Patents
US 12,531,817 B2#156026290 Most CitedActiveUnited States (USPTO)Utility

Resource management

0Forward Citations (#156026290 Global)
0.0/yrCitation Velocity (#156026290 Global)
0.00Citation PageRank (#156026290 Global)
24Prior Art Cited
21Claims (3 Indep. · 18 Dep.)
9Drawings / Sheets

Abstract

According to one aspect, a system for resource management may perform receiving a total resource request, a vector of two or more maximum available resources associated with two or more corresponding resource providers, and a number of resource providers and calculating an individual resource request for each of the two or more resource providers by iteratively comparing the vector of two or more maximum available resources with a vector of a current average resource residual, taking a minimum between those vectors as a running tally for the individual resource requests, and recalculating the current average resource residual.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 0.

Claims (21 — 3 Independent, 18 Dependent)

  1. Claim 1Independent Claim

    A system for resource management, comprising: a memory storing one or more instructions; and a processor executing one or more of the instructions stored on the memory to perform: receiving a total resource request, a vector of two or more maximum available resources associated with two or more corresponding resource providers, and a number of resource providers; calculating an individual resource request for each of the two or more resource providers by comparing vectors; and implementing the individual resource request for each of the two or more resource providers to draw the corresponding resources from each of the two or more resource providers.

  2. Claim 2Depends on #1

    The system for resource management of claim 1, wherein the individual resource request for each of the two or more resource providers is set to the corresponding maximum available resources when a sum of the vector of two or more maximum available resources is less than the total resource request.

  3. Claim 3Depends on #1

    The system for resource management of claim 1, wherein the individual resource request for each of the two or more resource providers is equal when possible.

  4. Claim 4Depends on #1

    The system for resource management of claim 1, wherein the current average resource residual is initialized as zero.

  5. Claim 5Depends on #1

    The system for resource management of claim 1, wherein the calculating the individual resource request for each of the two or more resource providers is associated with an iterative threshold.

  6. Claim 6Depends on #5

    The system for resource management of claim 5, wherein the iterative threshold is two iterations or three iterations.

  7. Claim 7Independent Claim

    A system for resource management, comprising: a memory storing one or more instructions; a processor executing one or more of the instructions stored on the memory to perform: receiving a total resource request, a vector of two or more maximum available resources associated with two or more corresponding resource providers, and a number of resource providers; calculating an individual resource request for each of the two or more resource providers by iteratively comparing the vector of two or more maximum available resources with a vector of a current average resource residual, taking a minimum between those vectors as a running tally for the individual resource requests, and recalculating the current average resource residual; and implementing the individual resource request for each of the two or more resource providers to draw the corresponding resources from each of the two or more resource providers.

  8. Claim 8Depends on #7

    The system for resource management of claim 7, wherein the individual resource request for each of the two or more resource providers is set to the corresponding maximum available resources when a sum of the vector of two or more maximum available resources is less than the total resource request.

  9. Claim 9Depends on #7

    The system for resource management of claim 7, wherein the individual resource request for each of the two or more resource providers is equal when possible.

  10. Claim 10Depends on #7

    The system for resource management of claim 7, wherein the current average resource residual is initialized as zero.

  11. Claim 11Depends on #7

    The system for resource management of claim 7, wherein the calculating the individual resource request for each of the two or more resource providers is associated with an iterative threshold.

  12. Claim 12Depends on #11

    The system for resource management of claim 11, wherein the iterative threshold is two iterations or three iterations.

  13. Claim 13Independent Claim

    A system for resource management, comprising: a memory storing one or more instructions; a processor executing one or more of the instructions stored on the memory to perform: receiving a total resource request, a vector of two or more maximum available resources associated with two or more corresponding resource providers, and a number of resource providers; calculating an individual resource request for each of the two or more resource providers based on a classification number; and implementing the individual resource request for each of the two or more resource providers to draw the corresponding resources from each of the two or more resource providers.

  14. Claim 14Depends on #13

    The system for resource management of claim 13, wherein any resource provider having a maximum available resource less than or equal to the classification number is assigned an individual resource request equal to their corresponding maximum available resource.

  15. Claim 15Depends on #13

    The system for resource management of claim 13, wherein remaining resource providers having a maximum available resource greater than the classification number are assigned individual resource requests which evenly split the total resource request minus maximum available resources for the resource providers having the maximum available resource less than or equal to the classification number.

