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system, an inlet is set on a top of the absorption tower, an exhaust port is set on a top side of the absorption tower, and a liquid outlet is set on a bottom of the absorption tower, wherein the liquid outlet is connected to the CO 2 -rich solution pump.

  9. Claim 9Depends on #5

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation method according to claim 5, wherein in the efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system, a gas inlet is set on a bottom side of the absorption tower, wherein the gas inlet is connected to the fan.

  10. Claim 10Depends on #5

    The efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation method according to claim 5, wherein in the efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system, a membrane material of each of the membrane elements is hydrophobic material, and each of the membrane elements has an inner diameter of 320-350 μ m, an outer diameter of 0.4-2 mm and a wall thickness of 0.02-0.08 mm; and a size of a pore of each of the membranes is 0.02-0.2 μ m, and a porosity is > 40%.

Technical Overview & Description

CROSS REFERENCE TO THE RELATED APPLICATIONS This application is based upon and claims priority to Chinese Patent Application No. 202210966028.5, filed on Aug. 12, 2022, the entire contents of which are incorporated herein by reference. TECHNICAL FIELD The present invention relates to the field of tail gas treatment technology, in particular to an efficient and low-energy ship CO 2 capture-membrane desorption-mineralization fixation system and method. BACKGROUND Dredging ship is an important engineering ship, which plays an irreplaceable role in port, channel dredging, lake expansion, mud filling and land reclamation, sand blowing and island filling. Different from traditional operating ships, such ships have high installed power and large exhaust gas emissions. With the introduction of international conventions and related planning documents regulating ship greenhouse gas emissions, reducing carbon dioxide (CO 2 ) emissions from ship exhaust gas has become an important factor to be considered when countries develop green dredging ships. At present, most ocean-going ships will continue to use traditional fuels in the short term, in this case, CO 2 capture, utilization and storage (CCUS) technology may become an alternative to ship CO 2 emission reduction. In recent years, countries around the world have carried out extensive research on CCUS technology. This technology has become the main solution for large CO 2 emitters such as electricity, cement and steel on land, which also provides an important reference for the application of CCUS technology on ships. However, at present, in the world, the ship CCUS technology faces the following problems: (1) it is difficult to install and transform the CCUS system on the ship. The ship space is relatively cramped, especially in the ship engine room, there is not much space to install the CCUS system. Taking the mature post-combustion CO 2 capture system using alkanolamine absorbent as an example, its working process includes

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (22)

Non-Patent Literature (1)

  • Li Xiaoming, et al., Experimental study on seawater absorbing CO2 using hollow fiber membrane, Membrane Science and Technology, 2012, pp. 92-96, vol. 32 No. 1.