Construction knowledge graph
Abstract
An example computing platform is configured to (i) receive a data asset related to a construction project; (ii) determine, via a first machine-learning algorithm, at least one physical location within the construction project to which the received data asset is related; (iii) associate the received data asset with the determined physical location; (iv) based on the determined physical location, determine, via a second machine-learning algorithm, a respective relationship between the received data asset and one or more other data assets related to the construction project; and (v) add the received data asset to a construction knowledge graph as a node that is connected to one or more other respective nodes that represent the one or more other data assets.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 1.
Claims (8)
- Claim 1Independent Claim
A computing platform comprising: a network interface; at least one processor; non-transitory computer-readable medium; and program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing platform is configured to: receive an informational data asset that was generated via a given software tool and is related to a construction project; determine, via a machine-learning model, a physical location within the construction project to which the received informational data asset is related; store an association between the received informational data asset and the determined physical location; based on the determined physical location, determine one or more respective proximity relationships between the received informational data asset and one or more other data assets related to the construction project; add, to a construction knowledge graph, a node that represents the received informational data asset; ad
- Claim 2Depends on #1
The computing platform of claim 1, wherein the program instructions that are executable to determine, via the machine-learning model, the physical location within the construction project to which the received informational data asset is related comprise program instructions that are executable to: identify, within the received informational data asset, an indication of at least one of the one or more other data assets, wherein the at least one of the one or more other data assets is related to the determined physical location.
- Claim 3Depends on #2
The computing platform of claim 2, wherein the program instructions that are executable to identify, within the received informational data asset, an indication of at least one of the one or more other data assets comprise program instructions that are executable to: identify an indication of a design object that is associated with location coordinates within the construction project; and determine that the location coordinates associated with the design object are the determined physical location within the construction project to which the received informational data asset is related.
- Claim 4Depends on #1
The computing platform of claim 1, wherein the program instructions that are executable to determine the one or more respective proximity relationships between the received informational data asset and one or more other data assets comprise program instructions that are executable to: determine that the determined physical location to which the received informational data asset is related is within a threshold distance from a physical location associated with the one or more other data assets.
- Claim 5Depends on #1
The computing platform of claim 1, wherein the program instructions that are executable to determine the one or more respective proximity relationships between the received informational data asset and one or more other data assets comprise program instructions that are executable to: determine a predicted proximity relationship between the received informational data asset and a currently unrelated data asset.
- Claim 6Depends on #5
The computing platform of claim 5, further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing platform is configured to: determine a node within the construction knowledge graph that (i) corresponds to the user and (ii) is related to the received informational data asset; and generate a notification of the predicted proximity relationship for presentation on the client station associated with the user.
- Claim 7Depends on #1
The computing platform of claim 1, wherein each respective edge between the node that represents the received informational data asset and a respective other node in the construction knowledge graph comprises a respective edge that characterizes the respective proximity relationship between the received informational data asset and the other data asset represented by the respective other node.
- Claim 8Independent Claim
A non-transitory computer-readable medium, wherein the non-transitory computer-readable medium is provisioned with program instructions that, when executed by at least one processor, cause a computing platform to: receive an informational data asset that was generated via a given software tool and is related to a construction project; determine, via a machine-learning model, a physical location within the construction project to which the received informational data asset is related; store an association between the received informational data asset and the determined physical location; based on the determined physical location, determine one or more respective proximity relationships between the received informational data asset and one or more other data assets related to the construction project; add, to a construction knowledge graph, a node that represents the received informational data asset; add, to the construction knowledge graph, one or more respective edges that connect the
Technical Overview & Description
BACKGROUND Software applications are used on a regular basis to perform and manage tasks in users' personal and professional capacities. As some examples, software applications may assist users with managing tasks related to email communications, customer relationship management, billing and payroll processing, human resources management, and construction project design and management. Many other types of software applications exist. Software applications handle a large volume of information and can be complex. It is therefore desirable for software applications to provide sophisticated features and tools which can enhance a user's ability to interact with the software application, obtain desired information, and improve the overall user experience. Thus, any tool that can improve a user's interaction with a software application is desired. OVERVIEW A construction project often involves the creation of an immense amount of information, involving a large number of different stakeholders that may be creators or consumers — often both — of such information. At the inception of a construction project an owner may coordinate with planners, architects, and engineers in a planning and design phase to define the scope and develop the design for the project (e.g., a new building). This phase may take months or years depending on the size of the project, and may result in the creation of project-specific design specifications, architectural plans, engineering plans, etc. These various different plans generally comprise visual representations of the construction project that visually communicate information about the construction project, such as how to assemble or construct different parts of the project. Such visual representations tend to take one of at least two different forms. One form may be a two-dimensional technical drawing in which two-dimensional line segments of the drawing represent certain physical elements of the construction project like walls and ducts. In th
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 12,801,800 B2 | AI-assisted automated turnover systems | 2026 | 0 |
References Cited — Backward Prior Art (19)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (10)
- International Searching Authority, PCT International Search Report and Written Opinion, PCT International Application No. PCT/US2022/027680, dated Aug. 23, 2022, 10 pages.
- Abioye, Sofiat O. et al.,
- “
- Artificial Intelligence in the Construction Industry: A Review of Present Status, Opportunities and Future Challenges
- ”
- , Journal of Building Engineering, vol. 44, Oct. 5, 2021, 13 pages.
- “
- What's a Common Data Environment (CDE)?
- ”
- , Digital Builder, https://constructionblog.autodesk.com/common-data-environment/, Dec. 1, 2019, downloaded from the Internet Jul. 6, 2021, 15 pages.