Hydraulic fracturing plan and execution of same
Abstract
A hydraulic fracturing plan executable by a hydraulic fracturing system to hydraulically fracture a plurality of oil and gas wells. In one or more embodiments, the execution of the hydraulic fracturing plan implements the following steps: communicating fluid to a first well via a manifold and a first valve, the first valve being associated with both the manifold and the first well; and, in response to determining that the fluid communicated via the manifold has satisfied one or more conditions: opening a second valve; communicating fluid to a second well via the second valve; and closing the first valve after opening the second valve.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 9.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method, comprising: communicating fluid to a first well via a manifold and a first valve, the first valve being associated with both the manifold and the first well; and in response to determining that the fluid communicated via the manifold has satisfied one or more conditions: opening a second valve; communicating fluid to a second well via the second valve; and closing the first valve after opening the second valve.
- Claim 2Depends on #1
The method of claim 1 , further comprising: communicating fluid to a third well via the manifold and a third valve, the third valve being associated with both the manifold and the third well; and in response to determining that the fluid communicated via the manifold has satisfied the one or more conditions: opening a fourth valve; communicating fluid to a fourth well via the fourth valve; and
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