hottub.patents
US 12,450,097 B2#3414513 Most CitedActiveUnited States (USPTO)Utility

User adjustable communication fabric coupled compute units

0Forward Citations (#3414513 Global)
0.0/yrCitation Velocity (#3414513 Global)
0.00Citation PageRank (#3414513 Global)
75Prior Art Cited
21Claims (6 Indep. · 15 Dep.)
14Drawings / Sheets

Abstract

Communication fabric-coupled computing architectures, platforms, and systems are provided herein. In one example, an apparatus includes a management entity configured to establish a compute unit comprising components from among a plurality of physical computing components by at least instructing a communication fabric communicatively coupling the plurality of physical computing components to establish logical isolation within the communication fabric to form the compute unit. Responsive to an indication of a change in workload associated with at least a software component deployed to a processing element of the compute unit, the management entity is configured to adjust the logical isolation to alter a quantity of the plurality of physical computing components in the compute unit in accordance with the change in the workload.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 75 · Forward citations: 0.

Claims (21 — 6 Independent, 15 Dependent)

  1. Claim 1Independent Claim

    An apparatus, comprising: a user interface configured to receive instructions to establish a compute unit comprising components from among a plurality of physical computing components for implementation by a management entity that that instructs a communication fabric communicatively coupling the plurality of physical computing components and establishes logical isolation within the communication fabric to form the compute unit, wherein the management entity deploys a software component to the compute unit for use by least an associated processor of the compute unit after formation; the user interface configured to present telemetry information related to the operation of the compute unit comprising one or more status views; and wherein the software component is configured to provide at least a portion of the telemetry information related to operation of the compute unit.

  2. Claim 2Depends on #1

    The apparatus of claim 1, wherein the compute unit comprises physical computing components selected from among central processing units (CPUs) and graphics processing units (GPUs).

  3. Claim 3Depends on #1

    The apparatus of claim 1, wherein the compute unit comprises physical computing components further selected from among data storage modules, memory devices, and network interface modules.

  4. Claim 4Depends on #1

    The apparatus of claim 1, wherein the communication fabric comprises a Peripheral Component Interconnect Express (PCIe) communication fabric comprising one or more PCIe switch circuits, and wherein the logical isolation is formed in the communication fabric with segregation established using segregation among ports of the one or more PCIe switch circuits.

  5. Claim 5Depends on #1

    The apparatus of claim 1, wherein, responsive to a predictive allocation, the management entity is configured to alter composition of physical computing components within the compute unit by at least changing the logical isolation within the communication fabric for the compute unit.

  6. Claim 6Depends on #5

    The apparatus of claim 5, wherein altering the composition comprises adding or removing a physical computing component from the compute unit.

  7. Claim 7Depends on #1

    The apparatus of claim 1, wherein responsive to an indication of a change in workload associated with at least the software component, the management entity is configured to adjust the logical isolation to alter a quantity of the plurality of physical computing components in the compute unit in accordance with the change in the workload.

  8. Claim 8Depends on #7

    The apparatus of claim 7, wherein increasing the quantity of the plurality of physical computing components in the compute unit comprises adding at least one additional physical computing component into the compute unit; and wherein decreasing the quantity of the plurality of physical computing components in the compute unit comprises removing at least one existing physical computing component out of the compute unit and placing the at least one existing physical computing component into a pool of free physical computing components for use by another compute unit.

  9. Claim 9Depends on #1

    The apparatus of claim 1, wherein the software component comprises an operating system.

  10. Claim 10Depends on #1

    The apparatus of claim 1, wherein the software component comprises a driver function configured to emulate operation of an Ethernet interface to an operating system of the associated processor, and wherein the driver function is further configured to transfer communications received by the Ethernet interface over the communication fabric.

  11. Claim 11Independent Claim

    A method, comprising: in a user interface, receiving instructions to establish a compute unit comprising components from among a plurality of physical computing components for implementation by a management entity that that instructs a communication fabric communicatively coupling the plurality of physical computing components and establishes logical isolation within the communication fabric to form the compute unit, wherein the management entity deploys a software component to the compute unit for use by least an associated processor of the compute unit after formation; in the user interface, presenting telemetry information related to the operation of the compute unit comprising one or more status views; and wherein the software component is configured to provide at least a portion of the telemetry information related to operation of the compute unit.

  12. Claim 12Depends on #11

    The method of claim 11, wherein the compute unit comprises physical computing components selected from among central processing units (CPUs) and graphics processing units (GPUs).

