Patents
US 11,409,274 B2#78854897 Most CitedActiveUnited States (USPTO)Utility

Model predictive maintenance system for performing maintenance as soon as economically viable

0Forward Citations (#78854897 Global)
0.0/yrCitation Velocity (#78854897 Global)
0.56Citation PageRank (#78854897 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A model predictive maintenance system for building equipment that performs operations including obtaining an objective function defining a cost of operating and performing maintenance on the equipment as a function of operating and maintenance decisions for time steps within a time period of a life cycle horizon and including performing a first computation of the objective function under a first scenario where maintenance is performed on the equipment during the period, a result of the first computation indicating a first cost. The operations include performing a second computation under a second scenario in which maintenance is not performed during the period, a result indicating a second cost. The operations include initiating an automated action to perform maintenance on the equipment in accordance with decisions defined by the first scenario if the first cost is less than or equal to the second cost.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A model predictive maintenance system for building equipment, the system comprising: one or more processing circuits comprising one or more processors and memory storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising: obtaining an objective function that defines a cost of operating the building equipment and performing maintenance on the building equipment as a function of operating decisions and maintenance decisions for the building equipment for a plurality of time steps within a time period; performing itera

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 5,216,612 AIntelligent computer integrated maintenance system and method1993524
US 5,630,070 AOptimization of manufacturing resource planning1997578
JP 2001357112 AFacility management system—32
US 2002072988 A1Supply management system—219
JP 2003141178 ABuilding design support method, system and program—38
US 2003158803 A1System and method for estimation of asset lifetimes—48
US 2004049295 A1Constraint and limit feasibility handling in a process control system optimizer—125
US 2004054564 A1Systems and methods for the optimization of resources in energy markets—170
CA 2,499,695 A1Part ordering amount calculation device—10
US 2005091004 A1System and method for condition assessment and end-of-life prediction—34
JP 2005148955 APlant maintenance plan generation system and method—15
JP 2005182465 AMaintenance support method and program—76
US 7,062,361 B1Method and apparatus for controlling power consumption2006121
US 7,124,059 B2Managing maintenance for an item of equipment200681
US 2007005191 A1Real-time global optimization of building setpoints and sequence of operation—112
US 2007203860 A1Energy budget manager—267
US 7,457,762 B2Optimization of management of maintenance, repair and overhaul of equipment in a specified time window200866
US 7,464,046 B2Dispatch and service support system200851
US 2009204267 A1System and method for dynamic multi-objective optimization of machine selection, integration and utilization—181
US 2009210081 A1System and method for dynamic multi-objective optimization of machine selection, integration and utilization—148
US 2009240381 A1Method and apparatus for controlling power consumption—162
US 2009313083 A1Renewable energy calculator—56
US 2009319090 A1Energy optimization system—172
US 7,693,735 B2Dynamic schedule mediation201047
JP 2010078447 AQ value analysis system, q value analysis method, and q value analysis program—29
US 2010241285 A1Technique for aggregating loads with time-varying operating cycles—51
US 2011018502 A1Electricity supply apparatus of an industrial site—38
US 2011035328 A1Methods, apparatus, and systems for generating technician checklists for locate and/or marking operations—23
US 2011093310 A1Computer-readable, non-transitory medium storing a system operations management supporting program, system operations management supporting method, and system operations management supporting apparatus—16
US 2011130857 A1Method and apparatus for optimizing a performance index of a bulk product blending and packaging plant—59