hottub.patents
US 12,324,972 B2#3526719 Most CitedActiveUnited States (USPTO)Utility

Explosion-proof hitting ball and training device including the same

0Forward Citations (#3526719 Global)
0.0/yrCitation Velocity (#3526719 Global)
0.00Citation PageRank (#3526719 Global)
21Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

An explosion-proof hitting ball and a training device including the same are provided, wherein the explosion-proof hitting ball includes: a tubular member made of plastic material and including an outer wall; and a ball member made of explosion-proof material and including a tubular wall and a ball wall, the tubular wall and the ball wall being transverse and connected to each other to form a chamber, the tubular wall being disposed around the tubular member and integrally connected to the outer wall by melting-connection.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A training device comprising: a base; a connection rod assembly connected to and vertically extending upward from the base; and an explosion-proof hitting ball including: a tubular member made of plastic material and including an outer wall; and a ball member made of explosion-proof material and including a tubular wall and a ball wall, the tubular wall and the ball wall being transverse and connected to each other to form a chamber, the tubular wall being disposed around the tubular member and integrally connected to the outer wall by a melting connection; wherein the explosion-proof hitting ball is disposed around a proximal end of the connection rod assembly.

  2. Claim 2Depends on #1

    The training device of claim 1, wherein the tubular member is harder than the ball member.

  3. Claim 3Depends on #2

    The training device of claim 2, wherein: the explosion-proof hitting ball further includes a metal tube, and the tubular member is disposed around the metal tube; the tubular member has a wall thickness larger than a wall thickness of the tubular wall; a sum of the wall thickness of the tubular member and the wall thickness of the tubular wall is defined as a first dimension, a wall thickness of the ball wall is defined as a second dimension, and the first dimension is larger than the second dimension; the ball member and the tubular member are made of different materials, and the tubular wall and the outer wall are made of different materials and integrally connected to each other by the melting connection; the tubular member is protrusive beyond the ball member; the ball member is made of polyvinyl chloride (PVC) or polypropylene (PP); a ratio of the first dimension to the second dimension ranges from 1.1 to 2.0; and the explosion-proof hitting ball further includes a valve member, a

  4. Claim 4Depends on #1

    The training device of claim 1, wherein the tubular member has a wall thickness larger than a wall thickness of the tubular wall.

  5. Claim 5Depends on #1

    The training device of claim 1, wherein a sum of a wall thickness of the tubular member and a wall thickness of the tubular wall is defined as a first dimension, a wall thickness of the ball wall is defined as a second dimension, and the first dimension is larger than the second dimension.

  6. Claim 6Depends on #1

    The training device of claim 1, wherein the ball member and the tubular member are made of different materials, and the tubular wall and the outer wall are made of different materials and integrally connected to each other by the melting-connection.

  7. Claim 7Depends on #1

    The training device claim 1, further including a metal tube, wherein the tubular member is disposed around the metal tube.

  8. Claim 8Depends on #1

    The training device of claim 1, wherein the connection rod assembly includes a main portion, a blocking portion, a plug and a fixation assembly, the main portion defines an axial direction and a radial direction, the blocking portion projects in the radial direction on a side of the main portion remote from the base, the explosion-proof hitting ball is disposed around the main portion about the axial direction and abutted against the blocking portion, the plug is positioned in an opening of the main portion remote from the base, and the fixation assembly is connected to the plug and blocks the explosion-proof hitting ball in the axial direction.

Technical Overview & Description

BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to an explosion-proof hitting ball and a training device including the same. Description of the Prior Art Hitting training device allows users to train their hitting strength, hitting posture, hitting accuracy, and responsiveness. Usually, the members used for hitting are filled with fillings to simulate the hitting training and to absorb the impact force to protect the user's hands. The very common filling is sponge, cotton, rubber chips, sand, foam material, or air. However, when the cladding encapsulating the filling is broken, the filling will be spread on the ground, causing the environment to be messy and difficult to clean up. If the cladding breaks during the hitting practice, the filling can even burst and injure persons. If the filling is air, very loud noises will occur during the explosion of the cladding, which will scare persons, and the fragments of the cladding can cause injuries to persons when the cladding bursts. The present invention is, therefore, arisen to obviate or at least mitigate the above-mentioned disadvantages. SUMMARY OF THE INVENTION The main object of the present invention is to provide an explosion-proof hitting ball and a training device including the same, which will not burst so that it can effectively avoid injuries and damages. To achieve the above and other objects, an explosion-proof hitting ball is provided, wherein the explosion-proof hitting ball includes: a tubular member made of plastic material and including an outer wall; and a ball member made of explosion-proof material and including a tubular wall and a ball wall, the tubular wall and the ball wall being transverse and connected to each other to form a chamber, the tubular wall being disposed around the tubular member and integrally connected to the outer wall by melting-connection. To achieve the above and other objects, a training device is provided, wherein the training device includ

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (21)