Method for operating a wind power facility
Abstract
A method for preparing a wind power facility for a transition from a first mode of operation to a second mode of operation includes the steps of specifying a set of operational parameters to be applied by the wind power facility in connection with the second mode of operation, said specified set of operational parameters being available for the wind power facility in response to a provided transition triggering signal, and providing the transition triggering signal and applying the specified set of operational parameters in the wind power facility in response thereto, wherein a subset of the specified set of operational parameters is applied in each of a plurality of wind turbine generators in response to the provided transition triggering signal. The first mode of operation may involve a normal mode of operation whereas the second mode of operation may involve an island mode of operation.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for preparing a wind power facility for a transition from a normal mode of operation to an island mode of operation, the wind power facility comprising a plurality of wind turbine generators, the method comprising: operating the plurality of wind turbine generators according to a first set of operational parameters for the normal mode of operation to provide power to an external power grid connected to the wind power facility; determining, based on a predetermined transition plan, a second set of operational parameters to be applied by the wind power facility in connection with the is
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 12,220,830 B2 | Method and apparatus for automated stripping of waste from a cut substrate | 2025 | 0 |
References Cited — Backward Prior Art (24)
Non-Patent Literature (5)
- Danish Search Report for Application PA 2017 70759 dated Mar. 22, 2018.
- European Patent Office, Communication pursuant to Article 94(3) EPC for Application 18782884.3 dated Oct. 21, 2021.
- KWOK CHEUNG ; XING WANG ; BUT-CHUNG CHIU ; YING XIAO ; R. RIOS-ZALAPA: "Generation dispatch in a smart grid environment", INNOVATIVE SMART GRID TECHNOLOGIES (ISGT), 2010, IEEE, PISCATAWAY, NJ, USA, 19 January 2010 (2010-01-19), Piscataway, NJ, USA , pages 1 - 6, XP031650385, ISBN: 978-1-4244-6264-3
- Kwok Cheung et al, “Generation dispatch in a smart grid environment”, Innovative Smart Grid Technologies (ISGT), 2010, IEEE, Piscataway, NJ, USA, Jan. 19, 2010 (Jan. 19, 2010), pp. 1-6, XP031650385.
- PCT Written Opinion of the International Searching Authority for Application No. PCT/DK2018/050244 dated Mar. 22, 2018.