hottub.patents
US 12,438,370 B2#3425244 Most CitedActiveUnited States (USPTO)Utility

Load shedding in advanced metering infrastructure

0Forward Citations (#3425244 Global)
0.0/yrCitation Velocity (#3425244 Global)
0.00Citation PageRank (#3425244 Global)
6Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

A method, apparatus, and system for disconnecting loads from the electrical grid are disclosed. An application programming interface (API) frontend of an advanced metering infrastructure (AMI) load shedding system may receive a load shedding activation command; in response to receiving the load shedding activation command, the API frontend may deploy a load shedding token to one or more electricity meters of the AMI load shedding system, and cause the one or more electricity meters to disconnect corresponding loads from the one or more electricity meters.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A method performed at least in part by an advanced metering infrastructure (AMI) load shedding system, the method comprising: receiving, by an application programming interface (API) frontend of the AMI load shedding system, a load shedding activation command; in response to receiving the load shedding activation command, deploying, by the API frontend, a load shedding token to one or more electricity meters of the AMI load shedding system; and causing the one or more electricity meters to disconnect corresponding loads based at least in part on the load shedding token.

  2. Claim 2Depends on #1

    The method of claim 1, further comprising, prior to receiving the load shedding activation command by the API frontend: setting, by an authorization token service of the AMI load shedding system, a policy for a load shedding event associated with the load shedding activation command, wherein the one or more electricity meters are a target group of electricity meters of the AMI load shedding system in accordance with the policy.

  3. Claim 3Depends on #2

    The method of claim 2, further comprising: creating, by the API frontend, the load shedding event; sending, by the API frontend, a request for tokens, the tokens including the load shedding token and a load restoration token; receiving, by the API frontend, the load shedding token and the load restoration token; and loading, by the API frontend, the load shedding token and the load restoration token into the load shedding event.

  4. Claim 4Depends on #3

    The method of claim 3, further comprising: receiving, by the API frontend, a load restoration activation command; in response to receiving the load restoration activation command, deploying, by the API frontend, the load restoration token to the target group of electricity meters; and causing the target group of electricity meters to reconnect the disconnected loads based at least in part on the load restoration token.

  5. Claim 5Depends on #4

    The method of claim 4, wherein: the load shedding token and the load restoration token are encrypted, receiving, by the API frontend, the load shedding activation command includes: receiving, by the authorization token service, the load shedding activation command, transmitting, by the authorization token service, a key to the API frontend, and decrypting, by the API frontend, the load shedding token and the load restoration token using the key, and deploying, by the API frontend, the load shedding token to the target group of electricity meters includes: deploying, by the API frontend, the decrypted load shedding token to the target group of electricity meters.

  6. Claim 6Depends on #4

    The method of claim 4, wherein: the load shedding token and the load restoration token are encrypted, receiving, by the API frontend, the load shedding activation command includes: receiving, by the authorization token service, the load shedding activation command, transmitting, by the authorization token service, a key to the API frontend, forwarding, by the API frontend, the key to a distributed agent of the AMI load shedding system, and decrypting, by the distributed agent, the load shedding token and the load restoration token using the key, and deploying, by the API frontend, the load shedding token to the target group of electricity meters includes: deploying, by the distributed agent, the decrypted load shedding token to the target group of electricity meters.

  7. Claim 7Depends on #6

    The method of claim 6, wherein loading, by the API frontend, the load shedding token and the load restoration token into the load shedding event includes: forwarding, by the API frontend, the load shedding token and the load restoration token to the distributed agent; and caching, by the distributed agent, the load shedding token and the load restoration token.

  8. Claim 8Depends on #7

    The method of claim 7, wherein deploying, by the API frontend, the load restoration token to the target group of electricity meters includes: sending, by the API frontend, a command and timer information to the distributed agent; and deploying, by the distributed agent, the load restoration token to the target group of electricity meters based on the command and the timer information.

Technical Overview & Description

TECHNICAL FIELD The present disclosure generally relates to the field of electrical load management, and more specifically to methods, devices, and systems for preparing to disconnect and disconnecting premises via associated electricity meters from an electrical power grid. BACKGROUND A utility provider may perform load shedding by disconnecting services to some customers to prevent the electricity distribution system, or the grid, from being overloaded. The utility provider may also perform load shedding when demand for electrical power exceeds, or is expected to exceed, the available power, i.e., the demand is greater than the amount of power the generator is able to produce. For example, the weather conditions are expected to be hotter than usual for a few days, and the utility provider expects the demand for electricity, due to cooling, may exceed the available power. During the load shedding, electricity to specific power lines, a specific section of the electrical grid, or a feeder, which provide electricity to a group of customers' homes and businesses, may be turned off while maintaining electricity to other customers. However, critical services, such as hospitals, fire and police departments are frequently on the same feeder as non-critical loads, such as residential customers. Because present load shedding techniques require disconnection of entire feeders or distribution system sections, which the critical services may share with non-critical loads, the non-critical loads in those feeders or sections are unavailable for load disconnection. These non-critical loads may never experience a load disconnection event from the utility provider, which may prevent the utility provider from maximizing non-critical load disconnection resources and providing social equity for being able to distribute the load disconnection burden to all non-critical ratepayers in their territory. BRIEF DESCRIPTION OF THE DRAWINGS The detailed description is set forth with reference

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (6)

Non-Patent Literature (7)

  • Al Jajeh, et. al,
  • “
  • Island of a Microgrid Using a Distributed Multi-agent Control System
  • ”
  • , 2019 IEEE Energy Conversion Congress and Exposition (Ecce), IEEE, Sep. 29, 2019, pp. 6286-6293.
  • Search Report and Written Opinion for European Application No. 24154968.2, Dated Jul. 3, 2024, 8 pages.
  • Office Action for Canadian Application No. 3,225,813, Dated Feb. 21, 2025, 8 pages.