hottub.patents
US 12,248,366 B2#3592981 Most CitedActiveUnited States (USPTO)Utility

Software application development tool for automation of maturity advancement

0Forward Citations (#3592981 Global)
0.0/yrCitation Velocity (#3592981 Global)
0.00Citation PageRank (#3592981 Global)
13Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

A method includes receiving, from a first remote device, an initial first plurality of status metrics corresponding to a first domain, each of the initial plurality of status metrics indicating whether a corresponding parameter of the first domain requires remediation. The method includes comparing the initial plurality of status metrics to a reference database, the reference database listing previously encountered problems with known remediation solutions. The method includes receiving from the first remote device, an updated plurality of status metrics corresponding the first domain, each of the updated plurality of status metrics indicating whether a corresponding parameter of the first domain requires remediation. The method includes applying an algorithm to the updated plurality of status metrics to generate a maturity score of the first domain. The method includes combining the maturity score of the first domain and a maturity score of a second domain to generate a maturity report.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A method for improving a status metric of a software application, comprising: receiving, at a server from a first remote device, a first status metric corresponding to a first parameter of a first domain of the software application; processing the first status metric to determine a first normalized score for the first status metric; generating and sending a graphical user interface to a display, the graphical user interface including the first normalized score; comparing the first normalized score to a reference database to determine whether the first parameter requires remediation based on the first normalized score, the reference database listing previously encountered problems with the first parameter and corresponding known remediation solutions; generating and sending a first button for the graphical user interface to the display on a condition that a match of the first status metric exists in the reference database, wherein: the first button is configured to send a first instruct

  2. Claim 2Depends on #1

    The method of claim 1, wherein the first status metric is generated by running an automated job at periodic intervals to collect data corresponding to the first parameter.

  3. Claim 3Depends on #1

    The method of claim 1, wherein the processing the first status metric includes performing an extract, transform, and load process on the first status metric.

  4. Claim 4Depends on #1

    The method of claim 1, further comprising: applying a first algorithm to the improved first normalized score to generate a maturity score of the first domain; combining the maturity score of the first domain and a maturity score of a second domain to generate a maturity report of the software application; and sending the maturity report to the display.

  5. Claim 5Depends on #1

    The method of claim 1, further comprising: receiving, from a second remote device, a second status metric corresponding to a second parameter of a second domain of the software application; processing the second status metric to determine a second normalized score for the second status metric; comparing the second normalized score to the reference database to determine whether the second parameter requires remediation based on the second normalized score, the reference database listing previously encountered problems with the second parameter and corresponding known remediation solutions; generating and sending a second button for the graphical user interface to the display on a condition that a match of the second status metric exists in the reference database, wherein: the second button is configured to send a second instruction to the second remote device to implement a second known remediation solution upon activation of the second button, and the second known remediation solution

  6. Claim 6Depends on #5

    The method of claim 5, further comprising: assigning the higher priority to the first status metric on a condition that the second normalized score is higher than the first normalized score, wherein the higher priority indicates sending the first instruction to the first remote device before sending the second instruction to the second remote device.

  7. Claim 7Independent Claim

    A non-transitory computer readable storage medium comprising instructions for improving a status metric of a software application, which when executed on a computer processor causes the processor to perform a method, the method comprising: receiving, at a server from a first remote device, a first status metric corresponding to a first parameter of a first domain of the software application; processing the first status metric to determine a first normalized score for the first status metric; generating and sending a graphical user interface to a display, the graphical user interface including the first normalized score; comparing the first normalized score to a reference database to determine whether the first parameter requires remediation based on the first normalized score, the reference database listing previously encountered problems with the first parameter and corresponding known remediation solutions; generating and sending a first button for the graphical user interface to the

  8. Claim 8Depends on #7

    The non-transitory computer readable storage medium of claim 7, wherein the first status metric is generated by running an automated job at periodic intervals to collect data corresponding to the first parameter.

Technical Overview & Description

CROSS-REFERENCE TO RELATED APPLICATIONS This application is a continuation of U.S. patent application Ser. No. 17/551,522, filed on Dec. 15, 2021, and claims the benefit of Indian Patent Application number 202111049618, filed on Oct. 29, 2021, the contents of which are hereby incorporated by reference in their entirety. BACKGROUND Field of the Invention Systems and methods consistent with the present disclosure generally relate to advancing maturity of software applications. More particularly, systems and methods consistent with the disclosure relate to identifying and quantifying factors that correspond to software application maturity to enable targeted and prioritized advancement of that maturity through autonomous and manual direction. Discussion of the Related Art Businesses and institutions that develop and implement software applications are faced with a variety of stability and performance issues that affect a software application's reliability to perform as intended. These issues are typically addressed as they arise and as more issues are resolved, the software application's reliability improves. This is also referred to as an increase in maturity. However, given that there are a variety of different domains from which issues can arise, and potentially multiple different software applications that must be monitored, it can be difficult to know (i) a totality of what the current issues are for a given software application, (ii) how best to prioritize issues that must be addressed for a given software application, and (iii) which software applications should be given the most time and attention for improvement. Overall, there is a need to more efficiently and effectively advance the maturity of software applications that takes into account all known relevant issues. Traditionally, improvement of enterprise level software applications has been addressed in a compartmentalized fashion. In particular, various teams/individuals have been tasked with servicing a

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (13)

PatentTitleYearCitations

Non-Patent Literature (10)

  • Pardhe,
  • “
  • Dynamic Universal Maturity Assessment System
  • ”
  • , 2021, IEEE (Year: 2021).
  • International Search Report and Written Opinion mailed Jan. 23, 2023 (11 pages).
  • Pardhe,
  • “
  • Dynamic Universal Maturity Assessment System
  • ”