Battery charge state based mission assignment for autonomous mobile robots
Abstract
Disclosed are various embodiments for optimizing robot utilization in autonomous mobile robots by accounting for the battery charge state when assigning missions to be performed by the autonomous mobile robots in a material handling facility. In particular, mission data associated with one or more missions and robot data including a battery charge state associated with one or more robots can be analyzed to determine a robot mission assignment that accounts for battery state charge in order to maximize robot utilization and productivity of material handling tasks.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 0.
Claims (20 — 3 Independent, 17 Dependent)
- Claim 1Independent Claim
A system, comprising: at least one computing device; and at least one application executable in the at least one computing device, wherein when executed the at least one application causes the at least one computing device to at least: identify a plurality of autonomous robots configured to perform one or more types of material handling tasks in an unstructured material handling facility; identify a plurality of missions associated with the one or more types of material handling tasks to be performed within the unstructured material handling facility; determine robot data corresponding to individual autonomous robots of the plurality of autonomous robots, the robot data comprising a battery charge state and a battery health for the individual autonomous robots; determine mission data for individual missions of the plurality of missions, the mission data comprising at least one of a mission priority or a mission location; for individual autonomous robots, estimate a respective mission completion time for individual missions of the plurality of missions based at least in part on a respective estimated robot speed, a deceleration capability, a load time, an unload time, a mission length, a load weight, an estimated quantity of passing events, an estimated quantity of stop events, and historical data defining one or more congestion areas within the material handling facility, wherein the respective estimated robot speed is based at least in part on: a load weight associated with an individual mission, an estimation of a path that the autonomous robot will take during performance of the individual mission, and an aisle width of one or more of a plurality of aisles within the material handling facility; determine at least one assignment pairing of a respective autonomous robot of the plurality of autonomous robots with a respective mission of the plurality of missions based at least in part on a ranking of assignment scores assigned to a plurality of potential assignment pairings, a respective assignment score being based at least in part on the respective mission completion time and a plurality of factors derived from the robot data, historical data associated with characteristics of the material handling facility, and the mission data, the at least one assignment pairing being determined to optimize a robot utilization of the respective autonomous robot; and instruct the respective autonomous robot to perform the respective mission based at least in part on the at least one assignment pairing.
- Claim 2Depends on #1
The system of claim 1, wherein the robot data further comprises at least one of a robot location, a robot task capability, a robot battery health, or a robot task status.
- Claim 3Depends on #1
The system of claim 1, wherein, when executed, the at least one application further causes the at least one computing device to at least determine the plurality of factors based at least in part on the robot data and the mission data, the plurality of factors comprising at least one of a mission length, a load time, an unload time, a number of passing events, a number of stop events, a deceleration capability, or the respective estimated robot speed, the at least one assignment pairing being further based at least in part on one or more of the plurality of factors.
- Claim 4Depends on #1
The system of claim 1, wherein determining the at least one assignment pairing comprises: determining the plurality of potential assignments matching the plurality of autonomous robots with the plurality of missions; assigning the respective assignment score to individual potential assignments of the plurality of potential assignments; and ranking the assignment scores based at least in part on the respective assignment score associated with the individual potential assignments.
- Claim 5Independent Claim
A system, comprising: at least one computing device; and at least one application executable in the at least one computing device, wherein when executed the at least one application causes the at least one computing device to at least: identify an autonomous robot designed to perform a type of material handling task in a material handling facility; obtain mission data associated with individual missions of a plurality of missions corresponding to the type of material handling task that can be performed by the autonomous robot, the mission data comprising at least one of a mission priority, a mission length, or a mission location; estimate a respective mission completion time for the individual missions based at least in part on a respective estimated robot speed, a deceleration capability, a load time, an unload time, a mission length, a load weight, an estimated quantity of passing events, an estimated quantity of stop events for individual missions and historical data defining one or more congestion areas within the material handling facility, wherein the respective estimated robot speed is based at least in part on: a load weight associated with an individual mission, an estimation of a path that the autonomous robot will take during performance of the individual mission, and an aisle width of one or more of a plurality of aisles within the material handling facility; select a particular mission from the plurality of missions based at least in part on a ranking of respective assignment scores assigned to a plurality of potential assignment pairings of the autonomous robot and the individual missions, a respective assignment score being based at least in part on the respective mission completion time and a plurality of factors derived from the mission data, historical data associated with characteristics of the material handling facility, and robot data, the robot data comprising a battery charge state and a battery health of the autonomous robot; and instruct the autonomous robot to perform the particular mission.
- Claim 6Depends on #5
The system of claim 5, wherein the material handling facility comprises an unstructured environment for navigation of the autonomous robot.
- Claim 7Depends on #5
The system of claim 5, wherein the robot data further comprises at least one of a location of the autonomous robot within the material handling facility, a robot task capability, a robot task status, or a robot battery health.
- Claim 8Depends on #7
The system of claim 7, wherein, when executed, the at least one application further causes the at least one computing device to at least obtain the robot data from the autonomous robot.
- Claim 9Depends on #5
The system of claim 5, wherein the particular mission is further selected according to the plurality of factors comprising at least one of a load time, an unload time, a number of passing events, a number of stop events, a deceleration capability, or a robot speed.
- Claim 10Depends on #9
The system of claim 9, wherein, when executed, the at least one application further causes the at least one computing device to at least: generate a respective assignment score for individual missions of the plurality of missions based at least in part on the respective mission completion time, the plurality of factors, and the battery charge state of the autonomous robot; and rank a plurality of assignment scores based at least in part on the respective assignment score for the individual missions.
