Patents
US 11,263,025 B2#61892385 Most CitedActiveUnited States (USPTO)Utility

Proactively performing tasks based on estimating hardware reconfiguration times

1Forward Citations (#61892385 Global)
0.2/yrCitation Velocity (#30200945 Global)
0.74Citation PageRank (#61892385 Global)
20Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

Proactively performing tasks based on estimating hardware reconfiguration times. A determination is made, prior to performing one or more reconfiguration actions to reconfigure a configuration of the computing environment, at least one estimated reconfiguration time to perform the one or more reconfiguration actions. At least one reconfiguration action of the one or more reconfiguration actions is performed, and one or more tasks are initiated prior to completing the one or more reconfiguration actions. The initiating is based on the at least one estimated reconfiguration time.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 1.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A computer program product for facilitating processing within a computing environment, the computer program product comprising: at least one computer readable storage medium readable by at least one processing circuit and storing instructions for performing a method comprising: determining, prior to performing one or more reconfiguration actions to reconfigure a configuration of the computing environment, at least one estimated reconfiguration time to perform the one or more reconfiguration actions; performing at least one reconfiguration action of the one or more reconfiguration actions; and

  2. Claim 2Depends on #1

    The computer program product of claim 1 , wherein the m

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (20)

PatentTitleYearCitations
US 6,256,773 B1System, method and article of manufacture for configuration management in a development architecture framework2001873
US 2001049769 A1Cache memory control device for multi-procesor system—14
CN 1,366,783 ASoftware reconfiguration of communication apparatus—7
US 6,874,108 B1Fault tolerant operation of reconfigurable devices utilizing an adjustable system clock200534
US 2008268840 A1Apparatus and Method for Controlling a Radio Bearer Reconfiguration—14
US 2009037553 A1Configuring or Reconfiguring a Multi-Master Information Sharing Environment—38
US 2009037442 A1Reconfiguring Propagation Streams in Distributed Information Sharing—4
US 2009158293 A1Information processing apparatus—36
US 8,430,299 B2Progress bar with multiple portions20134
US 8,688,488 B2Method and apparatus for the prediction of order turnaround time in an information verification system20141
US 2015113131 A1Scheduling A Service Event In A Network—9
EP 2,996,075 A1Method for integrated modeling of a product portfolio—5
US 2018107511 A1Information processing apparatus, information processing method, and non-transitory computer-readable recording medium—4
CN 108,207,114 ATechniques for Reconfiguring Virtual Machines—6
US 10,289,453 B1Allocating computing resources201914
CN 110,063,051 AReconfigurable server—11
US 10,389,453 B2Multiplexed RFAGC for frequency diversity receivers20191
CN 110,390,345 AA kind of big data cluster adaptive resource dispatching method based on cloud platform—29
US 2020034188 A1Automated predictions for not-yet-completed jobs—4
US 10,915,361 B1Dynamic capacity buffers20212

Non-Patent Literature (5)

  • Abella, Juame et al., “Measurement-Based Worst-Case Execution Time Estimation Using the Coefficient of Variation,” ACM Transactions on Design Automation of Electronic Systems, vol. 22, No. 4, Article 72, Jun. 2017, pp. 72-72:29.
  • Frantzen, Marcus et al., “A Simulation-Based Scheduling System for Real-Time Optimization and Decision Making Support,” Robotics and Computer-Integrating Manufacturing, Feb. 2011, pp. 696-705.
  • Goren, Selcuk et al., “Taking Advantage of a Diverse Set of Efficient Production Schedules: A Two-Step Approach for Scheduling with Side Concerns,” Computers and Operations Reasearch, Mar. 2013, pp. 1979-1990.
  • Gummadi, Krishna et al., “King: Estimating Latency Between Arbitrary Internet End Hosts,” IMW '02: Proceedings of the 2nd ACM SIGCOMM Workshop on Internet Measurement, Nov. 2002, pp. 1-14.
  • Hansen, Jeffrey et al., “Statistical-Based WCET Estimation and Validation,” 9th International Workshop on Worst-Case Execution Time (WCET) Analysis, Jul. 2009, pp. 1-11.