US 12,393,992 B2#3465527 Most CitedActiveUnited States (USPTO)Utility

Systems and methods for assessing and controlling sustainability of an energy plant

0Forward Citations (#3465527 Global)
0.0/yrCitation Velocity (#3465527 Global)
0.00Citation PageRank (#3465527 Global)
80Prior Art Cited
27Claims (2 Indep. · 25 Dep.)
17Drawings / Sheets

Abstract

Systems and methods for controlling building equipment include simulating operation of the building equipment at a plurality of initial points to generate corresponding values of a first control objective and a second control objective that competes with the first control objective, automatically generating a new point at which to run a new simulation based on the plurality of initial points and the corresponding values of the control objectives, running the new simulation at the new point to generate corresponding values of the control objectives, classifying a subset of the plurality of initial points and the new point as Pareto-optimal points based on the corresponding values of the control objectives, and operating the building equipment at a Pareto-optimal point selected from the subset of the plurality of initial points and the new point classified as Pareto-optimal points.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 80 · Forward citations: 0.

Claims (27 — 2 Independent, 25 Dependent)

  1. Claim 1Independent Claim

    A system for controlling building equipment comprising: one or more processors and one or more non-transitory computer-readable media storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising: simulating operation of the building equipment at a plurality of initial points to generate corresponding values of a first control objective and a second control objective that competes with the first control objective, wherein simulating the operation of the building equipment comprises executing a control algorithm subject to one or more constraints, each of the plurality of initial points defining a different simulation configuration comprising different values for the one or more constraints; automatically generating a new point at which to run a new simulation based on the plurality of initial points and the corresponding values of the first control objective and the second control objective; running the new simulation at the new point to generate corresponding values of the first control objective and the second control objective; classifying a subset of the plurality of initial points and the new point as Pareto-optimal points based on the corresponding values of the first control objective and the second control objective; and operating the building equipment at a Pareto-optimal point selected from the subset of the plurality of initial points and the new point classified as Pareto-optimal points.

  2. Claim 2Depends on #1

    The system of claim 1, wherein simulating the operation of the building equipment at the plurality of initial points comprises running an initial simulation for each of the plurality of initial points, each initial simulation generating a corresponding value of the first control objective and a corresponding value of the second control objective.

  3. Claim 3Depends on #1

    The system of claim 1, wherein automatically generating the new point at which to run the new simulation comprises executing a process configured to suggest one or more Pareto-optimal points based on the plurality of initial points and the corresponding values of the first control objective and the second control objective.

  4. Claim 4Depends on #1

    The system of claim 1, wherein automatically generating the new point at which to run the new simulation comprises: constructing an approximation function based on the plurality of initial points and the corresponding values of the first control objective and the second control objective for the plurality of initial points; and finding a point that optimizes the approximation function.

  5. Claim 5Depends on #1

    The system of claim 1, the operations further comprising: generating an updated dataset comprising the plurality of initial points, the new point, and the corresponding values of the first control objective and the second control objective for the plurality of initial points and the new point; and automatically generating a second new point at which to run a second new simulation based on the updated dataset.

  6. Claim 6Depends on #1

    The system of claim 1, the operations further comprising: providing a user interface that indicates the subset of the plurality of initial points and the new point classified as Pareto-optimal points; and receiving a user selection of the Pareto-optimal point at which to operate the building equipment via the user interface.

  7. Claim 7Depends on #1

    The system of claim 1, the operations further comprising providing a user interface comprising values of a set of performance metrics comprising at least the first control objective and the second control objective, each set of performance metrics predicted to result from operating the building equipment at one of the plurality of initial points.

  8. Claim 8Depends on #1

    The system of claim 1, the operations further comprising: adjusting weights assigned to a plurality of performance metrics characterizing the operation of the building equipment at the plurality of initial points; and assigning a score to each of the plurality of initial points, each score based on (i) values of the plurality of performance metrics predicted to result from operating the building equipment at the plurality of initial points and (ii) the weights assigned to the plurality of performance metrics.

  9. Claim 9Depends on #1

    The system of claim 1, the operations further comprising: assigning a score to each of the plurality of initial points based on values of a plurality of performance metrics predicted to result from operating the building equipment at the plurality of initial points; and providing a user interface that arranges the plurality of initial points according to the score assigned to each of the plurality of initial points.

  10. Claim 10Independent Claim

    A method for controlling building equipment comprising: simulating operation of the building equipment at a plurality of initial points to generate corresponding values of a first control objective and a second control objective that competes with the first control objective, wherein simulating the operation of the building equipment comprises executing a control algorithm subject to one or more constraints, each of the plurality of initial points defining different values for the one or more constraints; automatically generating a new point at which to run a new simulation based on the plurality of initial points and the corresponding values of the first control objective and the second control objective; running the new simulation at the new point to generate corresponding values of the first control objective and the second control objective; classifying a subset of the plurality of initial points and the new point as Pareto-optimal points based on the corresponding values of the first control objective and the second control objective; and operating the building equipment at a Pareto-optimal point selected from the subset of the plurality of initial points and the new point classified as Pareto-optimal points.

  11. Claim 11Depends on #10

    The method of claim 10, wherein simulating the operation of the building equipment at the plurality of initial points comprises running an initial simulation for each of the plurality of initial points, each initial simulation generating a corresponding value of the first control objective and a corresponding value of the second control objective.

