Spatiotemporal lane maneuver delay for road navigation
Abstract
System and methods are provided for calculating a lane maneuver delay for different lane maneuvers and different road segments at different times of the day to generate a predicted lane maneuver delay for use in routing and navigation services. A lane-level map-matcher identifies the lane a vehicle is driving on using positional sensors. Sensor data is obtained from vehicle sensors using the left-turn and right-turn signal lights sensor. A lane maneuver delay value is calculated from the time period a left-turn or right-turn signaling light was kept on before a vehicle completed a lane maneuver. The lane maneuver delay values are aggregated to generate a predicted lane maneuver delay that may be used in lane level routing instructions.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 44 · Forward citations: 0.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for calculating a lane maneuver delay, the method comprising: identifying, using a lane-level map-matcher, a first lane that a vehicle is driving on; calculating a lane maneuver delay value for a time that it takes the vehicle to perform one or more actions for a lane maneuver from the first lane to a second lane; aggregating the lane maneuver delay value with other lane maneuver delay values for similar lane maneuvers; and generating lane level routing instructions based on the aggregated lane maneuver delay value.
- Claim 2Depends on #1
The method of claim 1 , wherein calculating the lane maneuver delay value comprises: obtaining sensor data from signal lights sensors on the vehicle; and calculating the time from an initial detection of a turn signal of the vehicle to a subsequent detection that the turn signal is off.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (44)
Non-Patent Literature (2)
- Gurupackiam, Saravanan, and Steven Lee Jones Jr. “Empirical Study of Accepted Gap and Lane Change Duration Within Arterial Traffic Under Recurrent and Non-Recurrent Congestion.” International Journal for Traffic & Transport Engineering 2.4 (2012).
- Toledo, Tomer, and David Zohar. “Modeling duration of lane changes.” Transporlalion Research Record: Journal of the Transportation Research Board 1999 (2007): 71-78.