Data center system, inter-base workload control method, and inter-base workload control system
Abstract
Power demand at each base is adjusted so as to improve a renewable energy utilization ratio at all bases. An inter-base workload control system manages an amount of excess power obtained by subtracting a power supply amount of the renewable energy power supply from a power consumption amount associated with execution of a workload in a future time range at the bases, spatial migratable time range information on a spatial migratable time range where spatial migration of migrating the workload in a future time range at the bases to another base is possible and temporal migratable time range information on temporal migration of delaying execution of the workload in the future time range at the bases within the same base and migrating the workload to another time range and a predicted amount of power consumption through execution of the workload in the future time range at the bases.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A data center system comprising: a plurality of bases provided with a calculation resource and a renewable energy power supply to execute a workload; and an inter-base workload control system to control migration of the workload between the plurality of bases and within a same base, wherein a processor of the inter-base workload control system manages: a positive excess power amount obtained by subtracting a predicted amount of power supply of the renewable energy power supply from a predicted amount of power consumption of the calculation resource associated with execution of the workload in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (22)
Non-Patent Literature (1)
- Extended European Search Report received in corresponding European Application No. 24161463.5 dated Aug. 21, 2024.