Patents
US 11,255,142 B2#56248454 Most CitedActiveUnited States (USPTO)Utility

Systems and methods for detecting steps in tubular connection processes

1Forward Citations (#56248454 Global)
0.2/yrCitation Velocity (#29835660 Global)
0.80Citation PageRank (#56248454 Global)
28Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

In systems and methods for detecting steps in connection processes used in well operations using drilling rigs to manipulate tubular strings (such as drill strings and casing strings), sensor data gathered by data acquisition systems (such as electronic data recorders) associated with a drilling rig is analyzed to identify time intervals corresponding to specific steps constituting the complete connection process in question (such as connection make-up or connection break-out). These time intervals are compared against target or benchmark values for the corresponding process steps, thus facilitating identification of “invisible lost time” (ILT), determination of the causes of the ILT, and determination of appropriate measures to mitigate or eliminate the causes of the ILT. These systems and methods eliminate or minimize the need for onsite data collection by human observers using stopwatches or other manual data collection means.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for detecting the occurrence of a selected connection process step in a well operation involving manipulation of a string of tubular elements by a drilling rig incorporating a travelling block, wherein the selected connection process step is selected from the group consisting of connection make-up steps and connection break-out steps, said method comprising the steps of: (a) obtaining time-series measurements indicative of one or both of a rotation rate applied by the drilling rig and a torque applied by the drilling rig; (b) selecting one or more time intervals within a selected time

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (28)

PatentTitleYearCitations
US 4,592,125 AMethod and apparatus for analysis of torque applied to a joint198685
US 6,212,763 B1Torque-turn system for a three-element sucker rod joint200172
US 2004144547 A1Methods and apparatus for applying torque and rotation to connections—63
US 2004154832 A1Method and apparatus for controlling wellbore equipment—34
US 7,031,840 B1Drilling performance assessment process200615
US 7,128,167 B2System and method for rig state detection200672
US 2008060481 A1Oilfield tubular spin-in and spin-out detection for making-up and breaking-out tubular strings—10
US 2014116687 A1Graphical evaluator for tubular makeup—27
US 2014246238 A1System and console for monitoring and managing well site operations—39
US 2014303894 A1System and console for monitoring and managing casing running operations at a well site—6
US 2015021016 A1Device and method for measuring torque and rotation—34
US 2015371344 A1Automated Rig Activity Report Generation—7
US 2017037691 A1Drilling system and method of operating a drilling system—22
US 2017204705 A1Method and system for measuring non-drilling times and their application to improve drilling unit efficiency—11
US 2017248000 A1System and method for determining productivity of a drilling project—8
US 9,792,571 B1Efficiency tracking system for a drilling rig201711
US 2017328178 A1Methods for continuously improving drilling and completions operations—5
US 2018047117 A1Symbolic rigstate system—9
WO 2018/038963 A1System and method for drilling rig state determination—6
US 2018066517 A1Timeline visualization of events for monitoring well site drilling operations—2
WO 2018/058214 A1Automated system and method for real-time auditing and performance ranking (feedback) of petroleum well construction operations—9
US 2018096277 A1Method for standardized evaluation of drilling unit performance—12
US 2018216440 A1Systems and methods for drilling productivity analysis—1
US 2019004882 A1Drilling tubular identification—7
WO 2019/119107 A1System and method for optimizing tubular running operations using real-time measurements and modelling—6
US 2020224525 A1Utilizing Vision Systems at a Wellsite—16
US 2020355063 A1System and method for optimizing tubular running operations using real-time measurements and modelling—18
US 2021115742 A1Drill pipe tally system—12

Non-Patent Literature (3)

  • International Search Report re PCT/CA2020/000101, issued by the ISA/CA dated Oct. 28, 2020.
  • OTC-28742-MS, “Application of Real-time Video Streaming and Analytics to Breakdown Rig Connection Process”, paper presented at Offshore Technology Conference, Houston, Texas, Apr. 30 to May 3, 2018.
  • Written Opinion of the International Searching Authority re PCT/CA2020/100101, completed by the ISA/CA on Oct. 27, 2020, and issued by the ISA/CA dated Oct. 28, 2020.