Patents
US 11,566,382 B2#137959567 Most CitedActiveUnited States (USPTO)Utility

Procedure for controlling a guide system of a railway construction machine, associated method and associated guide system

0Forward Citations (#137959567 Global)
0.0/yrCitation Velocity (#137959567 Global)
0.56Citation PageRank (#137959567 Global)
27Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

In order to control a measuring system with a tacheometer mounted on a carrier trolley circulating on a railway track under construction and a target fastened to a railway construction machine, the carrier trolley is circulated on the railway track in a working direction from a starting position to an arrival position in the vicinity of a topographic arrival singularity. The carrier trolley is immobilized and an observation of the topographic arrival singularity is made. Then, with the railway construction machine having been brought into the starting position, an observation of the target is made. Finally, the coordinates of the arrival position of the carrier trolley are calculated as a function of the measurements made, of additional data relating to the starting position, and of positioning data of the topographic arrival singularity and data relating to a theoretical line of the track.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for operating a measurement system having a tacheometer mounted on a trolley movable on a railroad track undergoing work, a target mounted on a railroad works machine, a set of data on a theoretical line of the railroad track, and a set of data on positions of noteworthy topographic singularities, the method comprising: moving the trolley on the railroad track independently from the railroad works machine in a working direction from a starting position to an arrival position in proximity to a topographic singularity of arrival indexed in the set of data on positions of noteworthy topo

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (27)

PatentTitleYearCitations
FR 2,655,417 A1Procede et dispositif de mesure des coordonnees d'un point de leve.—3
FR 2,677,679 A1Procede et machine pour la correction de position d'une voie ferree posee sur une couche de support.—4
GB 2,257,189 AA method and machine for correcting the position of a railway track resting on a support bed—4
US 5,204,731 AMethod and apparatus for measuring the coordinates of a surveyed point199330
EP 0,605,848 A1Traffic control system utilizing on-board vehicle information measurement apparatus—43
JP H10266107 AAutomatic tamping method and device of multiple tie-tamper—14
US 2002166248 A1Method and apparatus for track geometry measurement—24
JP 2003072553 ARailroad facilities information input device—4
US 2003097235 A1Method of surveying a track—18
EP 1,418,273 A1Method of tamping railway tracks—17
JP 2006131219 AVehicle position display device—9
US 2007213926 A1Method For Measuring Tracks—17
US 2008033605 A1System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks—65
CA 2,431,070 CTransportation vehicles and methods20082
WO 2009/015728 A1Method for measuring a track position—3
US 7,979,995 B2Method of measuring a track position201111
US 2012240809 A1Automatic machine for leveling and alignment of railway in plate, prior to the concrete—10
RU 2,551,637 C2Device to straighten railway track and method to straighten railway track20152
US 2015345943 A1Track reference targets and method of using same to define left and right top-of-rail elevations—4
GB 2,536,746 ARailroad track survey system—8
FR 3,037,085 A1Dispositif de mesure du nivellement ou du dressage d'une voie ferree—2
US 2017368413 A1Training system and methods for designing, monitoring and providing feedback of training—172
AT 519,263 A4Gleismessfahrzeug und Verfahren zum Erfassen einer Gleisgeometrie eines Gleises—6
US 2018273060 A1Track geometry measurement system with inertial measurement—14
JP 2019074428 AMeasurement device and method of construction limit in railway—4
WO 2019/154720 A1Method for controlling an assembly consisting of one or more intervention tools mounted on an intervention rail vehicle—2
FR 3,110,534 A1Procédé de calcul d’un vecteur de vitesse instantanée d’un véhicule ferroviaire, système correspondant—2