Model test device and method for curtain grouting and excavation of tunnels in high-temperature, water-rich and weak strata
Abstract
This invention discloses a model test device and method for curtain grouting and excavation of tunnels in high-temperature, water-rich and weak strata, comprising weak strata simulation system, working condition simulation system, curtain grouting system, and monitoring and data acquisition system. The weak strata simulation system is the main box used to fill the soft soil. The working condition simulation system includes a high geothermal simulation system, a water pressure simulation system with stepwise loading of water pressure and volume, and a three-dimensional confining pressure simulation system with stepwise controllable loading of confining pressure. The invention can realize the whole test process simulation of grouting reinforcement and excavation of tunnels in weak strata effectively under the action of confining pressure and geothermal heat, and it has a positive reference effect on actual soft stratum tunnel curtain grouting and safe excavation.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 0.
Claims (8 — 1 Independent, 7 Dependent)
- Claim 1Independent Claim
A curtain grouting and excavation model test device for tunnels in high-temperature, water-rich and weak strata, comprising a weak strata simulation system, a curtain grouting system, a working condition simulation system, and a monitoring and data acquisition system, wherein the weak strata simulation system is a main box body used to fill soft soil, a front side of the weak strata simulation system is a slurry entry surface, a back side of the weak strata simulation system is a slurry exit surface, centers of both the slurry entry surface and the slurry exit surface are equipped with an arched excavation chamber, several grouting holes with the shapes of clubs are arranged on the outer edge of the arched excavation chamber on the slurry entry surface, each of the grouting holes connects to a segmented grouting device located in the weak strata simulation system, and each of the segmented grouting device includes a laterally extending grouting pipe, a plurality of grouting hoses corre
- Claim 2Depends on #1
The model test device according to claim 1, wherein the weak strata simulation system consists of a grid frame on the slurry inlet surface, a grid frame on the slurry outlet surface, side steel grid frames, top steel grid frames, connecting steel parts, acrylic boards and a test platform, a number of side steel grid frames is two and are distributed on left and right sides, the grid frame on the slurry inlet surface, the grid frame on the slurry outlet surface, the side steel grid frame and the top steel grid frame are all steel grid frames welded by steel plates along vertical and horizontal directions, a bottom of the steel grid frame connects to the test platform by bolts, wherein a number of the connecting steel parts is two, and are connected to top surfaces of the grid frame on the slurry inlet surface and the grid frame on the slurry outlet surface by the bolts respectively, and a left end and a right end of the connecting steel parts connect to the top surfaces of two side stee
- Claim 3Depends on #2
The model test device according to claim 2, wherein the curtain grouting system includes a high-pressure pumping pipe, a slurry air compressor, a grouting air pressure regulator, a grouting pump and a mixing tank, the high-pressure pumping pipe is connected to the mixing tank, the grouting pump and the grouting holes in the weak strata simulation system sequentially, the slurry air compressor connects to the grouting air pressure regulator.
- Claim 4Depends on #3
The model test device according to claim 3, wherein the high geothermal simulation system includes several stainless-steel heating rods, and an adjustable temperature range of the stainless-steel heating rods is 35-90 ° C., the stainless-steel heating rods are fixed vertically on the inner surface of the side steel grid frame and is embedded in the soft soil.
- Claim 5Depends on #4
The model test device according to claim 4, wherein the three-dimensional confining pressure simulation system includes a hydraulic station and multiple loading units, the loading units are distributed on top, left, right, front and rear of the weak strata simulation system, and each of the loading unit includes hydraulic cylinders and loading plates, the hydraulic cylinder is arranged on a steel grid frame, and the loading plate is buried in the soft soil in the weak strata simulation system, the hydraulic cylinders connect to the hydraulic station through hydraulic pipelines.
- Claim 6Depends on #5
The model test device according to claim 5, wherein the monitoring and data acquisition system includes temperature sensors, grouting flow sensors, dynamic water flow sensors, grouting pressure sensors, dynamic water pressure sensors, strata pressure sensors, displacement sensors, high-definition cameras, paperless recorders, and a data analyzer, the temperature sensors are buried inside the weak strata simulation system, the grouting flow sensor connects to the curtain grouting system, the grouting pressure sensor is placed before the grouting flow sensor, the dynamic water flow sensor connects to a water pressure simulation system, the dynamic water pressure sensor is placed before the dynamic water flow sensor, the strata pressure sensors and displacement sensors are embedded in the weak strata simulation system filled up with soft soil, a total of two paperless recorders are located in the curtain grouting system parallel connecting to the grouting flow sensors, the grouting pressu
- Claim 7Depends on #6
The model test device according to claim 6, wherein the connecting steel parts are formed by two vertically welding steel plates, and a fixed connecting piece with a plurality of triangular ribs arranged along the length direction evenly.
- Claim 8Depends on #5
The model test device according to claim 5, wherein the connecting steel parts are formed by two vertically welding steel plates, and a fixed connecting piece with a plurality of triangular ribs arranged along the length direction evenly.
Technical Overview & Description
CROSS-REFERENCE TO RELATED APPLICATION This application claims the priority benefit of China application serial no. 202210407400.9, filed on Apr. 19, 2022. The entirety of the above-mentioned patent application is hereby incorporated by reference herein and made a part of this specification. TECHNICAL FIELD This invention refers to the field of geological disaster prevention and control in tunnel and underground engineering. Specifically, it is a model test device and method for curtain grouting and excavation of tunnels s in high-temperature, water-rich and weak strata. BACKGROUND China has made remarkable achievements in tunnel construction. During the “ 13th Five-Year Plan ” period, the newly operated subway tunnel mileage has reached 3,622.8 km in China, the increase degree is approximately 184% compared with the “ 12th Five-Year Plan ” period. In addition, a large number of projects in hydraulic tunnels, comprehensive underground pipelines, and underground chambers have also been constructed and put into operation. However, the following issues need to be solved urgently: 1. In China, the Plan of “ Layout Plan for the Main Line of the Yangtze River Crossing Channel (2020-2035) ” has been released in 2020, it pointed out there are current problems such as relatively small amounts of channel crossing Yangtze River, overburden of some channels, etc. By 2025, about 180 channels crossing Yangtze River will be built. By 2035, about 240 channels crossing Yangtze River will be built. In addition, the principles of “ less bridges and more tunnels ” and “ tunnels are more suitable ” should be adhered especially for key river sections such as the lower reaches of the Yangtze River. Therefore, it is urgent to enrich the tunnel excavation and construction theories in water-rich and weak strata so that the clear regulations are formulated to guide the construction of large-scale cross-sea, cross-river and wading or water-rich tunnels. 2. With the increase of tunnel construct
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (6)
| Patent | Title | Year | Citations |
|---|