hottub.patents
US 12,363,647 B2#3492606 Most CitedActiveUnited States (USPTO)Utility

Variable duty cycle for power control

0Forward Citations (#3492606 Global)
0.0/yrCitation Velocity (#3492606 Global)
0.00Citation PageRank (#3492606 Global)
4Prior Art Cited
22Claims (3 Indep. · 19 Dep.)
11Drawings / Sheets

Abstract

A method of operating a user equipment, UE, that is served by a radio access network, RAN, includes determining an uplink duty cycle for uplink transmission by the UE to the RAN, and selecting a peak uplink power level in response to the determined uplink duty cycle. A method of operating a UE according to some embodiments that communicates with a RAN via a plurality of component carriers includes determining an aggregate uplink duty cycle based on scheduled uplink time intervals across the plurality of component carriers, and selecting a peak uplink transmission power level for transmitting uplink signals on the plurality of component carriers in response to the determined aggregate uplink duty cycle. Related devices are also disclosed.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 0.

Claims (22 — 3 Independent, 19 Dependent)

  1. Claim 1Independent Claim

    A method of operating a user equipment (UE) that is served by a radio access network (RAN), the method comprising: determining an uplink duty cycle for uplink transmission by the UE to the RAN; and selecting a peak uplink power level in response to the determined uplink duty cycle; wherein: the duty cycle is modified due to: device heat management; discontinuous transmission (DTX); discontinuous reception (DRX); measurement gaps; specific absorption rate; and/or proximity detection, determining the uplink duty cycle comprises determining the uplink duty cycle based on a slot format indicator (SFI) provided by a network node in the RAN; and the UE selects the peak uplink power for user during a time period such that an average uplink power during the time period is less than a predetermined power level.

  2. Claim 2Depends on #1

    The method of claim 1, wherein determining the uplink duty cycle comprises determining the uplink duty cycle based on a common time division duplexing (TDD) uplink/downlink pattern provided by a network node in the RAN.

  3. Claim 3Depends on #1

    The method of claim 1, wherein determining the uplink duty cycle comprises determining the uplink duty cycle based on a dedicated uplink/downlink pattern provided by a network node in the RAN.

  4. Claim 4Depends on #1

    The method of claim 1, wherein the uplink duty cycle represents a fraction of time in a time period during which the UE is scheduled to transmit uplink signals to the RAN.

  5. Claim 5Depends on #4

    The method of claim 4, wherein the time period is a frame.

  6. Claim 6Depends on #4

    The method of claim 4, wherein the uplink duty cycle is determined on a timeslot by timeslot basis.

  7. Claim 7Depends on #1

    The method of claim 1, wherein the uplink duty cycle represents a fraction of time in a time period that is reserved for transmission of uplink signals to the RAN.

  8. Claim 8Depends on #1

    The method of claim 1, wherein the uplink duty cycle represents a fraction of time in a time period that is reserved for transmission of uplink signals to the RAN or that is reserved for flexible time slots.

  9. Claim 9Depends on #1

    The method of claim 1, wherein the uplink duty cycle is determined on a symbol by symbol basis.

  10. Claim 10Depends on #1

    The method of claim 1, wherein the uplink duty cycle is determined based on a number of slots or symbols reserved for downlink communications in a given time period.

  11. Claim 11Depends on #1

    The method of claim 1, wherein the UE is connected to the RAN via carrier aggregation, and wherein the uplink duty cycle is determined across a plurality of component carriers.

  12. Claim 12Depends on #11

    The method of claim 11, wherein the uplink duty cycle is determined based on a number of time intervals that are reserved for uplink transmission on any of the plurality of component carriers.

  13. Claim 13Depends on #11

    The method of claim 11, wherein the uplink duty cycle is determined based on a number of time intervals that are reserved for uplink transmission or that are available for uplink or downlink communications on any of the plurality of component carriers.

  14. Claim 14Depends on #11

    The method of claim 11, wherein the UE is connected to a first cell group served by a new radio (NR) network node and to a second cell group served by a long term evolution (LTE) node via dual connectivity, and wherein the duty cycle is determined based on an uplink/downlink configuration provided for the second cell group and based on a common time division duplexing (TDD) uplink/downlink pattern, dedicated uplink/downlink pattern and/or slot frame indicator (SFI) provided for the first cell group.

  15. Claim 15Depends on #11

    The method of claim 11, wherein the duty cycle is determined as a N/P, where N is a number of time intervals in a given time period in which the UE is scheduled to transmit uplink communications and P is a total number of time intervals in the time period.

  16. Claim 16Depends on #1

    The method of claim 1, wherein the predetermined power level is 23 dBm.

