Machine-learning-based identification of drawing attributes
Abstract
An example computing system is configured to: (i) access a drawing associated with a construction project; (ii) identify, in the drawing, a set of candidate textual elements that potentially represent a title of the drawing; (iii) for each candidate textual element, (a) determine a respective dataset comprising values for a set of data variables that are potentially predictive of whether the candidate textual element is the title of the drawing, and (b) input the respective dataset into a machine-learning model that functions to (1) evaluate the respective dataset and (2) output, based on the evaluation, a respective score indicating a likelihood that the candidate textual element represents the title of the drawing; and (iv) based on the respective scores for the candidate textual elements that are output by the machine-learning model, select one given candidate textual element as the title of the drawing.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 0.
Claims (8)
- Claim 1Independent Claim
A computing system comprising: at least one processor; at least one non-transitory computer-readable medium; and program instructions stored on the at least one non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to: access a drawing associated with a construction project; identify a set of regions of the drawing that are likely to contain a title of the drawing, wherein the identified set of regions includes one or both of (i) a first region of the drawing extending upward from a bottom edge of the drawing by no more than a first percentage of a drawing height or (ii) a second region of the drawing extending leftward from a right edge of the drawing by no more than a second percentage of a drawing width; evaluate the identified set of regions of the drawing for textual elements and thereby identify a set of candidate textual elements that potentially represent a title of the drawing; for each candidate
- Claim 2Depends on #1
The computing system of claim 1, wherein the program instructions stored on the at least one non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to identify the set of regions of the drawing that are likely to contain a title of the drawing comprise program instructions stored on the at least one non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to: identify one or more rectangular boxes in the drawing.
- Claim 3Depends on #1
The computing system of claim 1, wherein the first percentage is 30% and the second percentage is 30%.
- Claim 4Depends on #1
The computing system of claim 1, wherein the program instructions stored on the at least one non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to determine the respective dataset comprising values for the set of data variables that are potentially predictive of whether the candidate textual element is the title of the drawing comprise program instructions stored on the at least one non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to: determine (i) one or more spatial characteristics of the candidate textual element, (ii) one or more linguistic characteristics of the candidate textual element, and (iii) one or more surrounding characteristics of the candidate textual element; and determine the respective dataset based on (i) the one or more spatial characteristics of the candidate textual element, (ii) the one or more
- Claim 5Depends on #4
The computing system of claim 4, wherein the one or more spatial characteristics of the candidate textual element comprises at least one of (i) a distance between the candidate textual element and an edge of the drawing, (ii) a location of the textual element within the drawing, (iii) an orientation of the candidate textual element, or (iv) a size of the candidate textual element.
- Claim 6Depends on #4
The computing system of claim 4, wherein the one or more linguistic characteristics of the candidate textual element comprises at least one of (i) one or more words in the candidate textual element, (ii) one or more parts of speech of the one or more words in the candidate textual element, (iii) information identifying whether the candidate textual element includes a word in a first predefined list of words, (iv) information identifying whether the textual element includes a capitalized character, or (v) information identifying whether the textual element includes a numerical character.
- Claim 7Depends on #4
The computing system of claim 4, wherein the one or more surrounding characteristics of the candidate textual element comprises at least one of (i) information identifying whether the candidate textual element is located within a rectangular box, (ii) information identifying whether one or more other textual elements are within a threshold distance of the candidate textual element, or (iii) information identifying whether the one or more other textual elements within the threshold distance of the candidate textual element include a word in a second predefined list of words.
- Claim 8Independent Claim
A non-transitory computer-readable medium, wherein the non-transitory computer-readable medium is provisioned with program instructions that, when executed by at least one processor, cause a computing system to: access a drawing associated with a construction project; identify a set of regions of the drawing that are likely to contain a title of the drawing, wherein the identified set of regions includes one or both of (i) a first region of the drawing extending upward from a bottom edge of the drawing by no more than a first percentage of a drawing height or (ii) a second region of the drawing extending leftward from a right edge of the drawing by no more than a second percentage of a drawing width; evaluate the identified set of regions of the drawing for textual elements and thereby identify a set of candidate textual elements that potentially represent a title of the drawing; for each candidate textual element in the set of candidate textual elements, (i) determine a respective dat
Technical Overview & Description
BACKGROUND Construction projects are often complex endeavors involving the coordination of many professionals across several discrete phases. Typically, a construction project commences with a design phase, where architects design the overall shape and layout of a construction project, such as a building. Next, engineers engage in a planning phase where they take the architects' designs and produce engineering drawings and plans for the construction of the project. At this stage, engineers may also design various portions of the project's infrastructure, such as HVAC, plumbing, electrical, etc., and produce plans reflecting these designs as well. After, or perhaps in conjunction with, the planning phase, contractors may engage in a logistics phase to review these plans and begin to allocate various resources to the project, including determining what materials to purchase, scheduling delivery, and developing a plan for carrying out the actual construction of the project. Finally, during the construction phase, construction professionals begin to construct the project based on the finalized plans. OVERVIEW As noted above, one aspect of managing a construction project involves the creation, review, and sometimes revision, of plans for the construction project. In most cases, these plans comprise visual representations of the construction project that visually communicate information about the construction project, such as how to assemble or construct the project. Such visual representations may take any of various forms. For instance, as one possibility, a plan for a construction project may take the form of a technical drawing, such as an architectural drawing or a construction blueprint, in which two-dimensional (2D) line segments of the drawing represent certain physical elements of the construction project like walls and ducts (among various other possibilities). In this respect, a technical drawing could be embodied either in paper form or in a computerized form,
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (5)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (10)
- Abioye, Sofiat O. et al.,
- “
- Artificial Intelligence in the Construction Industry: A Review of Present Status, Opportunities and Future Challenges
- ”
- , Journal of Building Engineering, vol. 44, Oct. 5, 2021, 13 pages.
- Budhiraja, Sahib Singh et al.,
- “
- A Supervised Learning Approach for Heading Detection
- ”
- , arXiv: 1809.01477v1 [cs.IR], Aug. 31, 2018, 19 pages.