- Claim 11Depends on #9
The system of claim 9, wherein, when executed, the at least one application further causes the at least one computing device to at least estimate one or more factors of the plurality of factors based at least in part on the robot data and the mission data.
- Claim 12Depends on #11
The system of claim 11, wherein selecting the particular mission for the autonomous robot to perform is further based at least in part on the historical data associated with one or more characteristics of the material handling facility.
- Claim 13Depends on #5
The system of claim 5, wherein the particular mission is selected to optimize robot utilization of the autonomous robot.
- Claim 14Independent Claim
A method, comprising: identifying, by at least one computing device, a mission to be performed within an unstructured material handling facility; selecting, by the at least one computing device, a subset of autonomous robots in the unstructured material handling facility that can perform the mission based at least in part on a mission location of the mission; obtaining, by the at least one computing device, robot data associated with individual autonomous robots of the subset of autonomous robots, the robot data comprising a battery charge state and battery health of the individual autonomous robots; for the individual autonomous robots, estimate a respective mission completion time for the mission based at least in part on a respective estimated robot speed, a deceleration capability, a load time, an unload time, a mission length, a load weight, an estimated quantity of passing events, an estimated quantity of stop events, and historical data defining one or more congestion areas within the material handling facility, wherein the respective estimated robot speed is based at least in part on: a load weight associated with an individual mission, an estimation of a path that the autonomous robot will take during performance of the individual mission, and an aisle width of one or more of a plurality of aisles within the material handling facility; selecting, by the at least one computing device, a particular autonomous robot from the subset of autonomous robots based at least in part on a ranking of assignment scores assigned to a plurality of potential assignment pairings of the mission and the individual autonomous robots, a respective assignment score for individual potential assignment pairings being based at least in part on the respective mission completion time, historical data associated with characteristics of the material handling facility, and a plurality of factors derived from the robot data and mission data associated with the mission; and instructing, by the at least one computing device, the particular autonomous robot to perform the mission within the unstructured material handling facility.
- Claim 15Depends on #14
The method of claim 14, wherein selection of the particular autonomous robot to perform the mission is based at least in part on optimizing robot utilization of the particular autonomous robot.
- Claim 16Depends on #14
The method of claim 14, wherein selecting the particular autonomous robot further comprises at least: for individual potential assignment pairings comprising the mission and the individual autonomous robots of the subset of autonomous robots: determining the plurality of factors based at least in part on the robot data and the mission data; assigning a respective weight to individual factors of the plurality of factors; and generating the respective assignment score based at least in part on a sum of weights assigned to the individual factors, and wherein the particular autonomous robot is selected based at least in part on the score meeting or exceeding a predefined threshold.
- Claim 17Depends on #16
The method of claim 16, wherein the plurality of factors comprise at least one of a mission length, a load time, an unload time, a number of passing events, a number of stop events, a deceleration capability, or the estimated robot speed.
- Claim 18Depends on #14
The method of claim 14, wherein the robot data further comprises at least one of a location of the particular autonomous robot within the unstructured material handling facility, the battery charge state, a robot task capability, a robot task status, or a robot battery health.
- Claim 19Depends on #14
The method of claim 14, wherein the particular autonomous robot is selected from the subset of autonomous robots based at least in part on learned congestion data associated with one or more areas of the unstructured material handling facility that are associated with the mission.
- Claim 20Depends on #14
The method of claim 14, wherein the mission comprises moving an object from a first location to a second location, and estimating the respective mission completion time is further based at least in part on the first location, the second location, and the mission data.
Technical Overview & Description
BACKGROUND At material handling facilities, various items, articles, products, or packages may be organized for shipment to other locations. A variety of tasks may be performed in various types of material handling facilities including, such as receiving shipments of new inventory, storing new inventory in storage locations, picking items from the inventory storage locations in response to receiving orders, grouping the picked items, packing the items, readying the packed items for shipment, and sorting the packed items according to a final destination. As packages containing, for example, inventory and/or pre-packaged customer orders are received at material handling facilities, the packages can be transported to various locations within the facility prior to delivery to another destination. BRIEF DESCRIPTION OF THE DRAWINGS Many aspects of the present disclosure can be better understood with reference to the following drawings. The components in the drawings are not necessarily to scale, with emphasis instead being placed upon clearly illustrating the principles of the disclosure. Moreover, in the drawings, like reference numerals designate corresponding parts throughout the several views. FIG. 1 illustrates an example material handling facility according to various aspects of the embodiments of the present disclosure. FIG. 2 illustrates an example of an autonomous mobile robot being assigned to an available mission based at least in part on the battery charge state of the autonomous mobile robot according to various aspects of the embodiments of the present disclosure. FIG. 3 is a schematic block diagram of a networked environment according to various embodiments of the present disclosure. FIGS. 4 - 7 are flowcharts illustrating examples of functionality implemented as portions of the robot mission coordinator executed in a computing environment in the networked environment of FIG. 3 according to various embodiments of the present disclosure. FIG. 8 is a schemati
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (9)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (2)
- Ali Bolu, Adaptive Task Planning for Multi-Robot Smart Warehouse, Feb. 9, 2021, IEEE Access (Year: 2021).
- Lukas Polten, Scheduling automated guided vehicles in very narrow aisle warehouses, Jan. 23, 2020, Elsevier, Omega (Year: 2020).