Utilization of a resource to perform a task based on a predicted capacity of the resource
Abstract
The technologies described herein are generally directed to allocating a resource to perform a task based on a predicted capacity of the resource. For example, a method described herein can include identifying a selected capacity associated with completion of tasks of a particular task type. Further, the method can include, evaluating a result of work by a worker resource performing a task of the particular task type. The method can further include, based on the result, predicting that the worker resource has the selected capacity and, based on this prediction, assign the worker resource to perform another task of the particular task type.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 0.
Claims (20 — 3 Independent, 17 Dependent)
- Claim 1Independent Claim
A method, comprising: identifying, by a system comprising a processor, a first capacity associated with completion of first tasks of a first task type; identifying, by the system, collected production data representing a result of a workflow executed by a first worker resource of a plurality of worker resources having a plurality of tasks of a plurality of task types, wherein each of the plurality of tasks are associated with different capability and capacity; generating a first training data set from the collected production data, wherein the first training data set comprises a first pseudorandom selection of the collected production data; training, by the system, using the first capacity associated with completion of first tasks of a first task type and the first training data set, an artificial neural network (ANN) to predict resource capacities of the plurality of worker resources; receiving, by the system, from the ANN, a prediction that the first worker resource has the first capacity; generating a second training data set from the collected production data, wherein the second training data set comprises a second pseudorandom selection of the collected production data; and providing subsequent training of the ANN using the second training data set.
- Claim 2Depends on #1
The method of claim 1, wherein ANN predicts the first capacity of the first worker resource based on the result being determined to be above a threshold level of success.
- Claim 3Depends on #2
The method of claim 2, wherein the result being above the threshold level of success is associated with the first capacity being predicted for the first worker resource.
- Claim 4Depends on #1
The method of claim 1, further comprising: identifying, by the system, a second capacity associated with completion of the first tasks of the first task type; based on the result, evaluating, by the system, the second capacity of the first worker resource as being below a threshold level of capacity; and based on the first worker resource being evaluated to be below the threshold level, facilitating, by the system, assigning a resource to increase the second capacity of the first worker resource.
- Claim 5Depends on #4
The method of claim 4, wherein the resource to increase the second capacity comprises a training resource for the second capacity.
- Claim 6Depends on #4
The method of claim 4, further comprising: identifying, by the system, a second task of the first task type assigned to a second worker resource; based on analyzing historical task information associated with the second worker resource, evaluating, by the system, the first capacity of the second worker resource as being below the threshold level of capacity; and based on the first capacity of the second worker resource being evaluated to be below the threshold level, allocating, by the system, the first worker resource to augment the first capacity of the second worker resource.
- Claim 7Depends on #1
The method of claim 1, wherein the result comprises a performance metric for performance of the first task by the first worker resource.
- Claim 8Depends on #7
The method of claim 7, wherein the performance metric comprises a completion time for completion of the first task.
- Claim 9Depends on #7
The method of claim 7, wherein the performance metric comprises biometric data of the first worker resource.
- Claim 10Depends on #1
The method of claim 1, wherein a task workflow comprises the first task and a second task of second tasks of a second task type, wherein the second task type is associated with a second capacity associated with completion of the second tasks of the second task type, and wherein the method further comprises: based on the first worker resource being assigned to work on tasks of the task workflow, identifying, by the system, a second worker resource that has the second capacity; and assigning, by the system, the second worker resource to work on the tasks of the task workflow.
- Claim 11Depends on #10
The method of claim 10, further comprising, assigning, by the system, the second worker resource to augment the second capacity of the first worker resource during the work on the tasks of the task workflow.
- Claim 12Depends on #1
The method of claim 1, further comprising: identifying, by the system, a second task type as having a similarity to the first task type according to a threshold level of similarity; and based on the similarity, identifying, by the system, the first capacity as being associated with completion of second tasks of the second task type.
- Claim 13Depends on #1
The method of claim 1, further comprising, based on evaluated activity of the first worker resource, revising, by the system, the prediction of the first capacity for the first worker resource.
- Claim 14Depends on #13
The method of claim 13, wherein the evaluated activity comprises evaluated past activity implicating the first capacity.
- Claim 15Depends on #1
The method of claim 1, further comprising, based on evaluating performance of the first tasks of the first task type over a period of time, modifying, by the system, a characteristic of the first capacity.
