Patents
US 11,215,033 B2#44895852 Most CitedActiveUnited States (USPTO)Utility

Drilling trouble prediction using stand-pipe-pressure real-time estimation

2Forward Citations (#44895852 Global)
0.5/yrCitation Velocity (#16865245 Global)
0.89Citation PageRank (#48197662 Global)
46Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Raw, real-time drilling data is pulled from a centralized database for processing. The raw, real-time drilling data is re-formatted into a format required for processing by one or more predictive models. Real-time processing is performed with respect to one or more drilling parameters associated with the re-formatted data using the one or more predictive models to generate output data. The output data received from the one or more predictive models is re-formatted for storage in the centralized database. The reformatted output data is retrieved from the centralized database for analysis with respect to visualization, generating alerts, or generating recommendations.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 46 · Forward citations: 2.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method, comprising: pulling raw, real-time drilling data from a centralized database for processing; re-formatting the raw, real-time drilling data according to a format required for processing by one or more predictive models; performing real-time processing with respect to one or more drilling parameters associated with the re-formatted data using the one or more predictive models to generate output data, wherein the real-time processing comprises: identifying a time interval during which mud flow-in values are within a fluctuation threshold, wherein the identified int

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (46)

PatentTitleYearCitations
US 4,845,628 AMethod for optimization of drilling costs1989103
US 5,952,569 AAlarm system for wellbore site1999130
US 2004040746 A1Automated method and system for recognizing well control events—167
US 6,724,687 B1Characterizing oil, gasor geothermal wells, including fractures thereof200468
US 6,820,702 B2Automated method and system for recognizing well control events2004152
US 2005010382 A1Methods for evaluating and improving drilling operations—27
US 6,868,920 B2Methods and systems for averting or mitigating undesirable drilling events200566
US 2005087367 A1System and method for interpreting drilling data—60
US 2007185696 A1Method of real-time drilling simulation—110
US 2008181230 A1Remote monitoring of wellsite data—47
US 2008208475 A1Drilling collaboration infrastructure—102
US 2008289877 A1System and method for performing a drilling operation in an oilfield—75
US 2009132458 A1Intelligent Drilling Advisor—206
US 2010032165 A1Modeling And Designing of Well Drilling System That Accounts For Vibrations—54
US 2010235101 A1Method and system for monitoring a drilling operation—19
US 2011174541 A1Method and System for Predicting Performance of a Drilling System—122
US 8,121,971 B2Intelligent drilling advisor2012100
US 8,170,800 B2Method and system for monitoring a drilling operation201232
US 2012123756 A1Drilling Advisory Systems and Methods Based on At Least Two Controllable Drilling Parameters—101
US 2013179136 A1System and method for simultaneous visualization of fluid flow within well completions and a reservoir—3
US 8,615,363 B2Method and system for monitoring a drilling operation20132
US 2014067353 A1Wellbore completion and hydraulic fracturing optimization methods and associated systems—113
US 2014116776 A1Methods and systems for improved drilling operations using real-time and historical drilling data—223
US 2014121972 A1System and method for well data analysis—33
US 2014151121 A1Automated directional drilling apparatus and methods—76
US 8,752,648 B2Method and system for predicting a drill string stuck pipe event201412
US 2014277752 A1Drilling Advisory Systems and Methods to Filter Data—71
WO 2014/160561 A1Automated rig activity report generation—29

Non-Patent Literature (5)

  • “Salminen et al., ““IADC/SPE-178888-MS Stuck Pipe Prediction Using Automated Real-Time Modeling and Data Analysis,”” IADC/SPE Drilling Conference and Exhibition 2016, retrieved from URL <https://www.onepetro.org/downl oad/conference-paper/SPE-178888-MS?id=conference-paper/SPE-178888-MS>, retrieved o
  • GCC Examination Report in GCC Appln. No. GC 2019-37556, dated Jun. 2, 2021, 4 pages.
  • GCC Examination Report in GCC Appln. No. GC 2019-37556, dated Jun. 29, 2020, 4 pages.
  • GCC Examination Report in GCC Appln. No. GC 2019-37556, dated Nov. 19, 2020, 6 pages.
  • International Search Report and Written Opinion issued in International Application No. PCT/US2019/031423 dated Jul. 16, 2019, 17 pages.