Systems for time-series predictive data analytics, and related methods and apparatus
Abstract
A predictive modeling method may include determining a time interval of time-series data; identifying one or more variables of the data as targets; determining a forecast range and a skip range associated with a prediction problem represented by the data; generating training data and testing data from the time-series data; fitting a predictive model to the training data; and testing the fitted model on the testing data. The forecast range may indicate a duration of a period for which values of the targets are to be predicted. The skip range may indicate a temporal lag between the time period corresponding to the data used to make predictions and the time period corresponding to the predictions. The skip range may separate input data subsets representing model inputs from subsets representing model outputs, and separate test data subsets representing model inputs from subsets representing validation data.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 80 · Forward citations: 0.
Claims (8)
- Claim 1Independent Claim
A computer-implemented modeling method comprising: obtaining a plurality of data sets, wherein each data set includes a plurality of observations, wherein each observation includes an indication of a time of the observation and values of one or more variables, wherein at least one of the variables is a target; setting values of a plurality of temporal parameters of a modeling procedure, the plurality of temporal parameters including a forecast range parameter and a skip range parameter, wherein the forecast range parameter indicates a duration of a period of time for prediction of one or more values of the target, and wherein the skip range parameter indicates a duration of a time period between a time of an earliest-in-time prediction in the forecast range and a time of a latest-in-time observation upon which the earliest-in-time prediction in the forecast range is based; segmenting at least one of the data sets into training-input data and training-output data based, at least in part
- Claim 2Depends on #1
The method of claim 1, wherein at least a group of the observations of the plurality of data sets include respective values of a first variable, and wherein the method further comprises, prior to training the model using the training-input data and the training-output data: determining that the values of the first variable comprise time values; for each observation in the group, generating a respective value of a second variable, wherein the respective value of the second variable comprises an offset between the respective time value of the first variable and a reference time value; and adding the respective values of the second variable to the respective observations in the group.
- Claim 3Depends on #2
The method of claim 2, further comprising: removing the values of the first variable from the observations in the group.
- Claim 4Depends on #1
The method of claim 1, further comprising determining the value of the forecast range parameter based, at least in part, on (1) a time interval of the plurality of data sets, (2) a number of observations included in the plurality of data sets, (3) a time period corresponding to the plurality of data sets, and/or (4) a natural time period selected from the group consisting of microseconds, milliseconds, seconds, minutes, hours, days, weeks, months, quarters, seasons, years, decades, centuries, and millennia.
- Claim 5Depends on #1
The method of claim 1, further comprising determining the value of the skip range parameter based, at least in part, on latency in collection of the plurality of data sets, latency in communication of the plurality of data sets, latency in analyzing the plurality of data sets, latency in communication of analyses of the plurality of data sets and/or latency of implementing actions based on the analyses of the plurality of data sets.
- Claim 6Depends on #1
The method of claim 1, further comprising: selecting validation data from the plurality of data sets based on the value of the forecast range parameter and the value of the skip range parameter, wherein the validation data include a subset of observations of at least one of the data sets; and performing cross-validation of the model using the validation data.
- Claim 7Depends on #6
The method of claim 6, wherein the model is trained and/or cross-validated using sliding windows, wherein the sliding windows correspond to sequential subsets of observations from at least one of the data sets.
- Claim 8Depends on #1
The method of claim 1, further comprising: selecting validation data from the plurality of data sets based on the value of the forecast range parameter and the value of the skip range parameter, wherein the validation data include a subset of observations of at least one of the data sets; and performing nested cross-validation of the model using the validation data.
Technical Overview & Description
This application is a continuation of and claims priority to U.S. patent application Ser. No. 15/790,803, titled “ Systems for Time-Series Predictive Data Analytics, and Related Methods and Apparatus ” and filed Oct. 23, 2017, which is a continuation-in-part of and claims priority to U.S. patent application Ser. No. 15/331,797, titled “ Systems and Techniques for Determining the Predictive Value of a Feature ” and filed on Oct. 21, 2016, which is a continuation-in-part of and claims priority to U.S. patent application Ser. No. 15/217,626, titled “ Systems and Methods for Predictive Data Analytics ” and filed on Jul. 22, 2016 (now U.S. Pat. No. 9,652,714, issued May 16, 2017), and also claims priority to and benefit of U.S. Provisional Patent Application No. 62/411,526, titled “ Systems and Techniques for Predictive Data Analytics ” and filed on Oct. 21, 2016; U.S. patent application Ser. No. 15/217,626 is a continuation of and claims priority to U.S. patent application Ser. No. 14/720,079, titled “ Systems and Methods for Predictive Data Analytics ” and filed on May 22, 2015 (now U.S. Pat. No. 9,489,630, issued Nov. 8, 2016), which claims priority to and benefit of U.S. Provisional Patent Application No. 62/002,469, titled “ Systems and Methods for Predictive Data Analytics ” and filed on May 23, 2014; this application also claims priority to and benefit of U.S. Provisional Patent Application No. 62/411,526, titled “ Systems and Techniques for Predictive Data Analytics ” and filed on Oct. 21, 2016; each of the foregoing applications is hereby incorporated by reference herein in its entirety. FIELD OF INVENTION The present disclosure relates generally to systems and techniques for time-series predictive data analysis. BACKGROUND Many organizations and individuals use electronic data to improve their operations or aid their decision-making. For example, many business enterprises use data management technologies to enhance the efficiency of various business processes,
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (80)
| Patent | Title | Year | Citations |
|---|---|---|---|
| DE 10,318,874 A1 | Tintenstrahl-Aufzeichnungsmaterial für Kopien | — | 0 |
Non-Patent Literature (10)
- “
- Machine Learning Techniques for Multimedia
- ”
- Cord et al (Year: 2008).
- A. Lorbert et al., Descent Methods for Tuning Parameter Refinement, Proceedings of the 13th International Conference on Artificial Intelligence and Statistics (AISTATS), 2010, pp. 469-476.
- A. Rudi et al., Adaptive Optimization for Cross Validation, Proceedings of the European Symposium on Artificial Neural Networks, Computational Intelligence, and Machine Learning, 2012, pp. 435-440.
- B. Boukhatem et al., Predicting concrete properties using neural networks (NN) with principal component analysis (PCA) technique, Computers and Concrete, vol. 10, No. 6, 2012, pp. 1-17.
- B. Flyvbjerg et al., What Causes Cost Overruns in Transport Infrastructure Projects?, Transport Reviews, vol. 24, 2004, pp. 1-40.
- B.K. Behera et al., Aabric Quality Evaluation By Objective Measurement, Indian Journal of Fibre and Textile Research, vol. 19, 1994, pp. 168-171.
- Barresse, Microsoft Excel 2013