- Claim 16Independent Claim
A system, comprising: a processor; and a memory that stores executable instructions that, when executed by the processor, facilitate performance of operations, comprising: identifying a first capacity associated with completion of first tasks of a first task type; identifying collected production data representing a result of a workflow executed by a first worker resource of a plurality of worker resources having a plurality of tasks of a plurality of task types, wherein each of the plurality of tasks are associated with different capability and capacity; generating a first training data set from the collected production data, wherein the first training data set comprises a first pseudorandom selection of the collected production data; training an artificial neural network (ANN) within resource management equipment, using the first training data set; communicating, to the resource management equipment, a request to perform a task associated with a first capability, receiving a confirmation comprising a message that a worker resource has been allocated to perform the task by the ANN, wherein the worker resource was selected based on an assessment that the worker resource has the first capability as predicted by the ANN; generating a second training data set from the collected production data, wherein the second training data set comprises a second pseudorandom selection of the collected production data; and providing subsequent training of the ANN using the second training data set.
- Claim 17Depends on #16
The system of claim 16, wherein the operations further comprise: based on an analysis of a characteristic of the task, determining that the task has a further association with a second capability; based on determining the further association with the second capability, updating the ANN within the resource management equipment regarding capabilities associated with the task; and receiving an indication from the resource management equipment that, based on a reassessment of the first worker resource, the first worker resource has the second capability as predicted by the ANN.
- Claim 18Independent Claim
A non-transitory machine-readable medium comprising executable instructions that, when executed by a processor of a skill management device, facilitate performance of operations, the operations comprising: identifying a first capacity associated with completion of first tasks of a first task type; identifying collected production data representing a result of a workflow executed by a first worker resource of a plurality of worker resources having a plurality of tasks of a plurality of task types, wherein each of the plurality of tasks are associated with different capability and capacity; generating a first training data set from the collected production data, wherein the first training data set comprises a first pseudorandom selection of the collected production data; training an artificial neural network (ANN) within resource management equipment, using the first training data set; determining that a skill is implicated by an activity performed to complete a job; based on a review of historical records of a resource, identifying past performance of the activity by the resource; providing the skill and the past performance to the ANN within the resource management equipment; receiving, from the ANN within the resource management equipment, a conditional attribution of the skill to the resource; generating a second training data set from the collected production data, wherein the second training data set comprises a second pseudorandom selection of the collected production data; and providing subsequent training of the ANN using the second training data set.
- Claim 19Depends on #18
The non-transitory machine-readable medium of claim 18, wherein the operations further comprise: evaluating a degree to which the resource utilizes the skill compared to a threshold level of competence; and based on the degree of utilization being determined to be above the threshold level of competence, confirming the conditional attribution of the skill to the resource.
- Claim 20Depends on #18
The non-transitory machine-readable medium of claim 18, wherein the resource comprises a human resource.
Technical Overview & Description
TECHNICAL FIELD The subject application is related to different approaches to managing resources for the performance of tasks and, for example, to managing resource capacity for handling tasks. BACKGROUND As resources that can be used for performance of organizational tasks continue to increase in complexity, managing the capacity of different resources to perform different tasks has become increasingly difficult. Problems can occur when worker resources of different capabilities are required to complete complex tasks. These problems can be aggravated by the evolving character of some capabilities and tasks, e.g., as tasks evolve to handle more complex technologies, the evolution in capabilities required to perform tasks is often not managed. BRIEF DESCRIPTION OF THE DRAWINGS The technology described herein is illustrated by way of example and not limited in the accompanying figures in which like reference numerals indicate similar elements and in which: FIG. 1 is an architecture diagram of an example system that can facilitate allocating a resource to perform a task based on a predicted capacity of the resource, in accordance with one or more embodiments. FIG. 2 is a diagram of a non-limiting example system that can facilitate allocating a resource to perform a task based on a predicted capacity of the resource, in accordance with one or more embodiments. FIG. 3 is a diagram of a non-limiting example system that can facilitate allocating a resource to perform a task based on a predicted capacity of the resource, in accordance with one or more embodiments. FIG. 4 depicts a flowchart of an example process that can facilitate allocating a resource to perform a task based on a predicted capacity of the resource, in accordance with one or more embodiments. FIG. 5 illustrates an implementation of an example, non-limiting system that can use one or more machine learning approaches to facilitate prediction and discovery of resource capacities for worker resources performin
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (18)
| Patent | Title | Year | Citations |
|---|---|---|---|
| KR 20200134526 A | Razor Blade and Manufacturing Method Thereof | — | 0 |
Non-Patent Literature (10)
- Sato,
- “
- Reselling Gig Work is Tiktok's Newest Side Hustle,
- ”
- The Verge, https://www.theverge.com/22905356/gig-work-drop-shipping-fiverr-tiktok, Feb. 9, 2022, 9 pages.
- Okano et al.,
- “
- Sleep quality, duration, and consistency are associated with better academic performance in college students,
- ”
- npj Sci. Learn. 4, 16 (2019), 5 pages.