Beam adjustment/cancellation rules for non-compatible UL/DL beams
Abstract
A wireless device, such as a user equipment (UE), may receive first scheduling information with first resources for periodic transmissions with a first beam based on a half-duplex mode. The wireless device may receive second scheduling information for second resources associated with a second beam that is incompatible with the first beam for full duplex communication including downlink reception and uplink transmission that overlaps in time. The wireless device may adjust communication in response to the first beam being incompatible with the second beam for the full duplex communication.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 0.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of wireless communication at a user equipment (UE), comprising: receiving first scheduling information with first resources for transmissions with a first beam based on a half-duplex mode, wherein the first beam is selected based on a first metric for the half-duplex mode; receiving second scheduling information for second resources associated with a second beam, wherein the second beam is selected based on a second metric for a full-duplex mode, and the second beam is incompatible with the first beam for full duplex communication including downlink reception and uplink transmission t
- Claim 2Depends on #1
The method of claim 1 , wherein the second beam is selected to be paired with
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (24)
Non-Patent Literature (3)
- International Search Report and Written Opinion—PCT/US2021/061674—ISA/EPO—dated Mar. 25, 2022.
- Lenovo, et al., “Discussion of Multi-Beam Operation”, Draft, 3GPP TSG RAN WG1 Meeting #97, R1-1908721, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre, 650, Route Des Lucioles, F-06921 Sophia-Antipolls Cedex, France, vol. RAN WG1, No. Reno, USA, May 13, 2019-May 17, 2019, Aug. 17
- Nokia, et al., “Enhancements on Multi-Beam Operation”, Draft, R1-1900692, 3GPP TSG RAN WG1 Meeting #AH-1901, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre, 650, Route Des Lucioles, F-06921, Sophia-Antipolis Cedex, France, vol. RAN WG1, No. Taipei, Taiwan, Jan. 21, 2019-Jan. 25,