Method of use of flange connectors for double tee beams
Abstract
A connector for joining concrete structures such as double tee beams to one another. The connector includes a curved bolt that is formed with a shape memory alloy. Through utilization of the bolt, a joint can be post-tensioned following assembly through application of heat to the joint. Post-tensioning can be reapplied following loosening of the joint through application of heat. When considering a super elastic shape memory alloy, the bolt can be a smart bolt that can self-correct following deformation due to excessive load.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for forming a joint between a first reinforced concrete slab and a second reinforced concrete slab, comprising: retaining a first portion of a pre-strained bolt within a first duct located within the first concrete slab, the pre-strained bolt comprising a shape memory alloy and defining a curvature between a first end of the bolt and a second end of the bolt, wherein upon retaining the first portion of the pre-strained bolt within the first duct, a first end of the pre-strained bolt is accessible at an opening in a surface of the first concrete slab; retaining a second portion of the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (24)
Non-Patent Literature (5)
- ACI. “ACI 318-14 Building Code Requirements for Structural Concrete and Commentary” Am. Conc. Inst. Committee (2014) pp. 1-524.
- Amado, et al. “Design and Testing of S-31 Bridge Replacement Project using Rapid Construction Method” PCI Conv. Nat'l Bridge Conf. (2013).
- Anay, R. “Design of Beam-Column using Artificial Neural Network” Eng. Techn. J. (2012).
- El Batanouny, et al. “Condition Assessment of Prestressed Concrete Beams using Cyclic and Monotonic Load Tests” ACI Struct. J. 111 (2014) pp. 1-10.
- Gleich, et al. “PCI Committed Report: Joints in Precast Parking Structures” PCI J. (2007) pp. 124-139.