Abstract

A method for automatic panel design and fabrication includes receiving a two-dimensional or three-dimensional architectural plan for a building, converting the architectural plan into a first data file that contains information about a location, length, and style of each wall included in the architectural plan, obtaining, from the first data file, a list of walls to automatically generate a second data file that contains a list of panels to be constructed for each of the list of walls, and generating a set of commands for each of panels in the list and transmitting the set of commands to a robotic builder, to allow the robotic builder to automatically build each of the panels in the list.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 0.

Claims (8 — 1 Independent, 7 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method, comprising: receiving a two-dimensional architectural plan for a building structure; converting the two-dimensional architectural plan into a first data file that contains information about a location, length, and style of each wall included in the architectural plan; obtaining, from the first data file, a list of walls to automatically generate a second data file that contains a list of panels to be constructed from the list of walls; generating, with a build manager, a set of commands to build a panel from the list of panels using a robotic builder having robotic machines configured to build the panel: selecting one or more robotic machines to build the panel based at least on panel cost; outputting the set of commands to the one or more robotic machines, the set of commands containing instructions for the one or more robotic machines to build the panel; and building with the one or more robotic machines the panel based on the set of commands.

  2. Claim 2Depends on #1

    The computer-implemented method of claim 1, wherein, when generating the list of panels to be constructed for each of the list of walls, the method further comprises: integrating features for assisting with later steps in a structure-building process of the building into the list of panels.

  3. Claim 3Depends on #1

    The computer-implemented method of claim 1, wherein the second data file further includes information for manufacturing each of the list of panels, including a location and a type of lumber used for manufacturing each of the list of panels, and one or more fasteners for connecting the lumber together.

  4. Claim 4Depends on #1

    The computer-implemented method of claim 1, further comprising: generating a panel book showing an overview of the building structure and every panel from the list of panels to be constructed.

  5. Claim 5Depends on #1

    The computer-implemented method of claim 1, wherein the one or more robotic machines are equipped with one or more end effectors to mount and/or connect tools for panel fabrication.

  6. Claim 6Depends on #1

    The computer-implemented method of claim 1, wherein the list of panels is determined by: discretizing each wall into chunks of length; and looping from a beginning point of the wall to an ending point of the wall, and calculating a cost of a set of panel splits ending at each point to identify an optimal set of panels based on the cost.

  7. Claim 7Depends on #6

    The computer-implemented method of claim 6, wherein the list of panels is determined based on a dynamic programming (DP).

  8. Claim 8Depends on #7

    The computer-implemented method of claim 7, wherein the building is based on building logic and the building logic is independent from the DP algorithm so that the DP algorithm is capable of being changed or switched out without a change to the building logic.

Technical Overview & Description

CROSS-REFERENCE TO RELATED APPLICATIONS This application is a continuation of U.S. application Ser. No. 18/642,446, filed Apr. 22, 2024, which claims the benefit of and priority to U.S. Provisional Patent Application No. 63/497,375 entitled “ Intelligent Building Structure Planner, ” filed on Apr. 20, 2023, the content of which is incorporated by reference herein in its entirety. TECHNICAL FIELD This disclosure generally relates to the construction of building structures, and more particularly to systems and methods for automating the process of preparing building components in off-site construction from a design plan. BACKGROUND Wall panels are a staple in off-site construction. Companies are able to build wall panels in warehouses with a mix of large automation systems and employees, and ship these prefabricated panels to construction sites and craned into place on a foundation that has been constructed in advance. However, before any building can occur, the house must be turned into a series of panels, that is, each wall must be broken into sections that can be individually built and shipped in stacks. This process is referred to as panelization. Currently, all panelization is done by hand or with limited software tools. To panelize one house, experienced designers work for one to four weeks depending on the experience of the designers, the complexity of the house, and other factors. This process takes a long time and is tedious and prone to errors. Current software options employed by designers for designing panels do not do most of the work. Instead, existing software solutions mostly act as accounting, helping designers visualize the walls as the designers make decisions about where to split the wall into panels. In addition, when using these panelization software products, the designers first have to create a detailed digital clone of the building that is being constructed. This process, however, is very manual, and labor intensive, and requires extensive kno

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (5)

PatentTitleYearCitations

Non-Patent Literature (10)

  • Altaf, M. S., Liu, H., Al-Hussein, M.,
  • &
  • Yu, H. (Dec. 2015). Online simulation modeling of prefabricated wall panel production using RFID system. In 2015 Winter Simulation Conference (WSC) (pp. 3379-3390). IEEE. (Year: 2015).
  • Liu, H., Holmwood, B., Sydora, C., Singh, G.,
  • &
  • Al-Hussein, M. (Jul. 2017). Optimizing multi-wall panel configuration for panelized construction using BIM. In Proceedings of the 2017 International Structural Engineering
  • &
  • Construction Conference (ISEC), Valencia, Spain (pp. 24-29). (Year: 2017).
  • Altaf 2018 (Altaf, M. S., Bouferguene, A., Liu, H., Al-Hussein, M.,
  • &