Systems and methods for dynamic tuning of controller in power grids
Abstract
Methods and systems relating to improvements in controlling power grid systems are provided. Improvements include dynamic tuning of compromise optimization control in power grid systems. The controlling of assets associated with a power grid system may include optimizing for several conflicting objectives. The performance of the optimization with respect to each objective may be monitored in real-time or near real-time and based on streaming and historic data relating to the system. The optimization may be adjusted in real-time or near real-time when it is determined that the performance of the optimization is not meeting specific levels of performance in regard to one or more of the conflicting objectives. Further, user input may be provided to the system to assign priority levels to one or more of the conflicting objectives.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 0.
Claims (17 — 3 Independent, 14 Dependent)
- Claim 1Independent Claim
A method comprising: at one or more electronic devices each having one or more processors and memory: controlling a plurality of assets in a power grid system, the controlling comprising: receiving live operational data associated with the power grid system; using a controller having an optimizer for performing multi-objective compromise optimization for a plurality of conflicting objectives based on the live operational data, wherein the plurality of conflicting objectives are associated with the controlling the plurality of assets; generating historical performance information of the controller in relation to at least one of the plurality of conflicting objectives based on the received live operational data; using an estimation model to perform a single-objective optimization for one of the plurality of conflicting objectives without regard to the other of the plurality of conflicting objectives; generating historical model performance information of the controller in relation to the one of the plurality of conflicting objectives based on an outcome of the single-objective optimization; determining if a performance of the controller meets a predefined level of performance in relation to at least one of the plurality of objectives based on the historical performance information of the controller and on the historical model performance information of the controller in relation to the one of the plurality of conflicting objectives; adjusting the optimizer of the controller in response to determining that the performance of the controller does not meet the predefined level of performance; and providing control signal information for the plurality of assets for exerting control over the assets in the power grid system.
- Claim 2Depends on #1
The method of claim 1, wherein the adjusting the optimizer comprises changing a prioritization of the at least one objective in the multi-objective compromise optimization for which the controller does not meet the predefined level of performance.
- Claim 3Depends on #2
The method of claim 2, wherein the changing a prioritization of the at least one objective comprises changing a value of a coefficient associated with the at least one objective in a multi-objective compromise optimization function.
- Claim 4Depends on #1
The method of claim 1, further comprising: receiving predefined threshold information associated with the at least one of the plurality of objectives, wherein the determining if a performance of the controller meets a predefined level of performance in relation to the at least one of the plurality of objectives is further based on the predefined threshold information.
- Claim 5Depends on #1
The method of claim 1, wherein the receiving, the generating, the determining, and the adjusting are all preformed within a predefined time interval, wherein the predefined time interval is 1 hour.
- Claim 6Depends on #1
The method of claim 1, wherein at least one of the plurality of assets in the power grid system receives power from a renewable power generation source.
- Claim 7Independent Claim
A system, comprising: one or more processors; and memory storing instructions for execution by the one or more processors, the instructions for operations comprising: controlling a plurality of assets in a power grid system, the controlling comprising: receiving live operational data associated with the power grid system; using a controller having an optimizer for performing multi-objective compromise optimization for a plurality of conflicting objectives based on the live operational data, wherein the plurality of conflicting objectives are associated with the controlling the plurality of assets; generating historical performance information of the controller in relation to at least one of the plurality of conflicting objectives based on the received live operational data; using an estimation model to perform a single-objective optimization for one of the plurality of conflicting objectives without regard to the other of the plurality of conflicting objectives; generating historical model performance information of the controller in relation to the one of the plurality of conflicting objectives based on an outcome of the single-objective optimization; determining if a performance of the controller meets a predefined level of performance in relation to at least one of the plurality of objectives based on the historical performance information of the controller and on the historical model performance information of the controller in relation to the one of the plurality of conflicting objectives; adjusting the optimizer of the controller in response to determining that the performance of the controller does not meet the predefined level of performance; and providing control signal information for the plurality of assets for exerting control over the assets in the power grid system.
- Claim 8Depends on #7
The system of claim 7, wherein the adjusting the optimizer comprises changing a prioritization of the at least one objective in the multi-objective compromise optimization for which the controller does not meet the predefined level of performance.
- Claim 9Depends on #8
The system of claim 8, wherein the changing a prioritization of the at least one objective comprises changing a value of a coefficient associated with the at least one objective in a multi-objective compromise optimization function.
- Claim 10Depends on #7
The system of claim 7, further comprising: receiving predefined threshold information associated with the at least one of the plurality of objectives, wherein the determining if a performance of the controller meets a predefined level of performance in relation to the at least one of the plurality of objectives is further based on the predefined threshold information.
- Claim 11Depends on #7
The system of claim 7, wherein the receiving, the generating, the determining, and the adjusting are all preformed within a predefined time interval, wherein the predefined time interval is 1 hour.
