Methodology and system for utilizing rig power and mud pump assembly
Abstract
A technique facilitates a drilling operation, e.g. a land-based drilling operation, by enabling a substantial reduction in the number of equipment components. According to an embodiment, a mud pump assembly is provided with at least one mud pump located on a rig positioned at a wellsite. Electric power is provided to the rig to enable operation of the rig, including operation of the mud pumps when pumping mud downhole to facilitate drilling of a borehole. The rig's electric power also is used to operate a cement mixer for mixing a cementing fluid. This cementing fluid may be pumped downhole during a cementing operation by the same mud pumps employed during the mud pumping operation.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 80 · Forward citations: 0.
Claims (8)
- Claim 1Independent Claim
A method for reducing equipment employed in a drilling operation at a wellsite, comprising: providing a mud pump assembly with mud pumps positioned on a rig located at the wellsite; delivering electric power to the rig to enable operation of the rig; using the electric power provided to the rig to operate a cement mixing system to mix a drilling mud; using a transformer to adjust a voltage of the electric power supplied to the cement mixing system; using the electric power provided to the rig to operate the mud pumps during a mud pumping operation in which the drilling mud is pumped downhole to facilitate drilling of a borehole; further using the electric power to operate the cement mixing system to mix a cementing fluid; and subsequently utilizing the mud pumps to pump the cementing fluid during a cementing operation.
- Claim 2Depends on #1
The method as recited in claim 1, further comprising positioning the cement mixing system on a cement mixer skid to facilitate mixing of the drilling mud and the cementing fluid.
- Claim 3Depends on #2
The method as recited in claim 2, further comprising connecting the cement mixer skid to the rig.
- Claim 4Depends on #1
The method as recited in claim 1, further comprising locating the cement mixing system on the rig.
- Claim 5Depends on #1
The method as recited in claim 1, further comprising flushing the cementing fluid from the mud pump assembly by flowing a flushing fluid through a flush out line of a suction manifold of the mud pump assembly to a cleanout port of the mud pump assembly.
- Claim 6Depends on #1
The method as recited in claim 1, further comprising providing the cement mixing system with a liquid additive system containing liquid which can be mixed into the cementing fluid to control characteristics of the cementing fluid.
- Claim 7Independent Claim
A system for use in a well, comprising: a rig located at a wellsite, the rig having a rig power supply; one or more drilling components positioned on the rig; a mud pump assembly having a plurality of mud pumps, the mud pump assembly being positioned on the rig; a cement mixing system coupled to the rig, the cement mixing system being operable to mix a cementing fluid which is used during a cementing operation with respect to the well, wherein the one or more drilling components, the mud pump assembly and the cement mixing system are powered via the rig power supply; and a generator interface box to enable connection and disconnection of the cement mixing system to the rig power supply without disruption of the rig power supply for the one or more drilling components and the mud pump assembly.
- Claim 8Depends on #7
The system as recited in claim 7, wherein the cement mixing system is located directly on the rig.
Technical Overview & Description
CROSS-REFERENCE TO RELATED APPLICATION The present document is based on and claims priority to U.S. Provisional Application Ser. No. 63/490,956, filed Mar. 17, 2023, which is incorporated herein by reference in its entirety. BACKGROUND Hydrocarbon fluids such as oil and natural gas are obtained from a well located in a subterranean geologic formation, referred to as a reservoir. The well is prepared by drilling and completing a wellbore that penetrates the hydrocarbon-bearing formation. The drilling and completing processes are complex and expensive involving a wide variety of equipment which must be transported to the wellsite and then operated and maintained. This equipment often includes a mud pumping assembly and a cement pumping assembly to facilitate drilling of the wellbore and cementing of a wellbore casing. In a land-based operation, at least some of this equipment may be positioned on a land rig. However, the cement mixing equipment is located on a separate cement skid which is not part of the rig. Power for the cement mixing equipment is provided by separate generators which, in turn, are powered by dedicated diesel engines. Once the cementing fluid, e.g. cement slurry, is mixed on the separate cement skid, the cementing fluid is routed to cementing fluid pumps which are powered by dedicated motive units. Accordingly, the overall cementing system comprises a large number of independent, dedicated components. Substantial expense is involved in transporting all of these components to the wellsite, maintaining these components, and operating these components. Additionally, the equipment requires substantial space at the wellsite. SUMMARY In general, a methodology and system are provided for facilitating a drilling operation, e.g. a land-based drilling operation, with a substantial reduction in the number of equipment components. According to an embodiment, a mud pump assembly is provided with at least one mud pump located on a rig positioned at a wellsite. E
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (80)
| Patent | Title | Year | Citations |
|---|---|---|---|
| JP 4,191,513 B2 | 水素発生装置 | 2008 | 0 |
Non-Patent Literature (4)
- Office Action issued in U.S. Appl. No. 18/351,204 dated Mar. 12, 2024, 14 pages.
- Office Action issued in U.S. Appl. No. 18/351,223 dated Jun. 6, 2024, 10 pages.
- International Search Report and Written Opinion issued in International Patent application PCT/US2024/020159 on Jul. 3, 2024, 12 pages.
- International Search Report and Written Opinion issued in International Patent application PCT/US2024/020152 on Jul. 2, 2024, 11 pages.