  12. Claim 12Depends on #10

    The method of claim 10, wherein automatically generating the new point at which to run the new simulation comprises executing a process configured to suggest one or more Pareto-optimal points based on the plurality of initial points and the corresponding values of the first control objective and the second control objective.

  13. Claim 13Depends on #10

    The method of claim 10, wherein automatically generating the new point at which to run the new simulation comprises: constructing an approximation function based on the plurality of initial points and the corresponding values of the first control objective and the second control objective for the plurality of initial points; and finding a point that optimizes the approximation function.

  14. Claim 14Depends on #10

    The method of claim 10, further comprising: generating an updated dataset comprising the plurality of initial points, the new point, and the corresponding values of the first control objective and the second control objective for the plurality of initial points and the new point; and automatically generating a second new point at which to run a second new simulation based on the updated dataset.

  15. Claim 15Depends on #10

    The method of claim 10, further comprising: providing a user interface that indicates the subset of the plurality of initial points and the new point classified as Pareto-optimal points; and receiving a user selection of the Pareto-optimal point at which to operate the building equipment via the user interface.

  16. Claim 16Depends on #10

    The method of claim 10, further comprising providing a user interface comprising values of a set of performance metrics comprising at least the first control objective and the second control objective, each set of performance metrics predicted to result from operating the building equipment at one of the plurality of initial points.

  17. Claim 17Depends on #10

    The method of claim 10, further comprising: adjusting weights assigned to a plurality of performance metrics characterizing the operation of the building equipment at the plurality of initial points; and assigning a score to each of the plurality of initial points, each score based on (i) values of the plurality of performance metrics predicted to result from operating the building equipment at the plurality of initial points and (ii) the weights assigned to the plurality of performance metrics.

  18. Claim 18Depends on #1

    The system of claim 1, wherein the different values for the one or more constraints are related to different building equipment simulated for a respective initial point of the plurality of initial points.

  19. Claim 19Depends on #1

    The system of claim 1, wherein the control algorithm comprises an optimization of an objective function.

  20. Claim 20Depends on #19

    The system of claim 19, wherein the objective function comprises at least one objective different from the first control objective and the second control objective.

  21. Claim 21Depends on #1

    The system of claim 1, wherein simulating the operation comprises simulating the operation for multiple time elements.

  22. Claim 22Depends on #1

    The system of claim 1, the operations further comprising estimating a Pareto front from the plurality of initial points and the new point and providing a user interface that indicates the Pareto front.

  23. Claim 23Depends on #10

    The method of claim 10, wherein the different values for the one or more constraints are related to different building equipment simulated for a respective initial point of the plurality of initial points.

  24. Claim 24Depends on #10

    The method of claim 10, wherein the control algorithm comprises an optimization of an objective function.

  25. Claim 25Depends on #24

    The method of claim 24, wherein the objective function comprises at least one objective different from the first control objective and the second control objective.

  26. Claim 26Depends on #10

    The method of claim 10, wherein simulating the operation comprises simulating the operation for multiple time elements.

  27. Claim 27Depends on #10

    The method of claim 10, further comprising estimating a Pareto front from the plurality of initial points and the new point and providing a user interface that indicates the Pareto front.

Technical Overview & Description

CROSS-REFERENCE TO RELATED PATENT APPLICATIONS This application is a continuation-in-part of U.S. patent application Ser. No. 17/692,642 filed Mar. 11, 2022, which is a continuation of U.S. patent application Ser. No. 16/655,745, filed Oct. 17, 2019 (now U.S. Pat. No. 11,276,125), which claims the benefit of and priority to Indian Provisional Patent Application No. 201821039497, filed Oct. 18, 2018. This application is also a continuation-in-part of U.S. patent application Ser. No. 17/483,078 filed Sep. 23, 2021, which claims the benefit of and priority to U.S. Provisional Application No. 63/194,771, filed May 28, 2021, and U.S. Provisional Application No. 63/220,878, filed Jul. 12, 2021. U.S. patent application Ser. No. 17/483,078 is also a continuation-in-part of U.S. application Ser. No. 17/403,669, filed Aug. 16, 2021, which is a continuation-in-part of U.S. application Ser. No. 16/927,759 filed Jul. 13, 2020 (now U.S. Pat. No. 11,269,306), which claims the benefit of and priority to U.S. Provisional Patent Application No. 62/873,631 filed Jul. 12, 2019, and U.S. Provisional Patent Application No. 63/044,906 filed Jun. 26, 2020. U.S. patent application Ser. No. 17/403,669 is also a continuation-in-part of U.S. patent application Ser. No. 17/393,138 filed Aug. 3, 2021, which is a continuation of U.S. patent application Ser. No. 16/927,766 filed Jul. 13, 2020 (now U.S. Pat. No. 11,131,473), which claims the benefit of and priority to U.S. Provisional Patent Application No. 62/873,631 filed Jul. 12, 2019, and U.S. Provisional Patent Application No. 63/044,906 filed Jun. 26, 2020. The entire disclosures of each of these patent applications and patents are incorporated by reference herein. BACKGROUND The present disclosure relates generally to a central plant or central energy facility configured to serve the energy loads of a building or campus. The present disclosure relates more particularly to determining an optimal configuration of a central plant from various p

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

Non-Patent Literature (10)

  • Noakes et al.,
  • “
  • Appraising healthcare ventilation design from combined infection control and energy perspective,
  • ”
  • HVAC
  • &
  • R Research, Aug. 2012, (20 pages).
  • Chang et al.,
  • “
  • A cost-effectiveness assessment of the operational parameters of central HVAC systems during pandemics,