  17. Claim 17Depends on #1

    The method of claim 1, wherein the duty cycle is modified due to any type of maximum power reduction (MPR) that is associated with an operating band of the UE.

  18. Claim 18Depends on #1

    The method of claim 1, wherein the duty cycle on a frequency range FR1 of 410 MHz to 7125 MHz is modified due to the uplink transmissions on a frequency range FR2 of 24250 MHz to 52600 MHz or a duty cycle of FR2 transmissions.

  19. Claim 19Independent Claim

    A method of operating a user equipment (UE) that communicates with a radio access network (RAN) via a plurality of component carriers, the method comprising: determining an aggregate uplink duty cycle based on scheduled uplink time intervals across the plurality of component carriers; and selecting a peak uplink transmission power level for transmitting uplink signals on the plurality of component carriers in response to the determined aggregate uplink duty cycle; wherein: the duty cycle is modified due to: device heat management; discontinuous transmission (DTX); discontinuous reception (DRX); measurement gaps; specific absorption rate; and/or proximity detection; determining the uplink duty cycle comprises determining the uplink duty cycle based on a slot format indicator (SFI) provided by a network node in the RAN; and selecting the peak uplink power for user during a time period such that an average uplink power during the time period is less than a predetermined power level.

  20. Claim 20Depends on #19

    The method of claim 19, further comprising transmitting uplink communications using the selected peak uplink transmission power level.

  21. Claim 21Depends on #19

    The method of claim 19, wherein the duty cycle is modified for carrier aggregation due to UE capability to transmit and receive simultaneously.

  22. Claim 22Independent Claim

    A user equipment (UE) node, comprising: a processor; a wireless transceiver coupled to the processor; and a memory coupled to the processor, wherein the memory comprises computer readable instructions that, when executed by the processor, cause the UE to perform operations comprising: determining an uplink duty cycle for uplink transmission by the UE to a radio access network (RAN); and selecting a peak uplink power level in response to the determined uplink duty cycle; wherein: the duty cycle is modified due to: device heat management; discontinuous transmission (DTX); discontinuous reception (DRX); measurement gaps; specific absorption rate; and/or proximity detection; determining the uplink duty cycle comprises determining the uplink duty cycle based on a slot format indicator (SFI) provided by a network node in the RAN; and selecting the peak uplink power for user during a time period such that an average uplink power during the time period is less than a predetermined power level.

Technical Overview & Description

RELATED APPLICATIONS This application is a national stage application of International Patent Application No. PCT/IB2020/059299, filed Oct. 3, 2020, which claims the benefit of U.S. Provisional Pat. App. No. 62/911,091 filed Oct. 4, 2019, the disclosures of which are incorporated herein by reference in their entirety. TECHNICAL FIELD The present application relates to communication networks, and in particular to power control in wireless communication networks. BACKGROUND As 5G networks are deployed, there is interest in integrating 5G nodes in systems that support previous standards, such as Long Term Evolution (LTE, also referred to as E-UTRA or EUTRA). When a 5G radio access network (RAN) node is connected to an LTE core network (the Evolved Packet Core, or EPC), or vice-versa (i.e., an LTE RAN node is connected to a 5G core network (5GC)), the integration is referred to as “ interworking. ” There are different ways to deploy 5G networks with or without interworking with LTE and evolved packet core (EPC), as depicted in FIG. 1 . In principle, NR and LTE can be deployed without any interworking, denoted by NR stand-alone (SA) operation. That is, a RAN node, such as a gNB, in NR can be connected to a 5G core network (5GC) and an LTE RAN node, such as an eNB, can be connected to EPC with no interconnection between the two (Option 1 and Option 2 in FIG. 1 ). On the other hand, the first supported version of NR is the so-called EN-DC (E-UTRAN-NR Dual Connectivity), illustrated by Option 3 in FIG. 1 . In such a deployment, dual connectivity between NR and LTE is implemented with the LTE RAN node acting as the master node (MN) and the NR RAN node acting as the secondary node (SN). Accordingly, in EN-DC, the UE is connected to an E-UTRA eNB as master node and a gNB as secondary node. Both the MeNB and the en-gNB are connected to an EPC core network. The RAN node (gNB) supporting NR may not have a control plane connection to the EPC core network, and instead relies on the

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (4)

PatentTitleYearCitations

Non-Patent Literature (10)

  • 3GPP,
  • “
  • 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels and modulation (Release 15)
  • ”
  • , TS 36.211 V15.7.0. pp. 9-95, Sep. 2019.
  • 3GPP,
  • “
  • 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control (Release 15)
  • ”
  • , TS 38.213 V15.7.0, Sep. 2019.