hottub.patents
US 12,372,955 B2#3484363 Most CitedActiveUnited States (USPTO)Utility

Building data platform with digital twin functionality indicators

0Forward Citations (#3484363 Global)
0.0/yrCitation Velocity (#3484363 Global)
0.00Citation PageRank (#3484363 Global)
80Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

A building system operates to store a digital twin comprising a building graph, the building graph comprising a plurality of nodes representing a plurality of entities of a building and a plurality of edges between the plurality of nodes representing relationships between the plurality of entities. The instructions cause the one or more processors to determine a value for a functionality indicator for a piece of building equipment based on data received from the piece of building equipment, identify a first node of the plurality of nodes representing the functionality indicator by identifying an edge of the plurality of edges relating a second node of the plurality of nodes representing the piece of building equipment to the first node, and cause the first node to store the value for the functionality indicator, or a link to the value for the functionality indicator.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 80 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A building system comprising: one or more memory devices storing instructions thereon that, when executed by one or more processors, cause the one or more processors to: store a digital twin comprising a building graph, the building graph comprising a plurality of nodes representing a plurality of entities of a building and a plurality of edges between the plurality of nodes representing relationships between the plurality of entities; identify a piece of building equipment to perform a diagnostic on based on a first node of the plurality of nodes, the first node representing the piece of building equipment; determine one or more diagnostic messages based on the building graph and communicate the one or more diagnostic messages, by the digital twin, to the piece of building equipment causing the piece of building equipment to perform one or more operations; receive one or more diagnostic message responses from the piece of building equipment indicating the one or more operations of the

  2. Claim 2Depends on #1

    The building system of claim 1, wherein the functionality indicator indicates a state of the piece of building equipment and a confidence level that the state determined for the piece of building equipment is correct.

  3. Claim 3Depends on #1

    The building system of claim 1, wherein the instructions cause the one or more processors to: generate a first functionality indicator for a first operational capability of the piece of building equipment and a second functionality indicator for a second operational capability of the piece of building equipment; and generate the value for the functionality indicator based on the first functionality indicator and the second functionality indicator.

  4. Claim 4Depends on #3

    The building system of claim 3, wherein a third node of the plurality of nodes represents the first operational capability and a fourth node of the plurality of nodes represents the first functionality indicator and is related to the third node by a second edge of the plurality of edges; wherein a fifth node of the plurality of nodes represents the second operational capability and a sixth node of the plurality of nodes represents the second functionality indicator and is related to the fifth node by a third edge of the plurality of edges; wherein a fourth edge of the plurality of edges relates the first node to the third node; wherein a fifth edge of the plurality of edges relates the first node to the fifth node.

  5. Claim 5Depends on #1

    The building system of claim 1, wherein the instructions cause the one or more processors to: detect an absence of one or more particular diagnostic message responses that were expected to be received from the piece of building equipment responsive to the one or more diagnostic messages; and generate the value for the functionality indicator based on an indication of the absence of the one or more particular diagnostic message responses.

  6. Claim 6Depends on #1

    The building system of claim 1, wherein the instructions cause the one or more processors to: compare the one or more operations of the piece of building equipment to one or more expected operations associated with the one or more diagnostic messages; and determine the value for the functionality indicator of the piece of building equipment based on a result of comparing the one or more operations of the piece of building equipment to the one or more expected operations.

  7. Claim 7Depends on #1

    The building system of claim 1, wherein the instructions cause the one or more processors to: determine, based on the building graph, that an operation of the piece of building equipment is detectable by a second piece of building equipment; execute a diagnostics routine comprising causing, by a first digital twin, the piece of building equipment to perform the operation and receiving, by a second digital twin, one or more detections of the operation by the second piece of building equipment; and generate the value for the functionality indicator for the piece of building equipment based on a result of the diagnostics routine.

  8. Claim 8Depends on #7

    The building system of claim 7, wherein: a third node of the plurality of nodes represents the second piece of building equipment; and one or more edges of the plurality of edges relate the first node to the third node indicating that the operation of the piece of building equipment is detectable by the second piece of building equipment; wherein the instructions cause the one or more processors to determine that the operation of the piece of building equipment is detectable by the second piece of building equipment by identifying the one or more edges of the plurality of edges relating the first node to the third node.

Technical Overview & Description

BACKGROUND This application relates generally to a building system of a building. This application relates more particularly to systems for managing and processing data of the building system. A building system may aggregate and store building data received from building equipment and/or other data sources. The building data can be stored in a database. The building can include a building system that operates analytic and/or control algorithms against the data to detect issues with the operation of the building equipment. However, the development and/or deployment of the analytic and/or control algorithms may be time consuming and require a significant amount of software development. Furthermore, the analytic and/or control algorithms may lack flexibility to adapt to changing circumstances or deployment situations. SUMMARY Digital Twin Diagnostics A building system including one or more memory devices storing instructions thereon that, when executed by one or more processors cause the one or more processors to store a digital twin for a piece of building equipment, the digital twin including a virtual representation of the piece of building equipment, wherein the digital twin communicates with the piece of building equipment to operate the piece of building equipment. The instructions cause the one or more processors to determine one or more diagnostic messages based on the virtual representation of the piece of building equipment and communicate the one or more diagnostic messages, by the digital twin, to the piece of building equipment causing the piece of building equipment to perform one or more operations, receive one or more diagnostic message responses from the piece of building equipment indicating the one or more operations of the piece of building equipment, and generate a diagnostics report for the piece of building equipment, the diagnostics report indicating a performance of the piece of building equipment based on the one or more diagnostic message res

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

Non-Patent Literature (10)

  • U.S. Appl. No. 17/566,029, Passivelogic, Inc.
  • U.S. Appl. No. 17/567,275, Passivelogic, Inc.
  • U.S. Appl. No. 17/722,115, Passivelogic, Inc.
  • U.S. Appl. No. 17/528,026, filed Nov. 16, 2021, Johnson Controls Tyco IP Holdings LLP.
  • U.S. Appl. No. 17/528,038, filed Nov. 16, 2021, Johnson Controls Tyco IP Holdings LLP.
  • U.S. Appl. No. 17/529,118, filed Nov. 17, 2021, Johnson Controls Tyco IP Holdings LLP.
  • U.S. Appl. No. 17/529,120, filed Nov. 17, 2021, Johnson Controls Tyco IP Holdings LLP.
  • U.S. Appl. No. 17/537,046, filed Nov. 29, 2021, Johnson Controls Tyco IP Holdings LLP.
  • Balaji et al.,
  • “