hottub.patents
US 12,535,807 B2#3333915 Most CitedActiveUnited States (USPTO)Utility

Transmitting, to a distributed control node (DCN), default alarm configuration file(s) determined based on a function block type

0Forward Citations (#3333915 Global)
0.0/yrCitation Velocity (#3333915 Global)
0.00Citation PageRank (#3333915 Global)
27Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

Implementations transmit, to a distributed control node (DCN), default alarm configuration file(s) that are determined based on a particular type of function block. Those implementations transmit the default alarm configuration file(s) to the DCN based on determining that the DCN is executing a function block that is of the particular type and/or is utilizing a function block, that is of the particular type, in alarm monitoring. A default alarm configuration file that is transmitted to a DCN can be stored locally at the DCN to enable viewing and/or editing thereof via human-machine interface (HMI) interfacing with the DCN. Implementations additionally or alternatively relate to reflecting, in an alarms database accessible via a process automation network, local updates that are made via an HMI to a default alarm configuration file locally stored at a DCN.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A method implemented by one or more processors, the method comprising: determining that a distributed control node (DCN), of a process automation system, is executing a function block of a particular type; determining a default alarm configuration file based on the particular type, wherein the default alarm configuration file defines one or more conditions to be monitored in implementing alarm monitoring and includes, for each the one or more conditions, a corresponding default value or no value; responsive to determining that the DCN is executing the function block of the particular type: transmitting, via a network of the process automation system and to the DCN, the default alarm configuration file determined based on the particular type, wherein the default alarm configuration file is locally editable via the DCN and, when edited, is used by the DCN in implementing alarm monitoring based on the function block.

  2. Claim 2Depends on #1

    The method of claim 1, further comprising: subsequent to transmitting, to the DCN, the default alarm configuration file for the particular type: receiving, via the network and from the DCN, an alarm configuration update that includes: a function block identifier of the function block executed by the DCN, and an updated alarm configuration file that is an edited version of the previously transmitted default alarm configuration file; and storing, in an alarms database, the updated alarm configuration file and an association of the updated alarm configuration file with the function block identifier.

  3. Claim 3Depends on #2

    The method of claim 2, further comprising: subsequent to storing, in the alarms database, the updated alarm configuration file and the association of the updated alarm configuration file with the function block identifier: receiving, via the network, an alarm configuration request transmitted by an additional DCN of the process automation system, wherein the alarm configuration request includes: the function block identifier; responsive to receiving the alarm configuration request: retrieving, from the alarms database, the updated alarm configuration file based on the alarm configuration file being stored in association with the function block identifier and the function block identifier being included in the received alarm configuration request; and transmitting, via the network of the process automation system and to the additional DCN, the updated alarm configuration file, wherein transmitting the updated alarm configuration file causes the additional DCN to implement alarm monitori

  4. Claim 4Depends on #3

    The method of claim 3, wherein the additional DCN is a newly commissioned DCN that is a replacement for the DCN in the process automation system.

  5. Claim 5Depends on #3

    The method of claim 3, wherein the additional DCN is a previously commissioned DCN that is executing the function block at a time of the alarm configuration request and wherein the DCN no longer executes the function block at the time of the alarm configuration request.

  6. Claim 6Depends on #1

    The method of claim 1, wherein determining that the DCN is executing the function block of the particular type comprises: receiving, via the network, an alarm configuration request that is transmitted by the DCN and that includes a function block identifier of the function block; and determining, based on the function block identifier included in the alarm configuration request, that the DCN is executing the function block of the particular type.

  7. Claim 7Depends on #6

    The method of claim 6, wherein determining, based on the function block identifier included in the alarm configuration request, that the DCN is executing the function block of the particular type comprises: determining the particular type based on the function block identifier including one or more characters that are mapped to the particular type.

  8. Claim 8Depends on #6

    The method of claim 6, further comprising: responsive to receiving the alarm configuration request: determining whether there is any particular alarm configuration file stored in association with the function block identifier in an alarms database; wherein transmitting the default alarm configuration file to the DCN is further responsive to determining that there is not any particular alarm configuration file stored in association with the function block identifier.

Technical Overview & Description

BACKGROUND Alarms are utilized in process automation systems to detect potential anomalies and to cause action(s) to be performed responsive to detecting a potential anomaly. A potential anomaly can be one with the process automation system and/or one with the process automation process for which the process automation system is deployed. The action(s) for an alarm can include, for example, causing a corresponding notification to be rendered at interface(s) monitored by operator(s) and/or automatically causing remediation(s) to be performed (e.g., an automation process or sub-process automatically halted or throttled). As an example, an alarm can be configured to monitor sensor readings, from a sensor of the process automation system, and to cause a corresponding notification to be rendered if the sensor readings are above a high value (and/or a high-high value) and/or are below a low value (and/or a low-low value). In some process automation systems, hardware and/or software of process automation control nodes, of the process automation system, can all be supplied and/or managed by a single entity (e.g., a single company). This enables the single entity to utilize its own proprietary techniques to create and manage alarms that are associated with corresponding process automation control nodes. However, other process automation systems include heterogeneous hardware and/or heterogeneous software that are supplied and/or managed by a plurality of entities and/or that are deployed in a distributed manner. For example, a process automation system can include some process automation control nodes that are supplied and/or managed by a first entity, other process automation control nodes that are supplied and/or managed by a second entity, etc. Each process automation control node can have different hardware and/or software specifications, including different function block(s) that define control(s) performed by the process automation control node. A process automation co

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (27)

PatentTitleYearCitations

Non-Patent Literature (2)

  • Japanese Patent Office: Notice of Allowance issue for Application No. 2023-222846, 6 pages, dated Feb. 12, 2025.
  • Japanese Patent Office: Notice of Refusal issued for Application No. 2023-222846, 8 pages, dated Dec. 3, 2024.