hottub.patents
US 12,200,718 B2#3633270 Most CitedActiveUnited States (USPTO)Utility

Techniques for scheduling communication resources

0Forward Citations (#3633270 Global)
0.0/yrCitation Velocity (#3633270 Global)
0.00Citation PageRank (#3633270 Global)
11Prior Art Cited
8Structured Claims
0Drawings / Sheets

Abstract

Techniques for wireless communications are described. Control information used to preschedule communication resources may be received and communications may be performed based on the control information using a prescheduling technique. A scheduling type used for the control information may be determined using configuration information, an indication included in the control information, or both. A wireless device that is prescheduled communication resources may not start or not restart an inactivity timer based on the received control information. Also, a wireless device that is prescheduled communication resources may not start a retransmission timer based on the received control information. Additionally, a wireless device that is prescheduled communication resources may also refrain from transmitting a scheduling request based on a duration until a next instance of prescheduled communication resources is expected to occur.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 0.

Claims (8)

  1. Claim 1Independent Claim

    A method for wireless communications at a user equipment (UE), comprising: receiving one or more messages including a first scheduling grant corresponding to a semi-static scheduling type or a dynamic scheduling type; initiating an inactivity timer, a retransmission timer, or both, in response to receiving the first scheduling grant; receiving downlink control information in a downlink control information message that preschedules a set of uplink resources for the UE prior to the UE requesting uplink resources; refraining, in response to the downlink control information prescheduling the set of uplink resources for the UE in accordance with a prescheduling type, from restarting the inactivity timer, the retransmission timer, or both, wherein an expiration of the inactivity timer, the retransmission timer, or both, is determined relative to the initiation of the inactivity timer, the retransmission timer, or both, in response to reception of the first scheduling grant; and communicating

  2. Claim 2Depends on #1

    The method of claim 1, further comprising: decoding the downlink control information message; and determining that the prescheduling type is associated with the downlink control information based at least in part on an indicator included in the decoded downlink control information message.

  3. Claim 3Depends on #1

    The method of claim 1, further comprising: identifying an index of a slot, symbol, or resource blocks used for a control channel or a shared channel in which the downlink control information message is received or an uplink transmission scheduled by the downlink control information message is performed; and determining that the prescheduling type is associated with the downlink control information message based at least in part on the index of the slot, the symbol, or the resource blocks.

  4. Claim 4Depends on #1

    The method of claim 1, further comprising: receiving radio resource control information that indicates a configuration for the prescheduling type, the configuration comprising a periodicity, offset, a frequency position, or any combination thereof for receiving control information that is associated with the prescheduling type; and determining that the prescheduling type is associated with the downlink control information message based at least in part on the configuration and a position of the downlink control information message in a control channel or a position of a shared channel.

  5. Claim 5Depends on #1

    The method of claim 1, further comprising: determining a scheduling type of the downlink control information or an uplink transmission; and determining, based at least in part on the determined scheduling type, whether to start the inactivity timer.

  6. Claim 6Depends on #1

    The method of claim 1, further comprising: identifying a discontinuous reception on interval; determining that the downlink control information is received in a first portion of the discontinuous reception on interval; and refraining from starting or restarting the inactivity timer based at least in part on receiving the downlink control information in the first portion of the discontinuous reception on interval.

  7. Claim 7Depends on #1

    The method of claim 1, further comprising: identifying a discontinuous reception on interval; determining that the downlink control information is received in a second portion of the discontinuous reception on interval; and starting or restarting the inactivity timer based at least in part on receiving the downlink control information in the second portion of the discontinuous reception on interval.

  8. Claim 8Depends on #1

    The method of claim 1, further comprising: refraining from starting the retransmission timer after receiving the downlink control information based at least in part on an indicator included in the downlink control information.

Technical Overview & Description

CROSS-REFERENCES The present Application for Patent claims the benefit of U.S. Provisional Patent Application No. 63/093,065 by Meyland et al., entitled “ TECHNIQUES FOR SCHEDULING COMMUNICATION RESOURCES, ” filed Oct. 16, 2020, assigned to the assignee hereof, and which is hereby incorporated by reference in its entirety. FIELD OF DISCLOSURE The following relates to wireless communications, including techniques for scheduling communication resources. BACKGROUND Wireless communications systems are widely deployed to provide various types of communication content such as voice, video, packet data, messaging, broadcast, and so on. These systems may be capable of supporting communication with multiple users by sharing the available system resources (e.g., time, frequency, and power). Examples of such multiple-access systems include fourth generation (4G) systems such as Long-Term Evolution (LTE) systems, LTE-Advanced (LTE-A) systems, or LTE-A Pro systems, and fifth generation (5G) systems which may be referred to as New Radio (NR) systems. These systems may employ technologies such as code division multiple access (CDMA), time division multiple access (TDMA), frequency division multiple access (FDMA), orthogonal frequency division multiple access (OFDMA), or discrete Fourier transform spread orthogonal frequency division multiplexing (DFT-S-OFDM). A wireless multiple-access communications system may include one or more base stations or one or more network access nodes, each simultaneously supporting communication for multiple communication devices, which may be otherwise known as user equipment (UE). A base station may schedule communication resources (e.g., downlink or uplink resources) for a UE. The base station may indicate to the UE a set of communication resources that have been scheduled for the UE, and the base station and the UE may communicate with one another over the scheduled communication resources. SUMMARY Techniques that support techniques for scheduling

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (11)

PatentTitleYearCitations

Non-Patent Literature (7)

  • International Search Report and Written Opinion
  • —
  • PCT/US2021/055162
  • —
  • ISA/EPO
  • —
  • Mar. 2, 2022.