  16. Claim 16Depends on #13

    The system for resource management of claim 13, wherein the individual resource request for each of the two or more resource providers is set to the corresponding maximum available resources when a sum of the vector of two or more maximum available resources is less than the total resource request.

  17. Claim 17Depends on #13

    The system for resource management of claim 13, wherein the individual resource request for each of the two or more resource providers is equal when possible.

  18. Claim 18Depends on #13

    The system for resource management of claim 13, wherein the classification number is calculated by sorting the vector of two or more maximum available resources.

  19. Claim 19Depends on #16

    The system for resource management of claim 16, wherein the classification number is calculated by generating a number of dimension vectors equal to the number of resource providers based on the sorted vector of two or more maximum available resources.

  20. Claim 20Depends on #17

    The system for resource management of claim 17, wherein the classification number is calculated by generating an updated dimension vector based on the number of dimension vectors.

  21. Claim 21Depends on #18

    The system for resource management of claim 18, wherein the updated dimension vector may be a monotonically increasing vector.

Technical Overview & Description

CROSS-REFERENCE TO RELATED APPLICATIONS This application is a continuation application of U.S. Non-provisional patent application Ser. No. 18/188,793 entitled RESOURCE MANAGEMENT filed Mar. 23, 2023 which in itself claims priority to U.S. Non-provisional patent application Ser. No. 18/188,547 entitled RESOURCE MANAGEMENT, filed on Mar. 23, 2023; the entirety of both the above-noted applications are incorporated by reference herein. BACKGROUND Resource allocation may be a problem where distribution of resources may be requested among a set of limited providers. One example may be a “ dinner problem ” which represents a problem as to how to best divide the payment of the bill in a fairest manner among guests with differing abilities to pay. The “ dinner problem ” analogy may be applied to any integer set of resource providers which may have sufficient, adequate, or insufficient means to provide resources. BRIEF DESCRIPTION According to one aspect, a system for resource management may include a memory and a processor. The memory may store one or more instructions. The processor may execute one or more of the instructions stored on the memory to perform one or more acts, one or more actions, one or more steps, etc. For example, the processor may perform receiving a total resource request, a vector of two or more maximum available resources associated with two or more corresponding resource providers, and a number of resource providers and calculating an individual resource request for each of the two or more resource providers based on a classification number. Any resource provider having a maximum available resource less than or equal to the classification number may be assigned an individual resource request equal to their corresponding maximum available resource. The remaining resource providers having a maximum available resource greater than the classification number may be assigned individual resource requests which evenly split the total resource request minus ma

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (24)

PatentTitleYearCitations
US 6,571,215 B1System and method for generating a schedule based on resource assignments2003199
US 9,705,895 B1System and methods for classifying internet devices as hostile or benign201730
US 9,898,315 B1Management of demand for virtual computing resources201814
US 10,031,785 B2Predictive computing resource allocation for distributed environments201812
US 10,812,482 B1Permission vector access control with linear scaling factor202012
US 11,036,537 B1On demand capacity management in provider networks using type-agnostic resources20213
US 2005044202 A1Network system, server, apparatus management method and program—24
US 2006140115 A1Resource allocation management—107
US 2008062437 A1Intelligent text driven document sizing—23
US 2009119237 A1method for solving minimax and linear programming problems—10
US 2009163223 A1Load balancing in mobile environment—201
US 2011218849 A1Cloud platform for multiple account management & automated transaction processing—43
US 2014064200 A1System and method for using resources in a communication system—3
US 2015236724 A1Dynamically Controlling Erasure Code Distribution In An Object Store—15
US 2018026891 A1Predictive time allocation scheduling for computer networks—19
US 2019199611 A1Health status monitoring for services provided by computing devices—24
US 2021019160 A1Quality of service scheduling with workload profiles—6
US 2021042719 A1Portable resource transmittal device with dual message limiter—2
US 2021176174 A1Load balancing device and method for an edge computing network—12
US 2021382757 A1Resource management apparatus and recording medium recording resource management program—3
US 2021406815 A1System and method for a restaurant as a service platform—28
US 2022138786 A1Artificial intelligence (ai) product including improved automated demand learning module—4
US 2023186281 A1Automatic access/restriction of nfts—26
US 2023247143 A1Method and device for evaluating the expertise of participants during a group call—2

Non-Patent Literature (2)

  • Office Action of U.S. Appl. No. 18/188,547 dated Feb. 15, 2024, 22 pages.
  • Notice of Allowance of U.S. Appl. No. 18/188,547 dated May 28, 2024, 7 pages.