hottub.patents
US 12,229,189 B2#3609216 Most CitedActiveUnited States (USPTO)Utility

Continuous builds of derived datasets in response to other dataset updates

0Forward Citations (#3609216 Global)
0.0/yrCitation Velocity (#3609216 Global)
0.00Citation PageRank (#3609216 Global)
25Prior Art Cited
18Claims (2 Indep. · 16 Dep.)
10Drawings / Sheets

Abstract

A data processing method comprises creating and storing a dependency graph representing at least one derived dataset and one or more raw datasets or intermediate derived datasets on which the at least one derived dataset depends; reading configuration data specifying one or more periods for one or more datasets in the dependency graph; detecting a first update to a first dataset; initiating a first build of a first intermediate derived dataset only when a then-current time is within a first period of the one or more periods or a previous build of the first intermediate derived dataset occurred earlier than a then-current time less a second period of the one or more periods; asynchronously detecting a second update to a second dataset; initiating, in response to the second update, a second build of a second intermediate derived dataset that depends on the second dataset.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 25 · Forward citations: 0.

Claims (18 — 2 Independent, 16 Dependent)

  1. Claim 1Independent Claim

    A method comprising: creating and storing a dependency graph in memory, based on which a data pipeline is maintained, the dependency graph representing at least one derived dataset and one or more raw datasets or intermediate derived datasets on which the at least one derived dataset depends; reading configuration data specifying one or more periods for one or more datasets in the dependency graph; detecting, at an unscheduled time, a first update to a first dataset among the one or more raw datasets or intermediate derived datasets on which the at least one derived dataset depends; determining, in response to the first update, that a current time is within a first period of the one or more periods from a fixed time of a day or a previous build of a first intermediate derived dataset occurred earlier than the current time less a second period of the one or more periods; initiating, in response to the determining, at or near the current time, a first build of the first intermediate derived dataset that depends on the first dataset; detecting that a frequency of updates to a dataset on which the first intermediate derived dataset depends exceeds a threshold; in response to the detecting of the threshold being exceeded, updating the configuration data to revise the first period or the second period; asynchronously detecting a second update to a second dataset among the one or more raw datasets or intermediate derived datasets on which the at least one derived dataset depends; initiating, in response to the second update, a second build of a second intermediate derived dataset that depends on the second dataset without waiting for the first update to propagate through the dependency graph; detecting and initiating continuously as other updates to other datasets are received, wherein the method is performed using one or more processors.

  2. Claim 2Depends on #1

    The method of claim 1, the configuration data specifying the one or more periods respectively for one or more different datasets.

  3. Claim 3Depends on #1

    The method of claim 1, the first period or the second period being associated with the first intermediate derived dataset.

  4. Claim 4Depends on #1

    The method of claim 1, further comprising: updating the configuration data to specify a certain period for a pipeline that recursively applies to parent datasets; setting a period for a specific dataset having multiple children to a minimum of multiple periods applied to the multiple children.

  5. Claim 5Depends on #1

    The method of claim 1, further comprising: detecting that an amount of resource used in building the first intermediate derived dataset exceeds a second threshold; in response to the detecting, updating the configuration data to specify the first period or the second period.

  6. Claim 6Depends on #1

    The method of claim 1, the first period corresponding to an amount of resource usage below a certain threshold.

  7. Claim 7Depends on #1

    The method of claim 1, further comprising: detecting that a final dependency of a third intermediate derived dataset that depends on the first intermediate derived dataset is satisfied; initiating a third build of the third intermediate derived dataset.

  8. Claim 8Depends on #1

    The method of claim 1, the configuration data further specifying branch declarations related to logical branches of a build system.

  9. Claim 9Depends on #8

    The method of claim 8, further comprising determining that the first intermediate derived dataset is not associated with a logical branch of the logical branches for which the branch declarations are specified.

