Monitoring construction of a structure
Abstract
Methods, apparatuses, and embodiments related to a technique for monitoring construction of a structure. In an example, a robot with a sensor, such as a LIDAR device, enters a building and obtains sensor readings of the building. The sensor data is analyzed and components related to the building are identified. The components are mapped to corresponding components of an architect's three dimensional design of the building, and the installation of the components is checked for accuracy. When a discrepancy above a certain threshold is detected, an error is flagged and project managers are notified. Construction progress updates do not give credit for completed construction that includes an error, resulting in improved accuracy progress updates and corresponding improved accuracy for project schedule and cost estimates.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for monitoring construction of a building, the method comprising: receiving, by a computer system, training data that includes three dimensional training point data that corresponds to a plurality of objects associated with a training building and that includes image data that corresponds to a plurality of images of the objects associated with the training building, wherein each point of the three dimensional training point data represents a three dimensional coordinate that corresponds to a surface point of one of the objects associated with the training building, and wherein the tra
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (4)
Non-Patent Literature (5)
- Burak Anil et al. (“Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data”). (Year: 2013).
- Chi et al. (“Automated Object Identification Using Optical Video Cameras on Construction Sites”) (Year: 2011).
- Fard et al. (“Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs”). (Year: 2009).
- Ibrahim et al. (“Two Approaches to BIM: A Comparative Study”) (Year: 2004).
- Kim et al. (“Automated construction progress measurement using a 4D building information model and 3D data”) (Year: 2012).