  13. Claim 13Depends on #11

    The method of claim 11, wherein the communication fabric comprises a Peripheral Component Interconnect Express (PCIe) communication fabric comprising one or more PCIe switch circuits, and wherein the logical isolation is formed in the communication fabric with segregation established using segregation among ports of the one or more PCIe switch circuits.

  14. Claim 14Depends on #11

    The method of claim 11, wherein, responsive to a predictive allocation, the management entity is configured to alter composition of physical computing components within the compute unit by at least changing the logical isolation within the communication fabric for the compute unit; and wherein altering the composition comprises adding or removing a physical computing component from the compute unit.

  15. Claim 15Depends on #11

    The method of claim 11, wherein responsive to an indication of a change in workload associated with at least the software component, the management entity is configured to adjust the logical isolation to alter a quantity of the plurality of physical computing components in the compute unit in accordance with the change in the workload; wherein increasing the quantity of the plurality of physical computing components in the compute unit comprises adding at least one additional physical computing component into the compute unit; and wherein decreasing the quantity of the plurality of physical computing components in the compute unit comprises removing at least one existing physical computing component out of the compute unit and placing the at least one existing physical computing component into a pool of free physical computing components for use by another compute unit.

  16. Claim 16Depends on #11

    The method of claim 11, wherein the software component comprises an operating system.

  17. Claim 17Depends on #11

    The method of claim 11, wherein the software component comprises a driver function configured to emulate operation of an Ethernet interface to an operating system of the associated processor, and wherein the driver function is further configured to transfer communications received by the Ethernet interface over the communication fabric.

  18. Claim 18Independent Claim

    A computing apparatus comprising: one or more non-transitory computer readable storage media; and program instructions stored on the one or more non-transitory computer readable storage media, that when executed by a processing system, direct the processing system to at least: a user interface configured to receive instructions to establish a compute unit comprising components from among a plurality of physical computing components for implementation by a management entity that that instructs a communication fabric communicatively coupling the plurality of physical computing components and establishes logical isolation within the communication fabric to form the compute unit, wherein the management entity deploys a software component to the compute unit for use by least an associated processor of the compute unit after formation; the user interface configured to present telemetry information related to the operation of the compute unit comprising one or more status views; and wherein the software component is configured to provide at least a portion of the telemetry information related to operation of the compute unit.

  19. Claim 19Independent Claim

    An apparatus, comprising: a user interface configured to receive instructions to establish a compute unit comprising components from among a plurality of physical computing components for implementation by a management entity that that instructs a communication fabric communicatively coupling the plurality of physical computing components and establishes logical isolation within the communication fabric to form the compute unit; wherein the management entity deploys a software component to the compute unit for use by least an associated processor of the compute unit after formation; and wherein responsive to an indication of a change in workload associated with at least the software component, the management entity is configured to adjust the logical isolation to alter a quantity of the plurality of physical computing components in the compute unit in accordance with the change in the workload.

  20. Claim 20Independent Claim

    A method, comprising: in a user interface, receiving instructions to establish a compute unit comprising components from among a plurality of physical computing components for implementation by a management entity that that instructs a communication fabric communicatively coupling the plurality of physical computing components and establishes logical isolation within the communication fabric to form the compute unit; wherein the management entity deploys a software component to the compute unit for use by least an associated processor of the compute unit after formation; and wherein responsive to an indication of a change in workload associated with at least the software component, the management entity is configured to adjust the logical isolation to alter a quantity of the plurality of physical computing components in the compute unit in accordance with the change in the workload.

  21. Claim 21Independent Claim

    A computing apparatus comprising: one or more non-transitory computer readable storage media; and program instructions stored on the one or more non-transitory computer readable storage media, that when executed by a processing system, direct the processing system to at least: a user interface configured to receive instructions to establish a compute unit comprising components from among a plurality of physical computing components for implementation by a management entity that that instructs a communication fabric communicatively coupling the plurality of physical computing components and establishes logical isolation within the communication fabric to form the compute unit; wherein the management entity deploys a software component to the compute unit for use by least an associated processor of the compute unit after formation; and wherein responsive to an indication of a change in workload associated with at least the software component, the management entity is configured to adjust the logical isolation to alter a quantity of the plurality of physical computing components in the compute unit in accordance with the change in the workload.

