Imagery-based construction progress tracking
Abstract
A method is provided. The method includes one or more of receiving, by an image processing device, one or more images from an image capture device. The one or more images are each associated with metadata that includes a common direction. For each of the one or more images, the method further includes adding one or more pairs of parallel lines, converting each of the one or more pairs of parallel lines into intersection coordinates with 2D drawing elements, and calculating construction progress from the intersection coordinates. The 2D drawing includes a 2D floor plan or a 2D elevation plan, and each pair of parallel lines designates one of the start or end of construction during a current period of time.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 41 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: receiving, by an image processing device, one or more images from an image capture device, the one or more images each associated with metadata comprising a common direction, and for each of the one or more images: adding one or more pairs of parallel lines, each pair of parallel lines designating one of the start or end of construction during a current period of time; converting each of the one or more pairs of parallel lines into intersection coordinates with 2D drawing elements, the 2D drawing comprising a 2D floor plan or a 2D elevation plan; and calculating constructi
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2022284366 A1 | Method and system for managing a crane and/or construction site | — | 7 |