Patents
US 11,244,262 B2#32150979 Most CitedActiveUnited States (USPTO)Utility

Methods and systems for deploying equipment required to meet defined production targets

3Forward Citations (#32150979 Global)
0.8/yrCitation Velocity (#10211394 Global)
1.11Citation PageRank (#35888779 Global)
24Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Methods and systems determine at least one production constraint for a material loading system and a material processing system; estimate an effect of entropy on a cycle time of a material conveying system to produce a future cycle time estimate; estimate an effect of entropy on a material processing time to produce a future material processing time estimate; predict whether a delay will occur during the operation of the material loading, material conveying, and material processing systems; estimate a duration of the predicted delay; determine a loading system capacity and a conveying system capacity required to meet the defined production target based on the production constraint and estimates of the future cycle time, the future material processing time, and the duration of the predicted delay; and deploy one or more material loading and conveying systems to meet the determined loading and conveying system capacities.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 3.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A system for deploying equipment required to meet a defined production target for a material processing system, the equipment including at least one material loading system and at least one material conveying system, comprising: a production constraint module, said production constraint module generating at least one of a process delay time and a planned downtime for at least one of the material loading system and the material processing system; a stochastic simulator; a cycle time and variance module operatively associated with said stochastic simulator, said cycle time and variance module pr

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (24)

PatentTitleYearCitations
US 5,327,347 AApparatus and method responsive to the on-board measuring of haulage parameters of a vehicle1994112
US 2003069680 A1Multi-stage truck assignment system and method—61
US 2009096637 A1Distributed Mine Management System—37
US 2012288328 A1Integrated Paving Process Control For A Paving Operation—109
US 2013054133 A1Guided maneuvering of a mining vehicle to a target destination—146
US 2014089035 A1Mining Operation Control and Review—32
US 2015310674 A1System for providing on-site service for industrial equipment—22
US 2016063419 A1Inventory optimization tool—29
US 2016238403 A1Assistive vehicular guidance system and method—15
US 2016342915 A1Autonomous Fleet Size Management—29
US 2017205814 A1Truck process management tool for transport operations—39
US 2017351241 A1Predictive and prescriptive analytics for systems under variable operations—92
US 2018284758 A1Methods and systems for industrial internet of things data collection for equipment analysis in an upstream oil and gas environment—302
US 2018293053 A1Random number generator including entropy source—7
US 2019129405 A1Systems and methods for processing data collected in an industrial environment using neural networks—33
US 2019220827 A1Disruption control in complex schedules—16
US 10,380,522 B1Asset allocation evaluation system201910
US 2019265684 A1System and method for integrating production process—9
US 10,481,579 B1Dynamic training for assembly lines201938
US 2020225655 A1Methods, systems, kits and apparatuses for monitoring and managing industrial settings in an industrial internet of things data collection environment—349
US 2020286042 A1Management method and system for detailed engineering of plant projects—9
US 2021109690 A1System and method for tracking production line productivity with an industrial printer—7
US 2021118066 A1Methods and systems for the batch delivery of material to a continuous material processor—11
US 2021174279 A1Mining System—16

Non-Patent Literature (3)

  • Asbjornsson et al. (2016), “Modelling of discrete downtime in continuous crushing operation,” Minerals Engineering, 98, 22-29. Doi: 10.1016/j.mineng.2016.07.003. Abstract; p. 23 para 7; p. 26 para 4; p. 27 apra 1,2.
  • Jaoua et al., (2012), “Specification of an intellegent simulation-based real time control architecture: Application to truck control system,” Computers in Industry, 63, 882?894. DOL: 10.1016/j.complnd.2012.07.002; Abstract; p. 884 para 3; p. 888 para3; p. 889 para 13; p. 891 para 2.
  • PCT Internatinal Serch Report and Written Opinion, dated May 28, 2021, for corresponding International Application No. PCT/US2021/022494, 10 pages.