Method of controlling tensile-splitting and hydro-shearing parameters during completion of enhanced geothermal system wells
Abstract
Methods and systems for geothermal energy production wherein multiple horizontal or vertical wells may be used to pass fluids through the Earth from an injector well to a producer well through induced cracks, splits, fractures, conduits, or channels in the rock. Such methods and systems may include controlling tensile-split conduits in a subterranean geothermal formation by providing an injection well, providing a production well, configuring the injection well for injection of a tensile-splitting fluid into a production zone, configuring the production well to produce a heated fluid from the production zone, applying pressure to the production well, creating a plurality of tensile-split conduits, raising or lowering the pressure in the production well, establishing fluid communication between the injection well and the production well, and producing the heated fluid to the surface.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 1.
Claims (8)
- Claim 1Independent Claim
A method of drilling naturally fractured geothermal reservoirs, comprising: drilling a vertical pilot well in a formation comprising a geothermal heat reservoir; obtaining data on the properties of the formation, wherein the properties are derived from core or electric logs, wherein the data comprises temperature data on the formation; determining the direction and depth of a potential horizontal lateral; determining the orientations of fractures in the formation; drilling a managed pressure horizontal lateral until one of the fractures is encountered; employing underbalanced drilling for the managed pressure horizontal lateral, wherein the pressure exerted by the effective circulating density is lower than a rock pore pressure when drilling through porous rock, and further wherein the pressure exerted by the effective circulating density is lower than a borehole stability pressure when drilling through non-porous impermeable rock; running one or more cementing sleeves into the managed
- Claim 2Depends on #1
The method of claim 1, wherein the method comprises employing managed pressure drilling, wherein the pressure exerted by the effective circulating density is equal to the rock pore pressure, rather than employing underbalanced drilling.
- Claim 3Depends on #1
The method of claim 1, wherein the method comprises employing blind drilling when fractures are present, wherein the blind drilling is performed with a mud fluid weight that results in no returns of cuttings or circulation fluid to the surface.
- Claim 4Depends on #1
The method of claim 1, wherein the step of obtaining data employs cooled MWD tools for formation temperatures below 175 degrees Celsius.
- Claim 5Depends on #4
The method of claim 4, wherein a slick line deployed system is employed as a backup if the formation temperatures exceed 175 degrees Celsius.
- Claim 6Depends on #1
The method of claim 1 further comprising employing a new intermediate casing to install a stage collar in a section of the vertical pilot well.
- Claim 7Depends on #6
The method of claim 6 further comprising circulating cooling fluid into an annulus of the vertical pilot well.
- Claim 8Depends on #1
The method of claim 1 further comprising conducting selective cementing operations in the horizontal lateral.
Technical Overview & Description
CROSS-REFERENCE TO RELATED APPLICATIONS This application is a continuation-in-part of U.S. patent application Ser. No. 18/804,291 filed on Aug. 14, 2024, which is a continuation-in-part of U.S. patent application Ser. No. 18/644,250 filed on Apr. 24, 2024, which claims priority to U.S. Provisional Application No. 63/535,469 filed on Aug. 30, 2023, and U.S. Provisional Application No. 63/540,435 filed on Sep. 26, 2023, which are all herein incorporated by reference in their entirety. BACKGROUND 1. Field of Inventions The field of this application and any resulting patent is methods and systems for geothermal energy production. More specifically, methods and systems for energy or mineral production wherein multiple horizontal or near-horizontal wells may be used to pass fluids through the Earth from an injector well to a producer well through induced cracks, splits, fractures, conduits, or channels in the rock, as well as methods and systems for energy or mineral production wherein horizontal or near horizontal wells are drilled, completed, and equipped for production or injection service. 2. Description of Related Art Various methods and systems have been proposed and utilized for geothermal energy production, including some of the methods and systems disclosed in the references appearing on the face of this patent. However, those methods and systems lack all the steps or features of the methods and systems covered by any patent claims below. As will be apparent to a person of ordinary skill in the art, any methods and systems covered by claims of the issued patent solve many of the problems that prior art methods and systems have failed to solve. Also, the methods and systems covered by at least some of the claims of this patent have benefits that could be surprising and unexpected to a person of ordinary skill in the art based on the prior art existing at the time of invention. Large quantities of heat are captured in the Earth's subsurface formations. From the sur
Cited By — Indexed Forward Citations (1 of 1 total)
References Cited — Backward Prior Art (4)
| Patent | Title | Year | Citations |
|---|