Coordinating concrete delivery and placement
Abstract
Described are a method and system for coordinating the delivery and placement of concrete loads at a job site, and more particularly to adjusting a set time value or value range of the concrete loads, thereby to facilitate finishing or other concrete placement activities. In exemplary embodiments, the adjustments can be made based on an assessment of previously placed concrete loads. The set time values or value ranges of the concrete can be monitored and adjusted to achieve desired properties during installation and/or in its hardened state.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for coordinating delivery of concrete loads from batch plant to job site, comprising: (A) providing at least three delivery trucks, each having a mixer drum containing a concrete load and a processor-controlled system on board the concrete delivery truck for monitoring a rheology property chosen from slump, slump flow, and yield stress of the concrete load contained in the delivery truck mixer drum and at least one set time value or value range relative to the concrete load contained in the delivery truck mixer drum, the processor-controlled system on board the concrete delivery truck
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Jain et al, Machine Vision, pp. 234-248.
- Solomon, C. and Breckon, T., Fundamentals of Digital Image Processing: A Practical Approach with Examples in Matlab, pp. 235-259.
- TREMCO Roofing and Building Maintenance—SkyBEAM™, 4 pages, 2016.
- VOrb IoT for Concrete. Speed up., 1 page.
- Young, Form PCT/ISA/220, International Search Report for PCT/US2020/043920, dated Oct. 20, 2020, 2 pages.