Technical Overview & Description

RELATED APPLICATIONS This application is a continuation of, and claims priority to, U.S. patent application Ser. No. 17/233,711, entitled “ COMMUNICATION FABRIC COUPLED ADJUSTABLE COMPUTE UNITS, ” filed Apr. 19, 2021; and to U.S. patent application Ser. No. 16/819,646, entitled “ COMMUNICATION FABRIC COUPLED COMPUTE UNITS, ” filed Mar. 16, 2020; and to U.S. patent application Ser. No. 15/675,377, entitled “ DISAGGREGATED FABRIC-SWITCHED COMPUTING PLATFORM, ” filed Aug. 11, 2017 (issued as U.S. Pat. No. 10,595,291 on Mar. 17, 2020). This application hereby claims the benefit of and priority to U.S. Provisional Patent Application 62/374,573, entitled “ DISAGGREGATED MODULAR COMPUTING PLATFORM, ” filed Aug. 12, 2016, and also claims the benefit of and priority to U.S. Provisional Patent Application 62/468,231, entitled “ FABRIC-SWITCHED GRAPHICS PROCESSING UNIT (GPU) PLATFORM, ” filed Mar. 7, 2017, both of which are hereby incorporated by reference in their entirety. BACKGROUND Computer systems typically include bulk storage systems, such as magnetic disk drives, optical storage devices, tape drives, or solid state storage drives, among other storage systems. As storage needs have increased in these computer systems, networked storage systems have been introduced which store large amounts of data in a storage environment physically separate from end user computer devices. These networked storage systems typically provide access to bulk data storage over one or more network interfaces to end users or other external systems. In addition to storage of data, remote computing systems include various processing systems that can provide remote computing resources to end users. These networked storage systems and remote computing systems can be included in high-density installations, such as rack-mounted environments. However, as the densities of networked storage systems and remote computing systems increase, various physical limitations can be reached. These limitations incl

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (75)

PatentTitleYearCitations
US 6,061,750 AFailover system for a DASD storage controller reconfiguring a first processor, a bridge, a second host adaptor, and a second device adaptor upon a second processor failure2000194
US 6,325,636 B1Passive midplane for coupling web server processing cards with a network interface(s)2001251
US 6,828,207 B2Method of Fabricating a capacitor structure having hemispherical grains20043
US 7,243,145 B1Generation of computer resource utilization data per computer application2007125
US 7,260,487 B2Histogram difference method and system for power/performance measurement and management200779
US 7,340,578 B1Method and apparatus for maintaining an accurate inventory of storage capacity in a clustered data processing system200854
US 7,505,889 B2Transcoding media system200994
US 7,606,960 B2Apparatus for adjusting a clock frequency of a variable speed bus200979
US 7,725,757 B2Method and system for fast frequency switch for a power throttle in an integrated device201074
US 7,877,542 B2High integration of intelligent non-volatile memory device201171
US 8,125,919 B1Method and system for selectively releasing network resources201268
US 8,150,800 B2Advanced clock synchronization technique201263
US 8,656,117 B1Read completion data management201445
US 8,688,926 B2Systems and methods for optimizing data storage among a plurality of solid state memory subsystems201438
US 8,880,771 B2Method and apparatus for securing and segregating host to host messaging on PCIe fabric201422
US 9,602,437 B1System and method for accelerating network applications using an enhanced network interface and massively parallel distributed processing201747
US 10,382,279 B2Dynamically composed compute nodes comprising disaggregated components20197
US 10,536,349 B1Configuration system and method for an integrated computing system20202
KR 20020059428 ANon-aqueous electrolyte secondary cell and negative electrode therefor—0
KR 20070067432 AControl panel assembly for laundry device—2
KR 20080034153 AMethods and devices for interworking of wireless wide area networks and wireless local area networks or wireless personal area networks—0
KR 20090006837 USun Visor—0

Non-Patent Literature (10)

  • Aragon, Juan L. et al.,
  • “
  • Control Speculation For Energy-Efficient Next-Generation Superscalar Processors,
  • ”
  • IEEE Transactions on Computers, vol. 55, No. 3, pp. 281-291, Mar. 2006.
  • Chinese Office Action and Search Report for CN Application No. 201780063313.3, mailed Jan. 4, 2022; 12 pages.
  • Extended European Search Report for EP Patent Application No. 17840371.3, 8 pages, Feb. 18, 2020.
  • International Search Report
  • &
  • Written Opinion for PCT Application No. PCT/US2017/046602, 8 pages, Oct. 19, 2017.