- Claim 12Depends on #7
The system of claim 7, wherein at least one of the plurality of assets in the power grid system receives power from a renewable power generation source.
- Claim 13Independent Claim
A non-transitory computer-readable medium having computer-readable instructions stored thereon, the computer-readable instructions executable by at least one processor to cause the performance of operations comprising: controlling a plurality of assets in a power grid system, the controlling comprising: receiving live operational data associated with the power grid system; using a controller having an optimizer for performing multi-objective compromise optimization for a plurality of conflicting objectives based on the live operational data, wherein the plurality of conflicting objectives are associated with the controlling the plurality of assets; generating historical performance information of the controller in relation to at least one of the plurality of conflicting objectives based on the received live operational data; using an estimation model to perform a single-objective optimization for one of the plurality of conflicting objectives without regard to the other of the plurality of conflicting objectives; generating historical model performance information of the controller in relation to the one of the plurality of conflicting objectives based on an outcome of the single-objective optimization; determining if a performance of the controller meets a predefined level of performance in relation to at least one of the plurality of objectives based on the historical performance information of the controller and on the historical model performance information of the controller in relation to the one of the plurality of conflicting objectives; adjusting the optimizer of the controller in response to determining that the performance of the controller does not meet the predefined level of performance; and providing control signal information for the plurality of assets for exerting control over the assets in the power grid system.
- Claim 14Depends on #13
The computer-readable medium of claim 13, wherein the adjusting the optimizer comprises changing a prioritization of the at least one objective in the multi-objective compromise optimization for which the controller does not meet the predefined level of performance.
- Claim 15Depends on #14
The computer-readable medium of claim 14, wherein the changing a prioritization of the at least one objective comprises changing a value of a coefficient associated with the at least one objective in a multi-objective compromise optimization function.
- Claim 16Depends on #13
The computer-readable medium of claim 13, the operations further comprising: receiving predefined threshold information associated with the at least one of the plurality of objectives, wherein the determining if a performance of the controller meets a predefined level of performance in relation to the at least one of the plurality of objectives is further based on the predefined threshold information.
- Claim 17Depends on #13
The computer-readable medium of claim 13, wherein the receiving, the generating, the determining, and the adjusting are all preformed within a predefined time interval, wherein the predefined time interval is 1 hour.
Technical Overview & Description
FIELD The present disclosure relates to controlling electrical power grid systems. BACKGROUND As a result of environmental and regulatory targets to reduce carbon emissions from electricity generation, power grids are currently undergoing a major transition away from centralized, fossil fuel-powered generation sources. Renewable energy sources have emerged as an alternative source of electricity to generate less carbon emissions. This has resulted in increased penetration of renewable electricity generation, for example wind and solar power, and distributed energy resources, for example electric vehicles, and battery energy storage systems, within a power grid. Electricity that is supplied by renewables is highly variable and fluctuates throughout the day. Renewable energy sources are also not dispatchable by the operator, and thus the operator must plan for fossil fuel-based generation to meet the remaining demand. Dispatchable power generation generally refers to power sources that can be dispatched on-demand upon a request from a power grid operator. If renewable energy is not properly predicted, or fossil-fuel-based generation is overprovisioned, then the excess renewable energy may be curtailed. Excess renewable energy that is curtailed represents a lost opportunity to reduce carbon emissions, as this excess energy is often replaced by fossil-fuel-powered generation. These effects are compounded with increasing renewable and distributed energy resources (DERs) penetration in the electrical grid. As the grid has relatively low amounts of storage capacity relative to generation, the balance between electrical supply and demand is typically maintained by dispatchable fossil-fuel-based units in order to prevent power blackout or brownout scenarios. This balance between electrical supply and demand is often constrained to energy cost and carbon emissions targets. At the same time, there may be an attempt to minimize electricity costs and carbon emissions from electr
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (19)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (10)
- Franklin Y. Cheng, Multiobjective Optimum Design of Structures With Genetic Algorithm and Game Theory: Application to Life-Cycle Cost Design, Computational Mechanics in Structural Engineering, Elsevier Science Ltd, 1999, pp. 1-16. https://doi.org/10.1016/B978-008043008-9/50039-9. (Year: 1999).
- Yang Z, et al. Epsilon constrained method for constrained multiobjective optimization problems: some preliminary results. GECCO Comp '14: Proc. of the Companion Publication of the 2014 Annual Conference on Genetic and Evolutionary Computation, pp. 1181-1186. https://doi.org/10.1145/2598394.2610012. (Year: 2014).
- Hoseyn Sayyaadi (2021). Chapter 6
- —
- Optimization basics. In: Modeling, Assessment, and Optimization of Energy Systems, Academic Press, pp. 327-430. https://doi.org/10.1016/B978-0-12-816656-7.00006-3. (Year: 2021).
- Buckley.,
- “
- Fuzzy Hierarchical Analysis,
- ”
- Fuzzy Sets and Systems, 1985, vol. 17(3), pp. 233-247.