System and method for building and deploying a sustainable dynamic reduced-order model (SDROM) for an industrial process
Abstract
Embodiments of the present disclosure provide functionality for creating a sustainable dynamic reduced-order model (SDROM) for operating a real-world industrial process. The model is based upon a reduced order model (ROM) trained using data obtained from simulations performed using a first-principles model (FPM) of the real-world industrial process. The trained ROM is divided into multiple-input, single-output (MISO) sub-models, which are partitioned into component terms for incorporation of respective gain factors. The SDROM is deployed online to operate the real-world industrial process with one or more optimization objectives and the SDROM is periodically calibrated and validated using historical operation data.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 0.
Claims (8)
- Claim 1Independent Claim
A computer-implemented method of creating a model for operating a real-world industrial process, the method comprising: training a reduced order model (ROM) of a subject industrial process using simulation data generated from one or more simulations of the subject industrial process performed using a first-principles model (FPM) of the subject industrial process; constructing a sustainable dynamic reduced-order model (SDROM) of the subject industrial process by: (i) dividing the trained ROM into a plurality of multiple-input single output (MISO) sub-models; (ii) partitioning each MISO sub-model into multiple component terms; and (iii) inserting a gain factor into each partitioned component term to form a gain vector for each MISO sub-model; and deploying the SDROM online to operate the subject industrial process, wherein deploying the SDROM online includes: receiving a stream of real-time data of the subject industrial process; and determining, using the received stream of real-time da
- Claim 2Depends on #1
The method of claim 1 wherein deploying the SDROM online includes: obtaining operation data of the subject industrial process; and periodically calibrating and validating the deployed SDROM using the obtained operation data.
- Claim 3Depends on #2
The method of claim 2 wherein periodically calibrating and validating the deployed SDROM includes: monitoring a given MISO sub-model of the plurality of MISO sub-models by: (i) retrieving historical operation data from a plant history database; (ii) filtering elements of the retrieved historical operation data with a dynamic filter attached to a given input of the given MISO sub-model; (iii) wherein the gain vector formed for the given MISO sub-model is a first gain vector, estimating gain factors of a second gain vector of the given MISO sub-model based on the filtered elements of the retrieved historical operation data; (iv) comparing the estimated gain factors of the second gain vector with inserted gain factors of the first gain vector to determine model performance metrics; and (v) displaying, to users, a visual representation of the determined model performance metrics.
- Claim 4Depends on #2
The method of claim 2 wherein periodically calibrating and validating the constructed SDROM includes: adapting a given MISO sub-model of the plurality of MISO sub-models of the constructed SDROM with historical operation data of the subject industrial process by: receiving allowance to perform adaptations to at least a part of the given MISO sub-model of the constructed SDROM from a user or an auto-system; and updating the given MISO sub-model by calibrating gain factors of the given MISO sub-model.
- Claim 5Depends on #4
The method of claim 4 wherein: updating the given MISO sub-model by calibrating gain factors of the given MISO sub-model includes: retrieving the historical operation data, as a time-series, from a plant history database, for a window of time represented within the plant history database; filtering elements of the retrieved historical operation data with a dynamic filter attached to a given input of the given MISO sub-model; feeding the filtered elements of the retrieved historical operation data as inputs into the given MISO sub-model and predicting an output time-series corresponding to the filtered elements; comparing the predicted output with the retrieved historical operation data of the subject industrial process output in R 2 statistics; adjusting, according to the comparing, and subject to one or more suppression constraints, values of the gain factors for the given input of the given MISO sub-model, thereby calibrating the gain factors of the given MISO sub-model; updating the
- Claim 6Depends on #1
The method of claim 1 wherein deploying the SDROM online further includes: filtering elements of the received stream of real-time data with a dynamic filter attached to a given input of a given MISO sub-model; and predicting an output of the given MISO sub-model and estimating local gains of the given MISO sub-model around an updated operating point determined from the filtered elements of the received stream of real-time data.
- Claim 7Depends on #1
The method of claim 1 wherein deploying the SDROM online includes: determining the optimal operation settings of the subject industrial process using the SDROM and an optimization objective function, the optimal operation settings including at least one of a temperature setpoint, a pressure setpoint, a flow rate setpoint, an operating throughput, and a transition path from a current operating state to the determined optimal operation settings; and operating the subject industrial process in accordance with the determined optimal operation settings.
- Claim 8Depends on #1
The method of claim 1 wherein constructing the SDROM further includes: attaching respective dynamic filters to inputs of each MISO sub-model to align, with respect to time, input data.
Technical Overview & Description
BACKGROUND In process manufacturing industries, advanced process control (APC), real-time optimization (RTO) of plant-wide operations, and plant supply chain planning and scheduling have historically been primary tools for manufacturing concerns, such as refineries and petrochemical plants, to maximize economic margins while operating amid a variable market. In the past three decades, APC has matured and been applied widely. As an example application of APC, model predictive control (MPC) technology has become an industrial standard in process manufacturing industries. For instance, more than 8,000 dynamic matrix control (DMC) implementations of MPC, including implementations of DMCPlus and DMC3, are already in service in process manufacturing facilities across the world. RTO technology, which operates on top of an APC layer, employs complex nonlinear models of an underlying process, thus working together with APC to find optimal conditions and to drive process operation continuously to those optimal conditions, while adapting to environmental changes and adjustments to economic targets. SUMMARY However, in today's industrial practices, several technical challenges remain, rendering sustainable performance of an RTO system difficult to achieve. (1) Such challenges include a reliance of RTO system performance on the accuracy of a process model, which can be a full-scale first-principles model, a reduced-order model, a data-driven linear regression model, a black-box neural network model, or another type of process model. In industrial applications, any such model may degrade with time due to inevitable changes in the underlying subject process, such as equipment modifications, changes in operating strategy, feed rate and quality changes, de-bottlenecking, instrumentation degradation, and the like. Such model degradation results in loss of benefits of an RTO system. To sustain good RTO performance, the model's predictive quality needs to be monitored, and the model ne
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (8)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (10)
- Gibbs, B. P., et al.,
- “
- Application of nonlinear model-based predictive control to fossil power plants
- ”
- , Proceedings of the 30th IEEE Conference on Decision and Control, Dec. 11-13, 1991, pp. 1850-1856.
- International Search Report and Written Opinion received for PCT Patent Application No. PCT/US2023/069321, mailed on Oct. 16, 2023, 14 pages.
- Enns,
- “
- Model Reduction for Control System Design,
- ”