Integrated system and method for automated monitoring and control of sand-prone well
Abstract
Measurement data including data of a sand production rate from a sand metering sensor, pressure data from a pressure sensor, and data of a metal loss value from a metal loss sensor is obtained. A maximum sand erosional velocity ratio and a pressure drawdown are determined. An optimum choke valve setting is determined based on a predefined correlation between the sand production rate, the pressure drawdown, and the maximum sand erosional velocity ratio, in response to determining that the maximum sand erosional velocity ratio is not within a predetermined maximum sand erosional velocity ratio limit. An updated pressure drawdown produced by the determined optimum choke valve setting is within a predetermined pressure drawdown operating window. The surface choke valve is set based on the determined optimum choke valve setting. The well is shutdown by triggering an emergency shutdown device in response to determining that the obtained metal loss value has reached a predefined metal loss limit value.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 32 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for monitoring and controlling operations of a well, the method comprising: obtaining measurement data from each of a plurality of sensors, the measurement data including data of a sand production rate from a sand metering sensor, pressure data from at least one pressure sensor, and data of a metal loss value from at least one metal loss sensor; determining a maximum sand erosional velocity ratio and a pressure drawdown based on the obtained measurement data; determining whether the maximum sand erosional velocity ratio is within a predetermined maximum sand erosional velocity ratio l
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
References Cited — Backward Prior Art (32)
Non-Patent Literature (5)
- C. Hank Rawlings, “Sand Management Methodologies for Sustained Facilities Operations”, SPE-164645, 2013, 10 pages.
- Hamza N., et al., “A New Concept of Sand Management Philosophy; Revolutionary & Cost Effective Solution”, pp. 1-10, dated Oct. 17, 2017, XP055915153.
- International Search Report and Written Opinion for PCT Application No. PCT/US2022/014553 dated May 18, 2022.
- Rabeea et al., “Flow assurance study of gathering pipeline system at a gas condensate field”, Jun. 2018, Gas Processing * LNG, 8 pages (Year: 2018).
- Saether, “Choke Condition and Performance Monitoring”, M.Sc.Thesis, NTNU, Jun. 14, 2020, 105 pages.