hottub.patents
US 12,442,298 B2#3421635 Most CitedActiveUnited States (USPTO)Utility

Bolter miner and tunneling system

0Forward Citations (#3421635 Global)
0.0/yrCitation Velocity (#3421635 Global)
0.00Citation PageRank (#3421635 Global)
17Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

A tunneling and anchoring machine ( 100 ) and a tunneling system, the tunneling and anchoring machine ( 100 ) comprising a rack ( 1 ), a cutting device ( 2 ), a drilling device ( 3 ) and a control device; the cutting device ( 2 ) has a lowest swing angle (B) and a highest swing angle ( α ); the drilling device ( 3 ) comprises a drilling machine ( 31 ) and a sensor, the sensor is electrically connected to the drilling machine ( 31 ), the drilling machine ( 31 ) is suitable for drilling a roadway floor and/or a roadway roof, and the sensor is suitable for, when the drilling machine ( 31 ) is drilling, monitoring a set parameter of the drilling machine ( 31 ) and generating a monitoring data signal; the sensor is electrically connected to the control device, and the control device is suitable for receiving and analyzing the monitoring data signal; when the drilling machine ( 31 ) drills a first thickness of the roadway floor, if the monitoring data signal is greater than a first threshold, the control device is suitable for adjusting the lowest swing angle ( β ); and when the drilling machine ( 31 ) drills a second thickness of the roadway roof, if the monitoring data signal is greater than a second threshold, the control device is suitable for adjusting the highest swing angle ( α ).

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A bolter miner, comprising: a rack; a cutting device arranged on the rack and being swingable in an up-down direction, wherein the cutting device comprises a lowest swing angle, at which the cutting device is configured to cut coal rock at a bottom of a working face in a rock formation, and comprises a highest swing angle, at which the cutting device is configured to cut coal rock at a top of the working face; a drilling device arranged on the rack and comprising a drilling rig and a sensor electrically connected to the drilling rig, wherein the drilling rig is configured to drill at least one of a tunnel floor or a tunnel roof, and the sensor is configured to monitor set parameters of the drilling rig and to generate a monitoring data signal when the drilling rig is drilling, wherein the set parameters are related to properties of the rock formation; and a control device, to which the sensor is electrically connected, wherein the control device is configured to receive and analyze the

  2. Claim 2Depends on #1

    The bolter miner according to claim 1, wherein the drilling device comprises a lifting assembly connected to the rack; the drilling rig is arranged on the lifting assembly and is configured to install anchor rods; the lifting assembly is configured to lift the drilling rig, to allow the drilling rig to drill the tunnel floor and the tunnel roof.

  3. Claim 3Depends on #2

    The bolter miner according to claim 2, wherein the drilling device comprises a connecting member and a swinging driver; the connecting member has a first end connected to the lifting assembly and a second end rotatably connected to the rack; the swinging driver has a first end rotatably connected to the rack and a second end rotatably connected to the connecting member; the swinging driver is configured to drive the connecting member to swing in a width direction of the rack to adjust a distance between the drilling rig and a tunnel lateral wall.

  4. Claim 4Depends on #3

    The bolter miner according to claim 3, wherein the drilling device comprises a displacement driver, an extension direction of the displacement driver being identical to an extension direction of the connecting member; the displacement driver has a first end rotatably connected to the rack and a second end rotatably connected to the lifting assembly; the connecting member and the displacement driver are configured to expand and retract synchronously; the displacement driver is configured to drive the drilling rig to move in a length direction of the rack to adjust row spacing of anchor rods.

  5. Claim 5Depends on #3

    The bolter miner according to claim 3, wherein the connecting member comprises an inner sleeve and an outer sleeve; the inner sleeve is fitted in the outer sleeve and is slidable relative to the outer sleeve; a free end of the outer sleeve is rotatably connected to the rack, and a free end of the inner sleeve is rotatably connected to the lifting assembly; the swinging driver is rotatably connected to the outer sleeve; the outer sleeve is provided with an oil injection mouth configured to inject lubricating oil into the outer sleeve.

  6. Claim 6Depends on #2

    The bolter miner according to claim 2, wherein the drilling rig is rotatably connected to the lifting assembly, and the drilling rig is swingable in a height direction of the rack and the length direction of the rack to adjust an anchor rod installation direction.

  7. Claim 7Depends on #2

    The bolter miner according to claim 2, wherein: the lifting assembly comprises a frame body, a lifting driver, a guide column, a mounting plate and a chain; the guide column is arranged on the frame body and extends in the up-down direction; the mounting plate is mounted on the guide column in a guided and sliding manner and is configured to mount the drilling rig; one end of the lifting driver is connected to the frame body, and the lifting driver is provided with a first gear and a second gear, which are spaced apart along an extension direction of the lifting driver; the chain is engaged around outer circumferences of the first gear and the second gear and is connected to the mounting plate and the frame body, and the chain is configured to translate and rotate to drive the mounting plate to move, when the lifting driver is extended and retracted.

  8. Claim 8Depends on #2

    The bolter miner according to claim 2, wherein the drilling device install anchor rods and comprises a first drilling device and a second drilling device; the first drilling device and the second drilling device are arranged at a tail end of the rack and spaced apart along the width direction of the rack; the first drilling device is configured to drill and install anchor rods to a first lateral wall of the tunnel; and the second drilling device is configured to drill and install anchor rods to a second lateral wall of the tunnel.

Technical Overview & Description

CROSS-REFERENCE TO RELATED APPLICATION This application claims priority to and benefits of Chinese Patent Application No. 202111315963.7, filed on Nov. 8, 2021, the entire content of which is incorporated herein by reference. FIELD The present disclosure relates to the technical field of tunneling equipment, and more particularly to a bolter miner and a tunneling system using the bolter miner. BACKGROUND A bolter miner is mining equipment that can achieve tunneling and bolt support. The bolter miner is equipped with a cutting device and a bolt support device, in which the cutting device is used for tunneling operations, and the bolt support device is used for bolt support operations. The cutting device includes a cutting drum used to cut coal walls and a cutting arm used to drive the cutting drum to swing up and down. In order to ensure the mining efficiency and smooth tunneling footage, the bolter miner needs to advance along an extension direction of a coal seam. However, in the related art, due to the uncertainty of a dip angle of the front coal seam and the unevenness of the coal seam, the bolter miner may cut the roof and floor during the advancing process. As a result, the recovery rate is lowered, and the tunneling equipment is prone to damage due to the big hardness of rocks, causing production delay. SUMMARY The present disclosure aims solve at least one of the problems existing in the related art to at least some extent. To this end, embodiments of the present disclosure propose a bolter miner that prevents the cutting device from cutting a roof rock stratum and a floor rock stratum, improves the recovery rate, and prolongs the equipment service life. Embodiments of the present disclosure also propose a tunneling system using the above bolter miner. A bolter miner according to embodiments of the present disclosure includes: a rack; a cutting device arranged on the rack and being swingable in an up-down direction, wherein the cutting device includes a lowes

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (17)

PatentTitleYearCitations

Non-Patent Literature (2)

  • Chen et al.; Machine translation CN 103993879; All; Aug. 2014 (Year: 2014).
  • International Search Report corresponding to PCT Application No. PCT/CN2022/095785, mailed Jul. 28, 2022 (Chinese and English language document) (6 pages).