Interval rationalization for completed maintenance services
Abstract
A computing device for scheduling maintenance services for an earthmoving machine is disclosed. The computing device includes an input device configured to receive work hour input associated with work operations of the earthmoving machine and a visual display on board the earthmoving machine. The computing device further includes a processor configured to execute instructions for receiving the work hour input from the input device and determining current work hours associated with a completed maintenance service of the earthmoving machine based on the work hour input. The processor is further configured to execute instructions for presenting a user of the earthmoving machine, via the visual display, with one or more service interval rationalization options based on the current work hours and scheduling one or more subsequent planned maintenance services based on the one or more service interval rationalization options.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 41 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of updating a maintenance schedule for an earth-moving machine comprising: receiving, by an electronic maintenance control device and from a computing device that stores data regarding the earth-moving machine, the maintenance schedule; receiving, by the electronic maintenance control device and via a network, telematics data from a telematics system, of the earth-moving machine, that includes one or more sensors that track operation of the earth-moving machine; determining, by the electronic maintenance control device, that a maintenance service is completed according to the maintena
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (41)
Non-Patent Literature (2)
- A. B. M. R. Islam et al., “Efficient black-box maintenance scheduler and rescue system,” The 2nd International Conference on Next Generation Information Technology,pp. 159-162. (Year: 2011).
- J. Brown and B. J. McCarragher, “Maintenance resource allocation using decentralised co-operative control,” 1999 Information, Decision and Control. Data and Information Fusion Symposium, Proceedings (Cat. No. 99EX251), pp. 41-46, doi: 10.1109/IDC.1999.754124. (Year: 1999).