Flow-based processing in wireless systems
Abstract
Apparatuses and methods of flow-based processing is wireless systems are described. For example, in one method, a WTRU may determine that one or more data units correspond to a flow of such data units. The WTRU may perform such determination as a function of one or more matching rule(s). Flow-based processing may be enabled in the layer 2/layer 1 chain by per-packet determination using one or more rules, for example by routing through the applicable processing functions and/or using the applicable configuration and/or mapping to the applicable uplink physical layer functions and/or resources. One or more functions such as scheduling request, buffer status reporting, HARQ processing, and/or radio link failure and recovery may be controlled based on the policy associated with the flow corresponding to the data being processed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 33 · Forward citations: 0.
Claims (8)
- Claim 1Independent Claim
A wireless transmit/receive unit (WTRU), comprising: circuitry comprising any of a transmitter, receiver, processor and memory, the circuitry configured to determine current buffer status information, wherein the current buffer status information comprises a buffer level associated with at least one logical channel, wherein the buffer level indicates an amount of data for transmission for the at least one logical channel; trigger a buffer status report (BSR); receive configuration information indicating one or more logical channel prioritization rules configured for the at least one logical channel; determine that available uplink resources for an uplink transmission fail to meet at least one of the logical channel prioritization rules configured for the at least one logical channel; based on the available uplink resources for the uplink transmission failing to meet at least one of the logical channel prioritization rules, transmit a scheduling request (SR) in connection with the trigg
- Claim 2Depends on #1
The WTRU of claim 1, wherein the circuitry is configured to receive one or more scheduling request (SR) configurations.
- Claim 3Depends on #2
The WTRU of claim 2, wherein the grant is based on one of the scheduling request (SR) configurations.
- Claim 4Depends on #2
The WTRU of claim 2, wherein one of the scheduling request (SR) configurations is associated to the at least one logical channel.
- Claim 5Depends on #1
The WTRU of claim 1, wherein the scheduling request (SR) is transmitted using resources associated with the at least one logical channel.
- Claim 6Depends on #1
The WTRU of claim 1, wherein the circuitry is configured to transmit the buffer status report (BSR) on the uplink resources.
- Claim 7Depends on #1
The WTRU of claim 1, wherein the configuration information further indicates a scheduling request (SR) configuration applicable for the at least one logical channel.
- Claim 8Depends on #1
The WTRU of claim 1, wherein the logical channel prioritization rules comprise criteria including one or more of: allowed subcarrier spacings associated with an uplink grant; a physical channel duration associated with the uplink grant; a type of the uplink grant; and cell information associated with the uplink grant.
Technical Overview & Description
CROSS-REFERENCE TO RELATED APPLICATIONS This application is a continuation of U.S. patent application Ser. No. 17/092,407 filed Nov. 9, 2020, which is a continuation of U.S. patent application Ser. No. 16/300,259 filed Nov. 9, 2018, which is a U.S. National Stage Application under 35 U.S.C. 371 of International Patent Application No. PCT/US2017/032409, filed May 12, 2017, and claims the benefit of U.S. Provisional Patent Application No. 62/474,940, filed on Mar. 22, 2017; U.S. Provisional Patent Application No. 62/373,251, filed on Aug. 10, 2016; and U.S. Provisional Patent Application No. 62/335,627, filed on May 12, 2016, the contents of all of which are incorporated by reference as if fully set-forth herein in their respective entirety, for all purposes. BACKGROUND Mobile communications are in continuous evolution and are already at the doorstep of their fifth incarnation — 5G. As with previous generations, new use cases largely contributed in setting the requirements for the new system. It is expected that the 5G air interface may enable improved broadband performance (IBB), industrial control and communications (ICC), vehicular applications (V2X), and/or massive machine-type communications (mMTC). Deployments of a 5G network may include stand-alone systems, and/or may include a phased approach, e.g., in combination with existing deployments and/or with existing technologies (such as LTE and/or an evolution thereof). Combinations with existing technologies may involve radio access network components and/or core network components. SUMMARY A WTRU may have traffic associated with different QoS requirements. A WTRU may have access to resources (and/or different set thereof), processing functions (and/or chains thereof) that may offer (and/or exhibit) different service characteristics from the perspective of QoS enforcement and/or guarantees. The WTRU may determine how to associate data units with such resources and/or processing functions. Flow-based processing may
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (33)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (10)
- Chen et al.,
- “
- Effective Capacity-based Delay Performance Estimators for LTE Radio Bearer QoS Provision
- ”
- , 2014 9th International Symposium on Communication Systems, Networks
- &
- Digital Sign (CSNDSP), IEEE, Manchester, 2014, pp. 105-110.
- De Coninck et al.,
- “
- Observing Real Smartphone Applications over Multipath TCP