  10. Claim 10Independent Claim

    A computer-readable, non-transitory storage medium storing computer-executable instructions, which when executed implement a method, the method comprising: creating and storing a dependency graph in memory, based on which a data pipeline is maintained, the dependency graph representing at least one derived dataset and one or more raw datasets or intermediate derived datasets on which the at least one derived dataset depends; reading configuration data specifying one or more periods for one or more datasets in the dependency graph; detecting, at an unscheduled time, a first update to a first dataset among the one or more raw datasets or intermediate derived datasets on which the at least one derived dataset depends; determining, in response to the first update, that a current time is within a first period of the one or more periods from a fixed time of a day or a previous build of a first intermediate derived dataset occurred earlier than the current time less a second period of the one or more periods; initiating, in response to the determining, at or near the current time, a first build of the first intermediate derived dataset that depends on the first dataset; detecting that a frequency of updates to a dataset on which the first intermediate derived dataset depends exceeds a threshold; in response to the detecting of the threshold being exceeded, updating the configuration data to revise the first period or the second period; asynchronously detecting a second update to a second dataset among the one or more raw datasets or intermediate derived datasets on which the at least one derived dataset depends; initiating, in response to the second update, a second build of a second intermediate derived dataset that depends on the second dataset without waiting for the first update to propagate through the dependency graph; detecting and initiating continuously as other updates to other datasets are received, wherein the method is performed using one or more processors.

  11. Claim 11Depends on #10

    The computer-readable, non-transitory storage medium of claim 10, the configuration data specifying the one or more periods respectively for one or more different datasets.

  12. Claim 12Depends on #10

    The computer-readable, non-transitory storage medium of claim 10, the first period or the second period being associated with the first intermediate derived dataset.

  13. Claim 13Depends on #10

    The computer-readable, non-transitory storage medium of claim 10, the method further comprising: updating the configuration data to specify a certain period for a pipeline that recursively applies to parent datasets; setting a period for a specific dataset having multiple children to a minimum of multiple periods applied to the multiple children.

  14. Claim 14Depends on #10

    The computer-readable, non-transitory storage medium of claim 10, the method further comprising: detecting that an amount of resource used in building the first intermediate derived dataset exceeds a second threshold; in response to the detecting, updating the configuration data to specify the first period or the second period.

  15. Claim 15Depends on #10

    The computer-readable, non-transitory storage medium of claim 10, the first period corresponding to an amount of resource usage below a certain threshold.

  16. Claim 16Depends on #10

    The computer-readable, non-transitory storage medium of claim 10, the method further comprising: detecting that a final dependency of a third intermediate derived dataset that depends on the first intermediate derived dataset is satisfied; initiating a third build of second the third intermediate derived dataset.

  17. Claim 17Depends on #10

    The computer-readable, non-transitory storage medium of claim 10, the configuration data further specifying branch declarations related to logical branches of a build system.

  18. Claim 18Depends on #8

    The method of claim 8, further comprising determining that the first intermediate derived dataset is not associated with a logical branch of the logical branches for which the branch declarations are specified.

Technical Overview & Description

BENEFIT CLAIM This application claims the benefit under 35 U.S.C. § 120 as a Continuation of application Ser. No. 15/963,038, filed Apr. 25, 2018, which claims the benefit under 35 U.S. C. § 119(e) of provisional application 62/589,856, filed Nov. 22, 2017, the entire contents of which are hereby incorporated by reference for all purposes as if fully set forth herein. Applicant hereby rescinds any disclaimer of claim scope in the parent applications or the prosecution history thereof and advises the USPTO that the claims in this application may be broader than any claim in the parent applications FIELD OF THE DISCLOSURE The present disclosure is in the technical field of computer-implemented distributed database systems. Another technical field is computer-implemented processing of data dependency management. More specifically, the example embodiment(s) described below relate to computer-implemented techniques for automatically continuously initiating build jobs for derived datasets in data pipelines while satisfying data dependencies. BACKGROUND The approaches described in this section are approaches that could be pursued, but not necessarily approaches that have been previously conceived or pursued. Therefore, unless otherwise indicated, it should not be assumed that any of the approaches described in this section qualify as prior art merely by virtue of their inclusion in this section. Data analysis benefits from the definition of data production pipelines that specify source datasets as input, transformations, and derived datasets as output. Multiple sets of input datasets, transformations, and derived datasets may be arranged serially or in tree or graph structures to form complex data pipelines. Such a pipeline involves data dependencies, as opposed to software or program code dependencies. Raw datasets represent data drawn from data source, such as a file system, database, or other data source. A complex dataset may be built by a data processing job on one or

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.