Abstract

A method for operating an electrical power grid, which includes an electrical power grid, a plurality of power generation participants providing electrical power to the electrical power grid, a plurality of consumers drawing electrical power from the electrical power grid, and a controller that administers the market for the power generation participants and the consumers on the electrical power grid. The method may include providing, by the controller, a short-term reserve (STR) product for the consumers. The STR may be provided by the power generation participants through online resources and offline resources. And the controller may share a ramp capability product (RCP) capacity and a resource capacity.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method for operating an electrical power grid, the electrical power grid including a plurality of power generation participants providing electrical power to the electrical power grid, a plurality of consumers drawing electrical power from the electrical power grid, and a controller that administers the market for the power generation participants and the consumers on the electrical power grid, the method including: providing a short-term reserve (STR) product for the consumers, by the power generation participants by deploying online STR resources as energy and by deplo

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (15)

PatentTitleYearCitations
US 2010332373 A1System and method for participation in energy-related markets—519
WO 2012/106431 A1System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management—8
WO 2013/063581 A1Managing energy assets associated with transport operations—9
US 2014018969 A1Method and Apparatus for Actively Managing Electric Power Supply for an Electric Power Grid—234
US 8,855,279 B2Apparatus and method for controlling communications to and from utility service points20147
US 2014336840 A1Method and system for performance management of an energy storage device—20
US 2015184550 A1Methods and systems for enhancing control of power plant generating units—54
US 2015278968 A1Facilitating revenue generation from data shifting by data centers—64
US 2016098794 A1Next-Generation Energy Market Design and Implementation—39
US 2017358041 A1Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform—291
US 2018366978 A1Intelligent grid operating system to manage distributed energy resources in a grid network—43
US 2019139159 A1Energy opportunity optimization system—20
US 10,509,374 B2Systems and methods for managing power generation and storage resources20192
US 2020176986 A1Systems And Methods For Managing Energy Storing Resources Of An Electrical Power Grid—9
US 2020258168 A1Systems And Methods For Managing Watchlist Constraints On An Electric Power Grid—8

Non-Patent Literature (5)

  • “Business Practices Manuals”; https://www.misoenergy.org/legal/business-practice-manuals; Midcontinent Independent System Operator, Inc.; © 2010-2020; accessed Feb. 18, 2020; 3 pages.
  • “Development Additional Short-term Capacity Reserve Requirements”; Market Roadmap ID: 10; Issue ID: MR010; Apr. 2016; MISO; 9 pages.
  • “Short Term Capacity Reserve—Evaluation”; Mar. 2018; MISO; 35 pages.
  • “Short Term Reserve (STR)”; Market Roadmap ID: 10; Issue ID: MR010; Nov. 2018; MISO; 19 pages.
  • “Short-Term Capacity Reserves”; Market Roadmap ID: MR010; Dec. 2017; MISO; 13 pages.