Methods and systems for regenerating a particulate filter
Abstract
Systems and methods for improving regeneration of a particulate filter located in an exhaust system of a vehicle are presented. In one example, the particulate filter is regenerated when the vehicle is expected to operate in a stationary electric power generating mode where the vehicle supplies electric power to off-board electric power consumers.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 0.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of operating a vehicle, comprising: regenerating a particulate filter including operating an engine with a lean air-fuel ratio and retarded spark timing via a controller when a transmission shifter is locked in a park position, the transmission shifter locked in the park position when the vehicle is operating in a stationary electrical power generating mode, and operating the engine with a stoichiometric air-fuel ratio when the particulate filter is not being regenerated when the vehicle is operating in the stationary electrical power generating mode.
- Claim 2Depends on #1
The method of claim 1 , where the transmission shifter is prevented from moving from a park position to a drive position or a reverse position unless a human driver overrides operation of a shift locking device, and where the shift locking device automatically
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (10)
Non-Patent Literature (1)
- Grayson, W., “Ford to Build a Hybrid F-150 with Integrated Generator for Jobsites,” Equipment World Website, Available Online at https://www.equipmentworld.com/two-bridge-replacements-cornplete-at-rondout-reservoir-in-ny-2/Jan. 3, 2017, 3 pages.